eia for a water pipeline – tete province

Transcrição

eia for a water pipeline – tete province
Mocuba Solar PV Project
Simplified Land Use and Compensation
Plan (SLUCP)
2015.11.27 (English version)
DRAFT
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
TABLE OF CONTENTS
TERM GLOSSARY ................................................................................................................................... 5
ACRONYM AND ABBREVIATION LIST .................................................................................................... 6
1
INTRODUCTION........................................................................................................................... 7
2
PROJECT DESCRIPTION ............................................................................................................... 8
3
BASIC AND GUIDING PRINCIPLES FOR A SIMPLIFIED COMPENSATION PLAN .......................... 12
4
LEGAL FRAMEWORK ................................................................................................................. 13
4.1
THE CONSTITUTION OF THE REPUBLIC.......................................................................... 13
4.2
REGULATIONS ON THE RESETTLEMENT PROCESS RESULTING FROM ECONOMIC ACTIVITIES ............ 14
4.3
TECHNICAL GUIDELINE FOR THE
ELABORATION AND IMPLEMENTATION OF THE
RESETTLEMENT PLANNING PROCESS ........................................................................................ 14
4.4
DIRECTIVE ON THE EXPROPRIATION PROCESS ....................................................................... 14
4.5
ENVIRONMENTAL LAW ..................................................................................................... 15
4.6
REGULATION ON THE ENVIRONMENTAL IMPACT ASSESSMENT PROCESS .................................... 15
4.7
GENERAL DIRECTIVE FOR PUBLIC PARTICIPATION IN THE ENVIRONMENTAL
IMPACT ASSESSMENT PROCESS ........................................................................................... 15
4.8
5
LAND LAW AND LAND LAW REGULATION .................................................................. 15
CENSUS RESULTS AND ASSETS INVENTORY .............................................................................. 17
5.1
AFFECTED POPULATION ............................................................................................... 17
5.2
VULNERABLE GROUPS .................................................................................................. 18
5.3
FARM PLOTS (MACHAMBAS) ..................................................................................... 19
5.4
FRUIT TREES ............................................................................................................... 23
5.5
ANCILLARY STRUCTURES ............................................................................................ 26
6
ELIGIBILITY CRITERIA AND RIGHTS CHART ................................................................................ 28
7
ASSESSMENT PROCESS ............................................................................................................. 30
Impacto, Estudos e Projectos Ambientais, Lda
2
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
8
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
7.1
ANNUAL CROPS .......................................................................................................... 30
7.2
FRUIT TREES ............................................................................................................... 30
7.3
ANCILLARY STRUCTURES ................................................................................................... 30
IMPLEMENTATION STRUCTURE AND RESPONSIBILITIES .......................................................... 31
8.1
IMPLEMENTATION STRUCTURE ....................................................................................... 31
8.2
BIDDER’S RESPONSIBILITIES ........................................................................................ 32
8.3
DISPUTE RESOLUTION COMMITTEE (DRC) RESPONSIBILITIES ................................................... 33
8.4
DISTRICT GOVERNMENT RESPONSIBILITIES ............................................................... 34
8.5
COMMUNITY LEADERSHIP RESPONSIBILITIES ............................................................ 35
9
COMPENSATION PAYMENT ...................................................................................................... 36
10
CLAIMS AND DISPUTE RESOLUTION ......................................................................................... 38
10.1 CLAIM REGISTRATION AND DOCUMENT PROCESS ............................................................... 38
10.2 INSTANCES OF CLAIM AND DISPUTE RESOLUTION ...................................................... 39
11
INDICATIVE BUDGET ................................................................................................................. 41
12
IMPLEMENTATION SCHEDULE .................................................................................................. 43
13
CONSIDERATIONS AND FINAL RECOMMENDATIONS ............................................................... 44
Figure List
Figure 1. Delimitation frames of the Project area (DUAT area) .............................................................. 9
Figure 2 Typical Photovoltaic Power Station................................................................................................ 10
Figure 3. Project location ...................................................................................................................................... 11
Figure 4. Farm plots affected by the Project (DUAT area and access road....................................... 21
Figure 5. Pumpkin farm plot within the Project area. ............................................................................... 22
Figure 6. Manioc farm plot within the Project area.................................................................................... 23
Figure 7. Mango trees within the Project area. ............................................................................................ 25
Figure 8. Banana farm plot within the Project area. .................................................................................. 26
Figure 9. Wells inside the Project area. ........................................................................................................... 27
Figure 10. Recommended implementation structure ............................................................................... 32
Figure 11. Schematic representation of the claim process ..................................................................... 40
Figure 12. Implementation Schedule ............................................................................................................... 43
Impacto, Estudos e Projectos Ambientais, Lda
3
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
Table List
Table 1 Project Area Approximate Coordinates ............................................................................................ 8
Table 2. Breakdown of the population affected by age group and gender ....................................... 17
Table 3. Vulnerable situations reported ......................................................................................................... 18
Table 4. Number of farm plots per household .............................................................................................. 19
Table 5. Farm plot use ............................................................................................................................................ 19
Table 6. Most representative agricultural crops ......................................................................................... 22
Table 7. Fruit trees lost to the Project.............................................................................................................. 24
Table 8. Ancillary structures forfeited to the project ................................................................................ 26
Table 9. Rights Chart ............................................................................................................................................... 29
Table 10. Indicative Compensation Budget ................................................................................................... 41
Impacto, Estudos e Projectos Ambientais, Lda
4
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
TERM GLOSSARY
Household
Project Area
Census and Asset
Inventory
Head of Household
Local Community
Eligibility Criteria
Economic
Displacement
Physical Displacement
Use Rights and
Utilization of Land
Vulnerable Groups
Special License
Farm Plot
Rights Matrix
Claim Registration and
Dispute Resolution
Mechanism
Group of individuals linked by family legal relations, living in communal housing
and sharing a household economy (definition of the National Institute of
Statistics of Mozambique). Under this document, the household designation is
also used to indicate the families living in adjacent neighbourhoods to the
Project area and who have land use rights (inheritance or through customary
law) or property within this area.
The entire area of the direct footprint of the Project, equivalent to the DUAT
area (126 ha) and the partial protection zone of the access road.
Field research performed to identify and determine the number of affected
people and their property, according to National legislation or Internationally
accepted good practice. This is in terms of a full and precise headcount of
individuals, families, land, business and other assets on the ground that are
affected by the Project. The definition also includes the eligibility criteria for
compensation and transfer of assets and other agreements emanating from
consultations with affected communities and local leaders in the Project area.
Household member recognized by the other members as household head,
whose regular presence in the house and whose authority is essential in making
decisions concerning the household.
Grouping of families and individuals living in a territorial area at the local level.
Who have an interest in safeguarding common interests through the protection
of residential areas, agricultural areas (whether cultivated or fallow), forests,
sites of cultural importance, pastures, water sources, and areas of potential
community expansion.
Criteria for the identification of parties eligible for compensation, based on the
nature of the Project impact on the affected parties in question and the types of
rights that affected parties have in relation to affected land and property.
Loss of income sources or means of livelihood resulting from the acquisition of
land or the obstruction of access to natural resources (land, water or forests) as
a result of Project construction or operation (including the construction of
associated infrastructure).
Loss of housing and real estate resulting from land acquisition associated with
Project induced resettlement.
Legal rights that naturalized persons and local communities acquire in relation
to land as per the requirements and limitations of the Land Law (Law 19/97 of
October 1st).
Encompass people who on grounds of gender, age, physical or mental disability,
economic disadvantage or social status may be more adversely affected (in
relation to a specific project and its impacts) as compared to other members of
society and who may be limited with regard to their ability to claim or take
advantage of the assistance and benefits related to the project.
Document authorizing the performance of all economic activities in the areas of
full or partial protection.
Local agricultural land associated with subsistence farming.
Identifies the categories of persons eligible for compensation damages and the
specific rights for each category within the scope of these compensation
damages. The rights defined for each category of eligible persons correspond to
compensatory measures which will vary depending on the type of losses
incurred.
Administrative mechanisms and processes established in order to allow people
affected by the Project to submit grievances associated with the compensation
process, or other aspects related to the acquisition and expropriation of their
Impacto, Estudos e Projectos Ambientais, Lda
5
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
Moratorium
Affected Parties
property, and which provides for the evaluation of claims and the fair, equitable
and transparent mediation of potential disputes resulting therein.
Deadline for land occupation in an area that is acquired for Project
development. All persons who have proven occupation of land after this date
are not eligible for any compensation/damages. Normally, the moratorium is
declared after the completion of the census and asset inventory. In
Mozambique, given that the land is state property, the declaration of the
moratorium is seen as an administrative act, which should be practiced by a
competent State authority. However, the declaration of the moratorium is not
expressly defined by law.
Any person or group of people who, as a result of the implementation of a
project, loses the right to own use or benefit from infrastructure, land, annual
crops or perennials and trees, or any other fixed or movable assets in whole or
in part, permanently or temporarily.
ACRONYM AND ABBREVIATION LIST
H
EIA
IC
HH
DINOTER
ha
MZM
NGO
APs
CSRP
GIS
SPSS
SEZ
Household
Environmental Impact Assessment
Identity Card
Head of Household
Direcção Nacional de Ordenamento Territorial e Reassentamento
(National Directorate for Land Planning and Resettlement)
Hectare
Metical
Non-Governmental Organization
Affected Parties
Corporate Social Responsibility Plan
Geographic Information System
Statistical Package for Social Sciences
Special Economic Zone
Impacto, Estudos e Projectos Ambientais, Lda
6
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
1
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
INTRODUCTION
This Simplified Land Use and Compensation Plan (SLUCP), intends to set out a plan to
compensate all parties who are economically displaced by the development of the
Photovoltaic Power Station in Mocuba, Zambezia Province, Mozambique, in accordance
with the provisions of Mozambican law. The Project is the result of a partnership that
involves Electricity of Mozambique (EDM), Scatec SA (Pty) Ltd1, and the Norwegian
Investment Fund (Norfund)2.
The Project has been classified by MITADER as a category B project and it proposes to
build and operate a 30MWac solar PV facility in an area of 126 hectares located near the
current substation in Mocuba, about 13km from the city center. The Project is thus
located in part of the Special Economic Zone (SEZ) of Mocuba, established by the
Government of Mozambique in May 2014.
Field surveys have confirmed that Project development will not result in the physical
displacement of any local communities. The analysis of the Project impacts, however,
indicates that the development will result in economic displacement and therefore,
according to Mozambican law and aligned to best international practices, mitigation of
these impacts will be achieved through a Compensation Plan, the details of which are
presented in this report.
1
A subsidiary of Solar Scatec AS, a company specialized in the use of solar energy based in Norway with offices in
several countries (including South Africa, The United States, Honduras and Jordan)
2
An agency that promotes investment in sustainable projects in developing countries and that has a strong presence in
Southern and Eastern Africa, with offices in Johannesburg, Maputo and Nairobi.
Impacto, Estudos e Projectos Ambientais, Lda
7
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
2
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
PROJECT DESCRIPTION
The aim of developing a Photovoltaic Power Station in Mocuba is to expand the
production of renewable energy in Mozambique, diversify energy supply and stimulate
private investment in this sector.
The Project is a part of the EDM strategy of developing a renewable energy exploration
program through implementing energy production projects linked to the national
network, a strategy that aims to achieve the following objectives:




Security of energy supply;
Diversification of production options;
Rural electrification; and
Environmental sustainability.
In this context, EDM signed on December 22, 2014, a Memorandum of Understanding
with Solar Scatec and Norfund to assess the feasibility of establishing a PV power station
in Mocuba, in the center-north zone of Mozambique. The energy produced will be bought
by EDM, under a Power Purchase Agreement (PPA) for 25 years.
As stated above, the Project will be implemented in an area of 126 hectares located near
the current substation in Mocuba, about 13km from the city center. Table 1 below shows
the approximate coordinates of the four vertices that define the Project location.
Table 1 Project Area Approximate Coordinates
Point
Latitude
Longitude
A
16°49'11.88"S
37° 2'3.37"E
B
16°49'13.78"S
37° 2'49.65"E
C
16°49'47.97"S
37° 2'36.23"E
D
16°49'42.29"S
37° 1'56.64"E
Figure 3 illustrates the Project area location, also showing the limits of the DUAT area.
Impacto, Estudos e Projectos Ambientais, Lda
8
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
Figure 1. Delimitation frames of the Project area (DUAT area)
From a technical point of view, the Project involves the construction of a photovoltaic
power station composed of sets of solar panels mounted on metal substructures fixed to
the ground. The panels will be fitted with a tracker system that allows them to follow the
Sun, thereby optimizing the production of energy.
The solar energy harvesting stations use photovoltaic cells to capture and convert the
Sun's energy into electricity through a process referred to as "photovoltaic effect". The
photovoltaic cells are made of silicon which acts as a semiconductor, creating an
electrical current. Photovoltaic cells are grouped into modules. The grouping of modules
placed in the same support structure form a solar panel. When sunlight falls with enough
energy on these structures it produces a stream of electrons, thereby enabling the solar
panels to create usable electrical energy.
The various solar panels are grouped into larger units (arrays). The photovoltaic power
station in Mocuba will have a total of 494 sets of solar panels (arrays) installed, with a
40MW production capacity. The figure below illustrates a typical photovoltaic power
station.
Impacto, Estudos e Projectos Ambientais, Lda
9
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
Figure 2 Typical Photovoltaic Power Station
In addition to the sets of solar panels the following equipment will be installed:




Load monitoring equipment for the solar panels;
Measuring equipment for meteorological factors (rain, intensity and direction of
wind, solar radiation, humidity and temperature);
Inverters and associated air conditioning equipment; and
A 20 kVA diesel generator to support the safety and monitoring systems in case of
power failure.
A dirt road providing access to the Project site will also be built. In addition permanent
support infrastructures will include:


An office building; and
A 2.5 meter high electrified fence around the power station perimeter and its
respective access gates and lighting at the main entrance.
Figure 3 (next page) illustrates the location of the Project area in relation to the city of
Mocuba. The DUAT area limits are clearly marked.
Impacto, Estudos e Projectos Ambientais, Lda
10
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
Figure 3. Project location
Impacto, Estudos e Projectos Ambientais, Lda
11
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
3
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
BASIC AND GUIDING PRINCIPLES FOR A SIMPLIFIED
COMPENSATION PLAN
As mentioned above, the Project to develop a photovoltaic power station in Mocuba was
classified as a category B project and it will form part of an area belonging to the Special
Economic Zone (SEZ) in Mocuba, established by the Government of Mozambique in May
2014.
The Project will not result in any physical displacement of people in the surrounding areas,
and thereby will not demand any resettlement action. The Project will however impact on
agricultural land and some associated infrastructure, so there will be loss of rights of use and
occupation of land and loss of property and improvements.
In this context, this Simplified Compensation Plan (SCLUP) aims to mitigate economic
displacement situations, resulting from the implementation of the Project and aims to
ensure the protection of the legitimate interests of the Affected Parties (APs) in order to
ensure that any losses resulting from the implementation thereof are compensated fairly.
The SCLUP must meet the following key objectives:
1. Identify economic displacement situations generated by the Project and propose fair
and equitable compensation measures;
2. Set eligibility criteria for compensation measures;
3. Develop a rights framework typifying the losses induced by the Project and propose
adequate compensation;
4. Propose claim registration and dispute resolution mechanisms;
5. Define organizational responsibilities for the implementation of the compensatory
measures proposed;
6. Prepare an indicative budget and implementation schedule; and
7. Propose monitoring and assessment mechanisms for the implementation phase of
this SCLUP.
Impacto, Estudos e Projectos Ambientais, Lda
12
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
4
LEGAL FRAMEWORK
The Mozambican Legal Order contains a number of relevant legal instruments for the
involuntary displacement (physical or economic) of people. Particular attention will be given
to the following standards:
 The Constitution of the Republic;
 Regulations on the Resettlement Process Resulting from Economic Activities (Decree No.
31/2012 of August 8th);
 Technical Guideline for the Elaboration and Implementation of the Resettlement
Planning Process (Ministerial Decree 156/2014 of September 19th);
 Directive on the Expropriation Process for Territorial Planning Effects (Ministerial Decree
181/2010 of November 3rd);
 Environment Law (Law No. 20/97 of October 1st);
 Regulation on the Environmental Impact Assessment Process (Decree No. 45/2004 of
September 29th);
 General Directive for Public Participation in the Environmental Impact Assessment
Process (Ministerial Decree No. 130/2006 of July 19th); and
 Land Law (Law No. 19/97 of October 1st) and Land Law Regulation (Decree No. 66/98 of
December 8th).
4.1 THE CONSTITUTION OF THE REPUBLIC
One of the fundamental principles of Mozambican land law is that the land has been state
owned since national independence in 1975. This principle is enshrined in the constitution
and has survived the political and economic transformations that have occurred in
Mozambique since the late 1980s. In relation to the market economy it represents the
transitional period of a socialist-oriented development model.
Consecrating this principle, the current Constitution (2004), while recognizing the enjoyment
of the right of use and exploitation of land for all citizens, expressly states that the land is
state property, absolutely prohibiting its sale or taxation on any account, including seizure or
mortgage (Article 109 of the Constitution). Consequently, the State reserves the right and
responsibility to determine the conditions of use and exploitation of natural resources and
land, in order to safeguard land as a national interest (Articles 102 and 110 of the
Constitution)3.
3
The constitutional texts of 1975 and 1990 consecrated the same principle of state-owned land.
Impacto, Estudos e Projectos Ambientais, Lda
13
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
Without prejudice to this principle, however, the Constitution of the Republic also recognizes
local communities as holders of rights to the land, namely protecting the rights acquired
through inheritance or occupation, provided that such rights do not fall on land whose use
has been legally assigned to another person or entity (Article 111 of Constitution).
4.2 REGULATIONS ON THE
ECONOMIC ACTIVITIES
RESETTLEMENT
PROCESS
RESULTING
FROM
The recent Decree No. 31/2012 of August 8th approves the Regulations on the Resettlement
Process Resulting from Economic Activities, and consists of a set of basic rules and principles
on the resettlement process. These are aimed at ensuring that the population affected by
economic activities of the public or private sector result in a better quality of life or social
equity, and take into account the sustainability of physical, environmental, social and
economic aspects. The Decree also makes provision for the creation of the Monitoring and
Resettlement Supervision Technical Committee, a multi-sectoral body providing technical
advice to the Minister responsible for overseeing the Project affected area.
This regulation also establishes the procedures that must be met to govern the resettlement
plan, as well as the approach that will be adopted for public consultation.
4.3 TECHNICAL GUIDELINE FOR THE ELABORATION AND IMPLEMENTATION OF
THE RESETTLEMENT PLANNING PROCESS
Ministerial Decree No. 156/2014 of September 19th clarifies and expands the provisions of
the Regulations on the Resettlement Process Resulting from Economic Activities,
recommending the phasing of the process and providing accurate information for each of
the three recommended phases. Where applicable, the recommendations stipulated in the
Decree in regard to situations of economic dislocation will be followed.
4.4 DIRECTIVE ON THE EXPROPRIATION PROCESS
According to the principle of the primacy of public interest, this Directive allows for the
expropriation for territorial planning purposes, and establishes the principles to be used in
the calculation of their compensation. In turn, Ministerial Diploma 156/2014 of September
19th (Technical Guideline for the Elaboration and Implementation of the Resettlement
Planning Process) expressly provides in Article 1, for the applicability of the Expropriation
Directive relating to resettlement processes. Although it is part of the suite of Mozambican
legislation relating to the regulation of displacement situations (physical and economic), this
piece of legislation is not necessarily applicable to the Project. It does however contain some
Impacto, Estudos e Projectos Ambientais, Lda
14
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
formulas that would assist in the assessment of the value of structures that may be impacted
by the Project.
4.5 ENVIRONMENTAL LAW
The Environmental Law, approved by the Mozambican Parliament in July 1997 and published
in the Government Gazette on October 1st of that year, aims to establish the legal
framework for the proper use and environmental management to ensure sustainable
development. The law applies to all public and private activities that may directly or
indirectly have an impact on the environment (including socioeconomic environment). It
establishes the obligation to undertake mitigation measures to minimize the impacts
induced by development projects.
4.6 REGULATION ON THE ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
According to this Regulation, the granting of an Environmental License is a prerequisite for
the implementation of any Project. The Regulation stipulates the procedure to be followed in
order to obtain this License.
4.7 GENERAL DIRECTIVE FOR PUBLIC PARTICIPATION IN THE ENVIRONMENTAL
IMPACT ASSESSMENT PROCESS
This Directive defines the public participation process, which is considered an integral part of
the EIA process for activities classified as Category A. The Directive stipulates the
responsibility of the developer to ensure that public participation is undertaken during all
phases of a Project.
4.8 LAND LAW AND LAND LAW REGULATION
The Land Law (Law No. 19/97 of October 1st) implements the constitutional principles and
the recommendations of the National Land Policy. Thus, the law reiterates that the land
belongs to the State, however, natural, legal persons and communities can acquire use and
exploitation rights to land. The Land Law sets the terms of reference for the establishment,
exercise, modification, transfer and termination of the land-use right (called “DUAT”).
The law provides three ways of acquiring the DUAT4:
4

Occupation of land by individuals and local communities, according to the rules and
customary practices, as long as they are not contrary to the Constitution;

Occupation of land by individuals who have been using the land for at least ten years;
and
Article 12 of the Land Law
Impacto, Estudos e Projectos Ambientais, Lda
15
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE

SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
By means of an application to use land submitted by natural or legal persons to the
State.
There are some restrictions regarding the acquisition, use and exploitation of land rights.
Thus, these rights cannot be acquired in protected areas; however, special licenses may be
issued for the exercise of specific activities in terms of Article 9 of the Land Law.
Regulations associated with the Land Law were approved by Decree No. 66/98 of December
8th. These regulations reiterates that, under the law, the absence of a written title shall not
affect the validity of the right of use and exploitation of land and the rights acquired by
occupation in traditional ways (which is considered as being fully legitimate).
Impacto, Estudos e Projectos Ambientais, Lda
16
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
5
CENSUS RESULTS AND ASSETS INVENTORY
In order to identify the circumstances of economic displacement caused by the
implementation of the Project, Impacto Lda, in conjunction with the local authorities (the
District Services of the Agriculture and Land Registry and the Regulated Bivi), conducted a
census and net asset inventory involving all the households that reported owning property,
or having economic interests, within the area of direct influence of the Project (this included
agricultural land, fruit trees, auxiliary structures, etc.). The census and asset inventory was
conducted by interview teams trained for this specific purpose, under the guidance of a
socio-economist and a field supervisor from Impacto.
Questionnaires were used to interview affected households (using electronic forms
submitted with programmed Samsung tablets) and their assets were recorded and
georeferenced with the help of GPS technology. A photographic record was captured of the
heads of affected households and their identity cards. The results of the census and asset
inventory were recorded in a database which was set up for this project. The data was
captured with CSPRO support and the analysis was conducted with IBM SPSS support.
5.1 AFFECTED POPULATION
Two hundred and eight (208) households were registered in the Project area. These
households received numbered registration cards which can be used to identify them as
affected households who are eligible for compensatory measures. The eligibility focuses on
the household itself and not on the head of household (or any other household member
interviewed, in case of unavailability of the head of household). The total number of people
who make up the 208 households was 1,283. This corresponds to an approximate average of
6 people per household. Table 2 below shows the breakdown of the population affected by
age group and gender.
Table 2. Breakdown of the population affected by age group and gender
Gender
Age Groups
0–4
5 – 14
15 – 49
50 – 64
65 +
Total
Masculine
Feminine
103
210
258
52
16
639
76
228
271
42
27
644
Total
179
438
529
94
43
1283
As can be seen, and in accordance with the general trend in Mozambique, the affected
population is predominantly of a young age, with 617 individuals younger than 15 (48% of
Impacto, Estudos e Projectos Ambientais, Lda
17
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
the total population), and the number of women slightly higher than men. Only 43 people
(0.03% of the total population) are over 65.
5.2 VULNERABLE GROUPS
During the survey, several vulnerable people were recorded as being part of the 1,283
people who comprising 208 households affected by the Project. Table 3 below specifies the
types of vulnerabilities and the number of cases reported by the respondents (thus
potentially reflecting local perceptions). Note, for instance, that not all the elderly (43 in
total) were reported as being vulnerable. Annex 4 presents the families which are considered
vulnerable.
Table 3. Vulnerable situations reported
Vulnerability Type
Physical disability
Mental disability
Single mother
Widows
Woman head of household
Orphan child
Elderly (>65 years)
Chronic disease
Miscellaneous disabilities
Total
Number of
Incidents
26
8
33
31
12
45
28
28
11
8.5
3.6
14.8
13.9
5.4
20.2
12.6
12.6
4.9
222
100.0
%
Indicative values of compensation to be paid (according to the crops and fruit trees present in their
respective fields) have been assigned. Annex 4 shows the vulnerabilities of each household.
In accordance with the collected data, it appears that the reported vulnerability index is
considerably high (222 people) representing 17.3% of the total population. As can be seen,
vulnerability due to social causes plays an important role in all of the situations reported. The
most frequent case being represented by orphans (20.2%), single mothers (14.8%) and
widows (13.9%). These three categories constitute 48.9% of all vulnerable cases.
Social vulnerabilities do not, however, necessarily mean there is an inability to perform the
tasks required for daily survival. Special measures to support this social group should focus
on supporting sustainable production.
Physical vulnerabilities usually reduces or prevent a person’s capacity to undertake activities
to be self-sufficient. The mitigation for this type of vulnerability will have to be considered
for each individual case.
Impacto, Estudos e Projectos Ambientais, Lda
18
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
If the Sponsors implement a Corporate Social Responsibility Policy (CSRP), it is recommended
that it contains specific provisions to support households where there are vulnerable people,
in particular those whose vulnerability prevents them from continuing with their normal
productive activity.
5.3 FARM PLOTS (MACHAMBAS)
232 farm plots were recorded and mapped in the Project area, whose loss will have to be
compensated in accordance with the provisions of the law in effect. As can be seen by
consulting Table 4 below, the overwhelming majority of the 208 registered households own
only 1 farm plot within the Project area.
Table 4. Number of farm plots per household
Number of farm plots
per household
Households
%
1
185
88.9%
2
22
10.6%
3
1
0.5%
Total
208
100.0%
Most registered farm plots (161) are considered active, whether they are cultivated or in
preparation for cultivation. There are also 71 fallow fields. In total, the agricultural land area
affected by the Project and that will have to be reset through replacement land allocations
represents 139.1 hectares (see Table 5 below).
Table 5. Farm plot use
Number of
farm plots
%
Area (ha)
In use
161
69.4%
99.5
In fallow
71
30.6%
39.6
TOTAL
232
100.0%
139.1
Type of plot use
One must point out that 62 of the 208 surveyed households do not currently have a
productive activity within the Project area, having only fallow fields. Figure 4 shows, in
Google Earth support, the farm plots mapped during the assets inventory.
It should be noted that there are "divided" farm plots, ie fields in which part of the occupied
area lies within the area of the DUAT and elsewhere outside the DUAT area. In these cases,
Impacto, Estudos e Projectos Ambientais, Lda
19
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
during the implementation phase each case will be negotiated individually. If necessary then
a new measurement of the farm area will be undertaken.
Impacto, Estudos e Projectos Ambientais, Lda
20
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
Figure 4. Farm plots affected by the Project (DUAT area and access road
Impacto, Estudos e Projectos Ambientais, Lda
21
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
The Project area as well as the rest of the country, is dominated by subsistence agriculture in upland
regime carried out in an intercropping system. Normally, several crops are present on the same farm plot.
Figure 5. Pumpkin farm plot within the Project area.
Table 6 shows the most representative crops including the number of households that plant them.
Table 6. Most representative agricultural crops
Crops
Households
Manioc
Boer Beans
Peanuts
Corn
Nhemba Beans
Sweet Potatoes
Jugo Beans
Rice
Pumpkins
Sesame
Mapira
Tomatoes
Sugar Cane
99
74
42
38
38
12
6
6
4
2
2
2
1
Impacto, Estudos e Projectos Ambientais, Lda
22
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
Where applicable and beyond the loss of the right of access to land, existing crops will need to be
compensated. According to current practice, such compensation will be guided by the guidance values
provided in the annual table issued by the Agriculture Services for the Mocuba District (Appendix 2 of this
Plan). For calculation purposes, and in order to benefit households, it is suggested that they be used as the
basis of productivity values per hectare and cost per kg of manioc (cassava), the most representative
culture in the area.
Figure 6. Manioc farm plot within the Project area.
5.4 FRUIT TREES
1,466 fruit trees were recorded within the Project area. The most representative species are banana plants
(978 units, representing 66.7% of the total), mango trees (229 units, 15.6% of the total) and cashew trees
(177 units, 12.0% of the total.)
Impacto, Estudos e Projectos Ambientais, Lda
23
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
Table 7 shows the registered trees and the number of households to which they belong.
Table 7. Fruit trees lost to the Project
Tree Type
Banana
Mango
Cashew
Papaya
Orange
Guava
Lemon
Coconut
Palm
Other trees
Total
Number of
Households
44
76
45
4
5
5
2
5
1
2
189
Number of Trees
978
229
177
5
9
41
4
16
3
4
1,466
In summary, of the 208 registered households, 189 are owners of fruit trees of various species, with 19
households that do not have any fruit trees in the Project area. As is the case of agricultural crops, it is
suggested that fruit trees be compensated on the basis of tables referring to compensation prices
applicable to the Mocuba District or, in the event of shortcomings in the district tables for the Zambezia
Province. In addition, it is suggested that two replacement seedlings be delivered for every tree lost.
Impacto, Estudos e Projectos Ambientais, Lda
24
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
Figure 7. Mango trees within the Project area.
Impacto, Estudos e Projectos Ambientais, Lda
25
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
Figure 8. Banana farm plot within the Project area.
5.5 ANCILLARY STRUCTURES
Three ancillary structures were mapped within the Project area; these structures are used to support
productive activities.
Table 8. Ancillary structures forfeited to the project
Well
Porch
Number of
structures
2
1
Total
3
Structure Type
These structures should be assessed by a local assessor and properly compensated.
Impacto, Estudos e Projectos Ambientais, Lda
26
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
Figure 9. Wells inside the Project area.
Appendix 1 lists a summary of the Census Results and Assets Inventory, indicating the registered
households and providing brief information about them.
Impacto, Estudos e Projectos Ambientais, Lda
27
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
6
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
ELIGIBILITY CRITERIA AND RIGHTS CHART
For this particular Project, and in view of the information collected during the assets inventory with regard
to the type of losses that will be recorded, the categories of Affected Parties eligible for compensation
measures are as follows:




Holders of rights to agricultural land located within the Project area;
Owners of agricultural crops located within the Project area;
Owners of improvements located within the Project area;
Owners of fruit trees located within the Project area.
The Table below summarizes the rights chart applicable to the Project.
Impacto, Estudos e Projectos Ambientais, Lda
28
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
Table 9. Rights Chart
Type of Loss
Compensation Rights
Total or partial loss
of agricultural land
(land plots or parts
of land plots):
Loss of crops
Loss of fruit trees
Loss of ancillary
structures (farm plot
sheds, wells, fences,
etc.)


Agricultural land forfeited to the Project will be
compensated in kind (land for land) by alternative
allocation of land of equal or higher quality than the
lost land.

The Project will cover deforestation costs and
preparation of new land / farm plots in transfer sites.

Where possible, farmers will be informed in advance to
allow the harvest of annual crops before relocation.

Any loss of crop will be compensated on a cash basis,
based on the annual tables provided for this purpose
by the Agriculture Provincial Services, adjusted, where
appropriate, for the Total Replacement Value, as
defined by Performance Standard 5 of the IFC.

Monetary compensation, according to the annual
tables provided for this purpose by the Agriculture
Provincial Services.

Assignment of seedlings for planting in sufficient
quantity to compensate affected parties for the loss of
fruit trees (2 seedlings per lost tree).
Provision of replacement structures by the Project or
payment of monetary compensation and / or materials for
self-construction.
Responsibility
District Government
Bidder
Bidder
Bidder
Bidder
It should be noted that the current legislation gives considerable responsibilities to District Governments,
namely the responsibility to find and assign land to be replaced. During the fieldwork, it was found that the
government of the District of Mocuba showed some difficulty in regards to this issue, since it is the first
time that it is called to operate under the new legislative framework. Under no circumstances, however,
may the bidder take over this responsibility. The bidder must therefore sensitize the District Government
to this matter and, if necessary, appeal to the Provincial Government, since the National Directorate for
Land Planning and Resettlement (who supervises the cases of physical and economic involuntary
displacement of people) is in the process of forming Provincial Resettlement Committees.
Impacto, Estudos e Projectos Ambientais, Lda
29
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
7
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
ASSESSMENT PROCESS
This chapter describes the criteria and procedures to be used in the implementation of this Simplified
Compensation and Land Use Plan (SCLUP), according to the defined Chart of Rights.
7.1 ANNUAL CROPS
Compensation for loss of annual crops will be monetary. As mentioned above, the amount of
compensation to be awarded for this type of loss will be calculated based on the Compensation Table
applied in the Mocuba District (Appendix 2) and taking manioc as the reference crop; this crop has the
highest productivity rate per hectare of all the crops referenced in the area of influence of the Project. The
formula applied to calculate the amount of damages / compensation per crop is as follows:
Production per hectare/Area occupied by crop (m2) x price of crop per kg
The above criteria corresponds to a value of 55,000 MZM per hectare, such as expressed in the
Compensation Table in force for the Mocuba District.
7.2 FRUIT TREES
Compensation for loss of fruit trees will be monetary. The amount of compensation to be awarded for this
type of loss will be calculated based on the Compensation Table applied in the Mocuba District (Appendix
2) and where this is missing, the annual Table for the same purpose produced by the Agriculture Provincial
Services of Zambezia.
The formula applied to calculate the amount of damages / compensation per crop is as follows:
Number of trees (per type) x unit price per tree type
Monetary compensation for the loss of fruit trees should be complemented by the provision of two
seedlings for each tree lost to the Project.
7.3 ANCILLARY STRUCTURES
The ancillary structures affected by the Project should be assessed by a local assessor and properly
compensated.
Impacto, Estudos e Projectos Ambientais, Lda
30
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
8
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
IMPLEMENTATION STRUCTURE AND RESPONSIBILITIES
8.1 IMPLEMENTATION STRUCTURE
In Mozambique it is common practice that the responsibility for planning and implementing Compensation
Plans belongs to the Bidder of the Project. Given the sensitive nature of these processes, however, the
State reserves the right to monitor and follow them closely, and therefore certain state institutions play an
extremely important role. The District Government takes on a key role under the current regulatory
framework, namely by monitoring the entire process, the allocation of replacement land and the approval
of the Compensation Plan.
Figure 10 below shows the recommended implementation structure. Note, however, that the specific
responsibilities of the various government bodies involved in the process, will have to be defined and
agreed with their respective bodies, who have the prerogative to decide the level of active participation
they allow for you. For the management of complaints and / or any disputes that may arise in the process,
we recommend the establishment of a Dispute Resolution Committee, that should include staff from the
Bidder, representatives of the District Government and representatives of the relevant community leaders.
To ensure more transparency to the process, it is recommended as an option, the involvement of an
independent local NGO that can monitor the compensation payment to be awarded to the Affected
Parties. If the Bidder so decides, the Consultant can assist him in the process of identifying an NGO capable
of implementing such monitoring.
Impacto, Estudos e Projectos Ambientais, Lda
31
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
Figure 10. Recommended implementation structure
Although not directly a part of the implementation structure, we stress the key role of the new National
Directorate for Land Planning and Resettlement (DINOTER), which shall, in principle, be responsible for the
assessment and issuing of a technical opinion on this SCLUP, before final approval by the District
Government. The responsibilities of the key players in the process are summarized below.
8.2 BIDDER’S RESPONSIBILITIES
The Bidder has the lead role in the implementation of the Compensation Plan. Thus, the Bidder has the
following specific responsibilities:



Management, supervision and coordination of all activities required to implement the
Compensation Plan;
Ensure, directly or through a subcontractor and in coordination with the Provincial Government,
municipal authorities and community leaders, that the Affected Parties are duly informed of all
relevant activities of the process;
Ensure, directly or through a subcontractor and in coordination with the Provincial Government,
municipal authorities and community leaders, that the APs are aware of their rights and
obligations;
Impacto, Estudos e Projectos Ambientais, Lda
32
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE







Ensuring that the APs are properly informed about the proposed compensation package, including
their right to lodge an objection to the terms of calculation of the compensation amounts;
Establishing and managing a grievance and dispute resolution easy and affordable mechanism and
disseminate their procedures to the APs;
Ensure the necessary funds for the payment of compensation;
Ensure monitoring of the process, in coordination with the local government;
Consultation with relevant government officials (DINOTER and the District Government) on
possible alternatives to offset / compensate people for the loss of ancestral rights over the land
and the loss of land as a productive asset;
Hiring (or appointing) an officer with the necessary skills to interact on a regular basis with
communities, local leaders and Affected Parties, as Community Liaison Officer;
Proceed to debranching and cleaning of replacement land parcels before delivery to the families
affected.
Additionally, it is recommended that the Project Bidder establish an Employment Policy, to consider, to the
extent possible, priority hiring of members of households affected as local labour (unskilled and semispecialized), according to the needs of the various stages of the project.
It is also recommended that as part of a Corporate Social Responsibility Policy, if applicable, the Bidder
consider concrete actions that benefit affected households, with special attention to those indicated as
being vulnerable.
8.3 DISPUTE RESOLUTION COMMITTEE (DRC) RESPONSIBILITIES
The DRC should include representatives of the Bidder, the District Government and relevant local leaders
and shall be responsible for the management of the claims received.
The DRC has the following specific responsibilities:




Record, acknowledge and resolve in a timely manner, any claims received in relation to the Project
or the Compensation Process;
Record, acknowledge and resolve, in a timely manner, any disputes motivated by the Project or
the Compensation Process;
Maintain a current file of all open cases;
Forward to a higher court any complaints and/or disputes not solvable at the level of the DRC.
Impacto, Estudos e Projectos Ambientais, Lda
33
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
8.4 DISTRICT GOVERNMENT RESPONSIBILITIES
Under the current legislation, the District Government assumes a role of primary importance throughout
the whole Compensation Plan preparation and implementation process. Without prejudice to any other
duties, the District Government has the following specific responsibilities:









Track and monitor all stages of preparation of the Simplified Compensation and Land Use Plan;
Coordinate with the National Directorate for Land Planning and Resettlement to define all the
responsibilities incumbent upon it in the process, according to current Mozambican legislation;
Identify and allocate the necessary replacement land;
Provide a formal channel of communication and goodwill between community members and the
Bidder;
Guarantee that the APs are well informed by the local authorities (neighbourhood chiefs and
chiefs) at all stages of the compensation process;
Ensure that the APs are aware of their rights and obligations;
Supervise the compensation payment;
Approve the Simplified Compensation and Land Use Plan, on the advice of DINOTER;
Establish a moratorium to prevent the opportunist settlement of people in the area of
implementation of the Project and ensure compliance.
Impacto, Estudos e Projectos Ambientais, Lda
34
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
8.5 COMMUNITY LEADERSHIP RESPONSIBILITIES
Community leaders are an important link between the affected families and the Project. As such, they
have the following specific responsibilities:






Collaborate with the Project to ensure that all persons and property affected by the Project are
properly identified;
identify and address potential cases of opportunism and ensure compliance with the moratorium;
Resolve issues of plots of land overlapping, and undue claims of property and improvements;
Assist in contacting and scheduling restricted meetings with vulnerable APs;
Participate in the claim and / or dispute resolution process;
Manage the process of allocation of individual plots of land to affected families.
Impacto, Estudos e Projectos Ambientais, Lda
35
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
9
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
COMPENSATION PAYMENT
Payment of compensation is the Bidder's responsibility. Payments of compensation amounts should be
made individually to the head of each household affected, in the presence of two reputable witnesses.
This does not preclude the possibility of the compensation payment be made in cash. This system has,
however, several drawbacks, namely:

Potential security issues for the paying party, associated with the transport of large sums of money
to the place of payment.

Potential security issues for the recipient, when it becomes public knowledge that he keeps the
money received at home, thus making him vulnerable to criminal (assaults) or accidental situations
(fire, for example) that may prevent him from enjoying of the compensation received.
Thus, in order to ensure a safe, transparent and documented process, it is recommended that payment of
the agreed amounts be made to the Affected Parties by crossed check or bank transfer.
To enable this process, it is essential that the Bidder, in coordination with the District Government and
other relevant bodies, facilitate the acquisition of Identity Cards to allow for the opening of bank accounts
by the Affected Parties who might not have done so already. To this end, the following actions should be
undertaken:




Identification for the Affected Parties who do not yet have a bank account;
Ensure that the Affected Parties have the documentation required for the opening of a bank
account and provide support in obtaining this documentation, requesting through the District
Government, the displacement of a flying squad of the National Civil Identification Directorate to
Mugonda;
Identify and contact a bank institution with representation in the city of Mocuba to conduct the
necessary operations;
Facilitate contact between the Affected Parties and the selected financial institution.
The following process will be followed:



Cacluation of individual conpensation
Negotiation with affected parties
Adoption of grievance mechanism
Impacto, Estudos e Projectos Ambientais, Lda
36
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE

Monitoring the identification and allocation of replacement land

Monitoring the replacement and allocation of individual plots

Monitoring the preparation of parcles for delivery

Payment of monetary compensation
Impacto, Estudos e Projectos Ambientais, Lda
37
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
10 CLAIMS AND DISPUTE RESOLUTION
It is possible that over the compensation process disputes will arise related to the identification of
property located within the Project area and the ownership of such property. Thus, it is recommended that
the Bidder establish and publish grievance and dispute resolution procedures, to enable the Affected
Parties to exercise their legal rights, and open channels of communication to seek to establish the
necessary consensus regarding any claims or disputes that might emerge during the process. Ideally, there
should be forms and / or claim books available at the headquarters of the neighbourhoods in order to
ensure easy access by the interested parties to the complaint process (a model of claim and dispute record
card is suggested in Appendix 3).
Dispute resolution must be carried out with the intermediation of community leaders and the District
Government, and the process should be duly documented. For this purpose, it is recommended that a
Dispute Resolution Committee (DRC) be constituted, comprised of representatives of the Bidder, the
District Government and relevant community leaders. It is further recommended that the Bidder appoint a
Community Liaison Officer (CLO) in order to maintain effective and permanent contact with the Affected
Parties. If the parties, after mediation by the DRC, are unable to reach an agreement in due time, the
matter shall be referred to the Court of Justice of Mocuba.
The claim and dispute resolution mechanism must be accessible, easy to use and widely spread within of
the families affected.
10.1 CLAIM REGISTRATION AND DOCUMENT PROCESS
The process begins with the formal registration of a complaint. The Affected Parties may submit their
complaints in writing or verbally. The verbal complaints should, as soon as possible, be copied in writing by
the Bidder’s CLO in the presence of the claimant and, if possible, of an older witness (preferably a
community leader). The written record will be made in duplicate, the original to the Bidder (for
prosecution) and a copy to the complainant. All issues raised during the dispute resolution process, as well
as the resulting conclusions should be recorded in documents duly signed by the parties. These documents
should be included in their personal files.
As a general rule, it is recommended that whenever the Affected Parties require assistance in filling out
the complaint and dispute registration form, or in drafting letters and official requests, the Bidder (through
his Community Liaison Officer) or local leaders should be the ones proving it.
The Project Bidder will be responsible for managing the claim and dispute resolution mechanism (through
his Community Liaison Officer). The Project Bidder should keep records of the entire process, noting the
complaints presented, as well as any answers and the agreements reached. This information should to be
stored in a file (Claim and Dispute Database) in order to ensure that the process is transparent and
Impacto, Estudos e Projectos Ambientais, Lda
38
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
accessible. The Community Liaison Officer should ensure that all information regarding the solutions
proposed by each level of mediation is conveyed to those who submitted the complaint, and provide the
necessary explanations.
10.2 INSTANCES OF CLAIM AND DISPUTE RESOLUTION
The claim resolution process that is recommended here corresponds to a model established by practice
and which takes place typically in three instances.
The first instance is the direct negotiation between the parties (Claimant and Bidder), to arrive at a
consensus. If necessary, the parties may request mediation by a community leader, to arbitrate the
process. The deadline for resolving claims or disputes in the first instance is 7 days.
The second instance intervenes in case of an impossibility to reach an agreement by direct negotiation and
it consists of the DRC, the body who oversees the unsolved cases in the first instance. The deadline for
resolving claims or disputes in the second instance is 30 days.
The third and last instance is made up of the Court of Justice of Mocuba, to which the DRC should refer all
cases where it has not been possible to obtain an agreement between the parties. The Court's decision will
be final.
Figure 11 below shows a schematic representation of the claim process.
Impacto, Estudos e Projectos Ambientais, Lda
39
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
Figure 11. Schematic representation of the claim process
Impacto, Estudos e Projectos Ambientais, Lda
40
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
11 INDICATIVE BUDGET
Table 10 below shows the estimated compensation costs for loss of goods (annual crops and fruit trees)
and improvements (ancillary structures) recorded in the Project area. This budget was prepared on the
basis of the available evidence and is merely indicative and may be amended by the following
circumstances:

Changes to the Project design that will change the affected area and, consequently, the amount of
affected assets; and / or

Changes of compensation amounts as a result of the negotiation process between stakeholders in
the process (Bidder, District Government and Affected Parties).
Table 10. Indicative Compensation Budget
Item
Compensation Amount
(in MZM)
Agricultural crops
4.277.815,00
Fruit trees
1.853.510,00
Ancillary structures
TOTAL
50,000.00*
6.181.325,00
* Amount estimated as sufficient to offset the 3 structures to be assessed.
Note that in addition to the compensation costs above, the effective implementation of this plan will cover
other related costs, whose estimate is not covered by this Compensation Plan. These costs relate to the
following components:






Logistics of holding meetings / meetings with communities and households affected to disseminate
information about the SCLUP;
Treatment of identification documents for the Affected Parties that do not have them yet (if
applicable);
Negotiating with banks to open accounts for Affected Parties (if applicable);
Logistics inherent to the payment process of compensation / damages;
Monitoring activities and assessing the implementation of the SCLUP and other associated
activities;
Implementation, management and maintenance of the claim registration mechanism and dispute
resolution;
Impacto, Estudos e Projectos Ambientais, Lda
41
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE


SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
Consulting and negotiating with communities and local leaders about the compensation methods
for the loss of community heritage, including their monitoring and assessment activities;
Defining and implementing viable options to compensate for the loss of the land use right,
including their monitoring and assessment activities.
Impacto, Estudos e Projectos Ambientais, Lda
42
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
12 IMPLEMENTATION SCHEDULE
The implementation of this SCLUP should start as soon as it is approved. The figure below suggests an
implementation schedule, considering the main tasks to be performed as a reference.
Figure 12. Implementation Schedule
Month
1
Task
Month 2
Month 3
Calculation of Single Compensations
Negotiation with the Affected Parties
Assembly and disclosure of claim mechanism
Identification and allocation of replacement land
Replacement land installment and allocation of individual plots
Preparation of plots for delivery (debranching and clearing)
Payment of monetary compensation
Impacto, Estudos e Projectos Ambientais, Lda
43
Month 4
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
13 CONSIDERATIONS AND FINAL RECOMMENDATIONS
The situations of involuntary displacement of people (whether physical displacement or economic
displacement) due to the implementation of development projects have been increasingly scrutinized by
the Mozambican civil society. Motivated in part by some experiences considered as negative, this
increasing scrutiny is the source of the recent legislative effort made by the Government to regulate this
issue and the direct involvement trend of government bodies at all stages of these processes, with vast
responsibilities assigned to District governments in this regard.
A properly conducted procedure is therefore a fundamental prerequisite for the Project to get a solid
social consensus and establish a solid relationship with the surrounding communities. In this sense, it is
recommended that in addition to the implementation of the SCLUP (a merely compensatory instrument)
and according to international best practices, the Bidder insert in his Corporate Social Responsibility Policy,
measures aiming at the consolidation of household living standards affected in the post-compensation
period, such as protective measures for vulnerable people in particular and whenever possible, in the
context of the employment recruitment policy.
Impacto, Estudos e Projectos Ambientais, Lda
44
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
Appendix 1
LIST OF REGISTERED HOUSEHOLDS AND PROPERTY SUMMARY
LIST OF REGISTERED HOUSEHOLDS AND PROPERTY SUMMARY
Impacto, Estudos e Projectos Ambientais, Lda
45
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
Card
Nr.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
Interviewee Name
FRANCISCO SUMANA
LISERNA SANAIO
JOANQUINA JOAO
MUCUI
MONIZ AGUACHEIRO
LICIA INDIA
ROSALINA BERNARDO
ISABEL MUSSURMAQUE
VICTORINO SABONETE
JULIETA SANTOS
AMELIA AGOSTINHO
CARLITOS MANTEIGA
CARLOS SIMOES
MAULIDA MATHESSO
VIRGINIA ARMANDO
CANCELLED
NELSON MONIZ
LUCIA SUANGUETE
ROSA ARAUJO
OFELIA ORLANDO
MARIA JOAO
VALENTE
MUSSIQUELOTA
XADREQUE ERNESTO
ADELINA PEQUENINO
LUCIA MUALETE
CARLITOS MONIZ
RITA AGOSTINHO
INACIA ROSARIO
ADELINA MUNHOGA
CLEMENTINA MANUELA
LUISA MANUELA
LURDES DANIEL
PAULINA MADEIRA
PAULINA INTABELA
ISAURA FELIZ
FRANCISCA JOAO
Head of Household
Head of Household
Neighbourhood
Number of
where Household
Farm Plots
resides
Mugonda
1
Mugonda
3
Head of Household
Head of Household
Head of Household
HH’s Spouse
Head of Household
Head of Household
HH’s Spouse
Head of Household
Head of Household
Head of Household
Head of Household
HH’s Spouse
Mugonda
Mugonda
Mugonda
Mugonda
Samora Machel
Mugonda
Mugonda
Mugonda
Mugonda
Mugonda
Mugonda
Mugonda
1
2
1
1
2
1
1
1
1
1
1
2
Son/Daughter
HH’s Spouse
Head of Household
Head of Household
Head of Household
Mugonda
Mugonda
Mugonda
Mugonda
Mugonda
1
1
1
1
1
Head of Household
Head of Household
Head of Household
Head of Household
Head of Household
HH’s Spouse
HH’s Spouse
Head of Household
Head of Household
Head of Household
HH’s Spouse
HH’s Spouse
Head of Household
HH’s Spouse
Head of Household
Bive
Bive
Bive
Bive
Mugonda
Mugonda
Mugonda
Mugonda
Mugonda
Mugonda
Mugonda
Mugonda
Mugonda
Mugonda
Mugonda
1
1
2
1
1
1
1
2
1
1
1
1
1
1
1
Relationship with the
Head of Household (HH)
Impacto, Estudos e Projectos Ambientais, Lda
Ancillary
Structures
Fruit
Trees
1
22
15
3
3
3
4
2
51
39
7
1
1
1
5
1
46
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
Card
Nr.
Interviewee Name
Relationship with the
Head of Household (HH)
36
EUGENIA JOAQUIM
HH’s Spouse
37
38
39
40
RAQUETA PAULO
ALBERTINA RIBEIRO
LIDIA SOZINHO
GASPAR EUGENIO
Head of Household
HH’s Spouse
Head of Household
Head of Household
41
JORNE CARLITOS
Son/Daughter
42
AMELIA SANTOS
Head of Household
43
44
45
46
47
48
49
50
51
LAURINDA ANTONIO
JOANA ANTONIO
VASCO PEDRO MANGAO
OSVALDO ALBERTO
LIMITADA MANZACAO
JAIME RIBEIRO
LUISA BETINHO
AIDA ANTONIO
FATIMA ALFREDO
ARTUR FONSECA
MANUEL
ASISA AUGUSTA EMILIO
LUISA FABIO RUAONE
LAURA VALENTIM
EUSEBIO DANIEL JOAO
GUNLELA CAMPOS NICUE
JULIETA NDUHA
FRANCISCO NAHIVINERO
Head of Household
HH’s Spouse
Son/Daughter
Head of Household
Head of Household
Head of Household
HH’s Spouse
HH’s Spouse
Head of Household
ALBERTO JOSE NIBODO
NOEMIA SOZINHO
ESTRELA LUIS
SEBASTIAO MIUME
FERNANDO SOZINHO
VIOLENCIA
NUVUNGUIUA
MINDA AGOSTINHO
Head of Household
HH’s Spouse
HH’s Spouse
Head of Household
Head of Household
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
Head of Household
HH’s Spouse
HH’s Spouse
HH’s Spouse
Head of Household
Head of Household
Head of Household
Head of Household
HH’s Spouse
HH’s Spouse
Neighbourhood
Number of
where Household
Farm Plots
resides
Mugonda
1
Another
neighbourhood
1
Muandiva
1
Mugonda
1
Mugonda
1
Another
neighbourhood
1
Another
neighbourhood
1
Another
neighbourhood
1
Bive
1
Bive
1
Bive
1
Bive
1
Bive
1
Samora Machel
1
Samora Machel
1
Samora Machel
1
Muandiva
Samora Machel
Samora Machel
Samora Machel
Mugonda
Mugonda
Mugonda
Mugonda
Another
neighbourhood
Mugonda
Samora Machel
Muandiva
Mugonda
Another
neighbourhood
Mugonda
Ancillary
Structures
Fruit
Trees
16
1
1
13
27
16
12
1
1
2
1
1
1
1
1
32
1
1
1
1
1
2
4
4
1
1
4
Impacto, Estudos e Projectos Ambientais, Lda
3
1
8
47
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
Card
Nr.
Interviewee Name
Relationship with the
Head of Household (HH)
67
68
69
70
71
OLINDA VICTRORINO
JULIA NIVAVIHA
LUDES UASSANANIA
ANTONIO GUNZANHANE
CATARINA M CARASASSE
HH’s Spouse
HH’s Spouse
Head of Household
Head of Household
Head of Household
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
ZECA P MAZAMELA
GLORIA ALFREDO
JUBAR S BARROSO
FANITO H OLIVEIRA
Head of Household
HH’s Spouse
Head of Household
Head of Household
Head of Household
Head of Household
Head of Household
HH’s Spouse
Head of Household
HH’s Spouse
Head of Household
HH’s Spouse
Head of Household
HH’s Spouse
HH’s Spouse
HH’s Spouse
HH’s Spouse
Head of Household
Head of Household
Head of Household
Head of Household
Head of Household
HH’s Spouse
Head of Household
Head of Household
HH’s Spouse
HH’s Spouse
Head of Household
Head of Household
HH’s Spouse
HH’s Spouse
FERNANDO WARANIGANE
MARGARIDA VICENTE
DAUNISA T MACONDE
CLARA FRANCISCO
MANUEL DOS SANTOS
JOANA B CIPRIANO
ARGELIO MARIO
GABRIELA FRANCISCO
BERNARDO MOLE
JULIETA BENEDITO
HELENA ALBERTO
LAURA ARLINDO
ROSA PINTO
ALMEIDA GRAVATA
JULIO ANGELO
GERONIMO ANTONIO
ROSITA SUATERA
MADALENA SULYAI
JUDITE DOLIS
ANGELA ALFREDO
MABNUEL CARLITOS
ESTRELA ALBERTO
ZITA FABIAO
ROFINO EUGENIO
AFONSO EUGENIO
VELINDA EUGENIO
ILDA ALFAIATE
Neighbourhood
Number of
where Household
Farm Plots
resides
Muandiva
1
Mugonda
2
Samora Machel
1
Samora Machel
1
Muandiva
1
Another
neighbourhood
1
Samora Machel
1
Samora Machel
1
Samora Machel
1
Samora Machel
1
Mugonda
1
Samora Machel
1
Samora Machel
1
Samora Machel
1
Samora Machel
1
Samora Machel
1
Samora Machel
1
Samora Machel
2
Samora Machel
1
Samora Machel
1
Samora Machel
1
Muandiva
1
Mugonda
1
Mugonda
1
Mugonda
2
Muandiva
1
Mugonda
1
Samora Machel
2
Muandiva
1
Muandiva
1
Samora Machel
1
Mugonda
1
Bive
1
Bive
2
Bive
1
Samora Machel
1
Impacto, Estudos e Projectos Ambientais, Lda
Ancillary
Structures
WELL
Fruit
Trees
1
17
18
4
3
3
1
1
1
1
1
19
10
1
1
1
4
2
48
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
Card
Nr.
Interviewee Name
Relationship with the
Head of Household (HH)
103
104
105
106
CARLOTA CAETANO
ANTONIO JOSE MARECO
IZALGINA MARIO
BERTA MARCILIO
HH’s Spouse
Head of Household
Head of Household
HH’s Spouse
107
108
109
110
111
112
113
114
115
116
AISSA JOAQUIM
ALICE CEBOLA
JOAO CINQUENTA
JOSE MACONTARA
FATIMA OSORIO
LIDIA REMIGIO
RIEZA CHIPOSSI
HERMINIO PEQUENINO
MATILDE JOSE
FERNANDA HERMINIO
HH’s Spouse
Head of Household
Head of Household
Head of Household
HH’s Spouse
Head of Household
HH’s Spouse
Head of Household
HH’s Spouse
HH’s Spouse
117
118
119
120
121
122
123
MARIA RANGEIRO
ABILIO JANEIRO
DALILA DA GRACA
HORTENCIA ALFREDO
JORDAO DANIEL
GRACINDA ALBERTO
BENJAMIM MATECO
HH’s Spouse
Head of Household
Head of Household
Head of Household
Son/Daughter
Head of Household
Head of Household
124
125
126
127
127
128
129
130
131
132
133
134
135
JOANA TRAVAO
ARCANJO JOSE NICOLAO
JULIETA LAPISSONE
DANIEL PEDRO
DANIEL PEDRO
ISAC JOAQUIM
FATIMA MALADO
LUIS ROFINO
EUSEBIO NAVELA
ISABEL ALBINO
ISABEL FRANCISCO
AGOSTINHO PAULINO
ESTEFANIA MANUEL
HH’s Spouse
Head of Household
HH’s Spouse
Head of Household
Head of Household
Head of Household
HH’s Spouse
Head of Household
Head of Household
HH’s Spouse
HH’s Spouse
Head of Household
HH’s Spouse
Neighbourhood
Number of
where Household
Farm Plots
resides
Samora Machel
1
Samora Machel
1
Samora Machel
1
Samora Machel
1
Another
neighbourhood
1
Samora Machel
1
Samora Machel
1
Samora Machel
1
Samora Machel
1
Muandiva
1
Muandiva
1
Muandiva
1
Samora Machel
1
Samora Machel
1
Another
neighbourhood
1
Samora Machel
1
Samora Machel
1
Samora Machel
1
Samora Machel
1
Samora Machel
2
Mugonda
1
Another
neighbourhood
1
Samora Machel
1
Samora Machel
1
Samora Machel
1
Samora Machel
1
Samora Machel
1
Samora Machel
1
Samora Machel
2
Samora Machel
1
Samora Machel
1
Samora Machel
1
Muandiva
1
Samora Machel
1
Impacto, Estudos e Projectos Ambientais, Lda
Ancillary
Structures
Fruit
Trees
2
14
5
1
112
1
21
30
1
2
12
2
5
34
Porch
4
1
1
1
1
3
1
34
6
2
49
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
Card
Nr.
Interviewee Name
Relationship with the
Head of Household (HH)
136
137
138
139
140
141
142
BERNARDO PEDRO
EUSEBIO JOAO
ANTONIO AMELA
JULIETA PEDRO
LUISA ETAGA
CACILIA DA SILVA
ADELIA ARMANDO
Head of Household
HH’s Spouse
Head of Household
Head of Household
Head of Household
Head of Household
HH’s Spouse
143
144
145
146
147
148
149
150
LEONARDO FERNANDO
SOFIA AFONSO
ELIUAS ANGELO
ADELINA CHICUATE
FLORIANA CESAR
ISABEL NICOLOCA
FERNANDO SOZINHO
BONEFACIO MUATEPULA
Son/Daughter
HH’s Spouse
Head of Household
HH’s Spouse
HH’s Spouse
HH’s Spouse
Head of Household
Head of Household
151
152
153
154
155
156
157
158
159
160
161
162
JULIANO ANTONIO
VIDAL IMPUANO
CECILIA DOMINGOS
ROSA SILVA
JOAOZINHO RICARDO
FERNANDO VIRGILIO
ALEXANDRE MANGACAO
ANA ANGELO
ANGELO AMARO
SALIMO NIVAVIVA
OLINDO ALBERTO
DINIS GERENTE
Head of Household
Head of Household
HH’s Spouse
HH’s Spouse
Head of Household
Son/Daughter
Head of Household
HH’s Spouse
Head of Household
Head of Household
Brother/Sister
Head of Household
163
164
165
166
167
168
BELITO BERNARDO
RAZANO VICIAL
MARIA LUCIANO
CRISTIANO CASTIANO
ELISEU NICOSSE
TERESINHA MANTEIGA
HH’s Spouse
Head of Household
HH’s Spouse
Head of Household
Head of Household
HH’s Spouse
169
JOANA ALBERTO AVFELI
Head of Household
Neighbourhood
Number of
where Household
Farm Plots
resides
Samora Machel
1
Samora Machel
1
Mugonda
1
Samora Machel
1
Samora Machel
1
Samora Machel
1
Samora Machel
1
Another
neighbourhood
1
Samora Machel
1
Samora Machel
1
Samora Machel
1
Samora Machel
1
Muandiva
1
Samora Machel
1
Samora Machel
1
Another
neighbourhood
1
Samora Machel
1
Muandiva
1
Samora Machel
1
Samora Machel
1
Samora Machel
1
Samora Machel
1
Samora Machel
1
Samora Machel
1
Samora Machel
1
Outro bairro
2
Bive
1
Another
neighbourhood
1
Samora Machel
1
Samora Machel
1
Samora Machel
2
Mugonda
1
Samora Machel
1
Another
neighbourhood
1
Impacto, Estudos e Projectos Ambientais, Lda
Ancillary
Structures
Fruit
Trees
2
1
3
0
13
1
32
4
12
2
21
15
1
6
1
7
2
1
5
1
50
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
Card
Nr.
Interviewee Name
Relationship with the
Head of Household (HH)
170
171
172
173
174
175
176
177
LUIS ROQUE
JORGE NAMACUSSA
OCTAVIO BASILIO
TERESA EUGENIO
ALFREDO A NIBODO
ARTUR DINIS MULOIUA
SIDALIA R TOMAS
FERNANDO EUGENIO
Head of Household
Head of Household
Head of Household
HH’s Spouse
Head of Household
Head of Household
HH’s Spouse
Head of Household
178
AMERICO CUNHEVO
Head of Household
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
DINA JEMISONE CHIPON
HELENA ARTUR
EUSENIA ATIANA
ADELIA FABIAO
BETINHA MENDES
JAOQUINA ARMANDO
ZEFERINO PORTUGUES
LIDIA SEBASTIAO
LUCINDA JANEIRO
LUIS JACINTO
ANTUNES MUEVESSORO
PEDRO EUGENIO
MANUEL JULIO
ERNESTO MANGULETE
JULIETA LUIS
HH’s Spouse
HH’s Spouse
Head of Household
Head of Household
Head of Household
Head of Household
Head of Household
HH’s Spouse
HH’s Spouse
Head of Household
Head of Household
Head of Household
Head of Household
Head of Household
HH’s Spouse
194
195
196
197
JOSE MUIRA
REGINA ORLANDO
OSVALDO JOAO
AUGUSTO MUZENA
Head of Household
HH’s Spouse
Son/Daughter
Head of Household
198
199
200
201
202
203
MADALENA VICTOR
ANTONIO LUIS
LEONORA JOSE
EUGENIA MULALEIA
ADLAIDO FRANCISCO]
ALVES NATAMILO
Head of Household
Head of Household
HH’s Spouse
Head of Household
Son/Daughter
Head of Household
Neighbourhood
Number of
where Household
Farm Plots
resides
Mugonda
1
Samora Machel
1
Samora Machel
1
Samora Machel
1
Mugonda
1
Mugonda
2
Samora Machel
1
Mugonda
1
Another
neighbourhood
1
Another
neighbourhood
1
Muandiva
1
Samora Machel
1
Samora Machel
1
Samora Machel
2
Samora Machel
1
Samora Machel
1
Samora Machel
1
Samora Machel
1
Samora Machel
2
Samora Machel
1
Samora Machel
1
Samora Machel
1
Mugonda
1
Mugonda
1
Another
neighbourhood
1
Samora Machel
1
Samora Machel
1
Muandiva
1
Another
neighbourhood
1
Samora Machel
2
Samora Machel
1
Mugonda
2
Samora Machel
1
Mugonda
2
Impacto, Estudos e Projectos Ambientais, Lda
Ancillary
Structures
Fruit
Trees
222
1
54
1
2
40
3
87
1
3
101
1
59
1
46
1
1
3
1
1
51
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
Card
Nr.
Interviewee Name
Relationship with the
Head of Household (HH)
204
205
206
207
208
209
INES JOSE
CAROLINA TAIBO
SANTOS NAUELA
ARLINDO COMPANHEIRO
CASSIMO ARLINDO
MORAIS ALFREDO
Son/Daughter
HH’s Spouse
Head of Household
Head of Household
Head of Household
Did not reply
Neighbourhood
Number of
where Household
Farm Plots
resides
Samora Machel
1
Muandiva
1
Mugonda
1
Mugonda
1
Mugonda
1
Mugonda
2
Impacto, Estudos e Projectos Ambientais, Lda
Ancillary
Structures
Fruit
Trees
5
WELL
52
10
1
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
Appendix 2
TABLE OF COMPENSATION AMOUNTS FOR AGRICULTURAL
PRODUCE
FOR THE MOCUBA DISTRICT
Impacto, Estudos e Projectos Ambientais, Lda
53
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
DISTRICT OF MOCUBA
(Illegible Seal)
PRICE OF AGRICULTURAL CROP, FRUIT AND SHADOW TREES FOR COMPENSATION
Impacto, Estudos e Projectos Ambientais, Lda
54
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
PRICE OF AGRICULTURAL CROP, FRUIT AND SHADOW TREES FOR COMPENSATION
Impacto, Estudos e Projectos Ambientais, Lda
55
MOCUBA SOLAR PV PROJECT, ZAMBEZIA PROVINCE
SIMPLIFIED LAND USE AND
COMPENSATION PLAN (SLUCP)
Appendix 3
Detailed compensation table
Impacto, Estudos e Projectos Ambientais, Lda
56
PROJECT TO BUILD A PHOTOVOLTAIC POWER STATION
IN MOCUBA, ZAMBEZIA PROVINCE
N⁰ do
AF
Nome do CF
1
FRANCISCO SUMANA
2
Sub-Total
Sub-Total
JOANQUINA JOAO
4
MONIZ AGUACHEIRO
Sub-Total
Sub-Total
5
LICIA INDIA
6
ROSALINA BERNARDO
7
Area da
nachamba
(ha)
Estado da
machamba
Culturas
Area
ocupada
1
0.881467
Pousio
Nenhuma
0
1
0.881467
1
0.792366
Cultivada
Feijão boer
0.792366
10400
8241
2
0.222638
Cultivada
Mandioca
0.222638
55000
12245
3
0.086516
Cultivada
Arroz
0.086516
8000
692
3
1.10152
1
0.134101
1
0.134101
1
0.428918
Pousio
Nenhuma
0
2
0.224015
Pousio
Nenhuma
0
2
0.652933
1
0.199818
1
0.199818
1
0.346802
1
0.346802
1
0.823663
Cultivada
Mandioca
0.823663
2
0.875156
Pousio
Nenhuma
0.875156
2
1.698819
Machamba (Codigo)
LISERNA SANAIO
3
SIMPLIFIED COMPENSATION AND LAND USE PLAN (SCLUP)
Sub-Total
Sub-Total
ISABEL MUSSURMAQUE
Preco unitario da
cultura (MZM)
0
Nenhuma
0
Mandioca
0.199818
55000
0.199818
Pousio
Nenhuma
8
1
VICTORINO SABONETE
Sub-Total
9
10
JULIETA SANTOS
Sub-Total
AMELIA AGOSTINHO
Sub-Total
11
12
CARLITOS MANTEIGA
Sub-Total
CARLOS SIMOES
Sub-Total
13
MAULIDA MATHESSO
1.545663
55000
1
1.545663
1
0.449936
1
0.449936
1
0.430898
1
0.430898
1
0.356289
1
0.356289
1
0.638033
1
0.638033
1
0.84504
1.698819
Mandioca
Mandioca
1.545663
55000
0.449936
Mandioca
1
6250
0
0
0
0
0
0
0
10990
0
0
0
10990
10990
0
0
0
Mangueira
Mandioca
0.430898
55000
0.356289
55000
0.356289
Cultivada
Mandioca
0.638033
55000
0.638033
Cultivada
Mandioca
1
0
6250
6250
10990
45301
0.84504
85011
Bananeira
10
350
3500
Mangueira
8
6250
50000
Cajueiro
2
75
150
2
1000
55000
22
23699
2000
55650
Mangueira
3
6250
18750
Cajueiro
5
75
375
Laranjeira
1
420
420
Coqueiro
6
1000
6000
Palmeira
3
1000
3000
0
18
28545
24746
24746
0.430898
Cultivada
Total
Valuation
21178
85011
55000
0.449936
Cultivada
Estruturas de
apoio
0
14491
12245
692
27428
45301
1.545663
Cultivada
Valor total de
arvores de fruta
(MZM)
0
0
Cultivada
Preco da
arvore de
fruta
0
Coqueiro
Sub-Total
Nº de
arvores de
fruta
0
0
Cultivada
Tipo de
arvore de
fruta
0
1.10152
Pousio
Valor total da
cultura (MZM)
0
0
0
Mangueira
2
6250
12500
0
Laranjeira
1
420
420
250
Ateira
1
23699
0
4
19596
Cajueiro
3
19596
0
3
Bananeira
2
350
700
6250
6250
35092
Mangueira
1
35092
0
3
46477
Bananeira
4
250
13170
75
225
225
6950
350
1400
0
48801
50000
150
2000
100951
103761
375
420
6000
3000
113556
24746
24746
36199
420
250
36869
19821
19821
35792
6250
42042
47877
Impacto, Estudos e Projectos Ambientais, Lda
(Environmental Impact, Studies and Projects, Ltd.)
57
PROJECT TO BUILD A PHOTOVOLTAIC POWER STATION
IN MOCUBA, ZAMBEZIA PROVINCE
N⁰ do
AF
Nome do CF
Machamba (Codigo)
Sub-Total
14
FRANCISCO ERNESTO
Sub-Total
16
RAQUETA NIHALELANE
17
FRANCISCO VURUCA
18
ROSA ARAUJO
19
OFELIA ORLANDO
20
MARIA JOAO
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
21
VALENTE MUSSIQUELOTA
22
XADREQUE ERNESTO
23
Sub-Total
Sub-Total
ADELINA PEQUENINO
Sub-Total
24
LUCIA MUALETE
25
CARLITOS MONIZ
26
27
AVELINO JOAQUIM
Sub-Total
Sub-Total
Sub-Total
AUGUSTO MUCUALE
Sub-Total
28
ADELINA MUNHOGA
Sub-Total
29
30
CLEMENTINA MANUELA
LUISA MANUELA
SIMPLIFIED COMPENSATION AND LAND USE PLAN (SCLUP)
Sub-Total
Sub-Total
Area da
nachamba
(ha)
Estado da
machamba
Culturas
Area
ocupada
1
0.84504
1
0.348976
Pousio
Nenhuma
0
2
0.214184
Cultivada
Mandioca
0.214184
2
0.56316
1
0.304997
1
0.304997
1
0.682461
1
0.682461
1
0.374309
1
0.374309
1
0.185404
1
0.185404
1
0.465503
1
0.465503
1
0.427214
1
0.427214
1
0.597688
1
0.597688
1
0.590403
Cultivada
Mandioca
2
N/A
Cultivada
Mandioca
2
0.590403
1
0.670244
1
0.670244
1
0.808841
1
0.808841
1
0.270991
1
0.270991
1
1.141156
1
1.141156
1
Preco unitario da
cultura (MZM)
0.84504
Milho
0.304997
55000
6000
Mandioca
Cultivada
Mandioca
0.682461
0.682461
0.374309
0.374309
Cultivada
Mandioca
0.185404
Nenhuma
55000
Mandioca
55000
Cultivada
Feijão boer
0.597688
10400
0.590403
Mandioca
Nenhuma
Cultivada
Mandioca
0
2
350
700
2
700
0
0
0
0
350
17150
2
6250
12500
51
29650
0
0
0
0
0
0
0
0
23497
6216
32472
0.670244
32472
55000
0.670244
Pousio
0
Estruturas de
apoio
Total
Valuation
47877
11780
11780
1830
1830
38235
38235
20587
20587
10197
10197
17150
12500
29650
23497
23497
6216
6216
32472
N/A
0.590403
Cultivada
0
49
6216
55000
0
Bananeira
23497
0.597688
1400
Mangueira
0
0.427214
4
10197
0.465503
0.427214
Valor total de
arvores de fruta
(MZM)
20587
10197
0.465503
Cultivada
Bananeira
20587
0.185404
Pousio
37535
37535
55000
Preco da
arvore de
fruta
1830
1830
55000
Nº de
arvores de
fruta
11780
11780
0.304997
Cultivada
Tipo de
arvore de
fruta
46477
0.214184
Cultivada
Valor total da
cultura (MZM)
36863
36863
32472
36863
36863
0.808841
0.808841
0.270991
0
55000
0.270991
1.141156
14905
14905
Cultivada
Feijão boer
0.955064
Cultivada
Feijão boer
10400
0.955064
10400
9933
2
0.290427
Cultivada
Mandioca
0.290427
55000
15973
2
1.245491
1
2.188207
Cultivada
Mandioca
55000
120351
1
2.188207
1
0.625103
Pousio
Nenhuma
1
0.625103
1.141156
2.188207
11868
0
13650
13650
5
350
1750
Mangueira
2
6250
12500
7
Cajueiro
1
14250
75
75
0
1
Mangueira
120351
1
75
6250
1
Mangueira
0
0
350
39
25906
0
39
Bananeira
11868
1.245491
2.188207
0
Bananeira
1
1
6250
6250
6250
6250
6250
0
28555
28555
13618
12500
26118
10008
15973
25981
126601
126601
6250
6250
Impacto, Estudos e Projectos Ambientais, Lda
(Environmental Impact, Studies and Projects, Ltd.)
58
PROJECT TO BUILD A PHOTOVOLTAIC POWER STATION
IN MOCUBA, ZAMBEZIA PROVINCE
N⁰ do
AF
Nome do CF
31
ALFREDO MATUA
32
PAULINA MADEIRA
PAULINA INTABELA
34
JOSE VIAGEM
35
FRANCISCA JOAO
36
Area da
nachamba
(ha)
Estado da
machamba
Culturas
Area
ocupada
1
0.449539
Pousio
Nenhuma
0
1
0.449539
1
1.056812
1
1.056812
1
1.17868
1
1.17868
1
1.044031
1
1.044031
1
2.180182
1
2.180182
1
0.48769
Machamba (Codigo)
Sub-Total
Sub-Total
33
SIMPLIFIED COMPENSATION AND LAND USE PLAN (SCLUP)
Sub-Total
Sub-Total
Sub-Total
INACIO NIVARA
Sub-Total
37
RAQUETA PAULO
Sub-Total
38
OLIMPIO MADHUI
39
LIDIA SOZINHO
40
Sub-Total
Sub-Total
GASPAR EUGENIO
Sub-Total
41
ADELINA SANTOS
Sub-Total
42
43
AMELIA SANTOS
LAURINDA ANTONIO
44
BASILIO CLAUDIO
45
PEDRO ARMANDO
46
OSVALDO ALBERTO
47
LIMITADA MANGACAO
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
0
Pousio
Nenhuma
Pousio
Nenhuma
0.562577
1
0.562577
1
0.34545
1
0.34545
1
0.613326
1
0.613326
1
0.309277
1
0.309277
1
1.03385
1
1.03385
1
0.610523
1
0.610523
1
0.377153
1
0.377153
1
0.727626
1
0.727626
1
0.785145
1
0.785145
1
0.433156
1
0.433156
1
0.854592
0
Mandioca
1.044031
Mandioca
2.180182
Mandioca
Feijão-nhemba
0.48769
55000
Mandioca
0.562577
55000
Nenhuma
55000
Feijão-boer
Cultivada
Feijão-boer
0.309277
55000
Nenhuma
Mandioca
Cultivada
Feijão-boer
Pousio
Nenhuma
55000
17010
Mandioca
Nenhuma
5
1
25075
6250
6250
1
6250
0
0
0
0
0
0
Total
Valuation
6250
6250
25000
75
25075
6250
6250
57422
57422
119910
119910
26823
Bananeira
Papaeira
15
350
1
600
16
1
1
600
5850
350
1
Mangueira
5250
350
350
6250
1
6250
6250
26823
36192
600
36792
350
350
12629
12629
17010
10400
17010
0
Bananeira
Mangueira
0
55000
350
1
6250
4200
6250
13
10450
0
0
3922
0
0
0
0
0
0
0
0
0
33579
33579
10400
0
12
3922
17010
4200
6250
10450
33579
33579
3922
3922
0
0.785145
0.433156
0.433156
Pousio
75
6379
55000
0.785145
Cultivada
30942
6379
0
Mandioca
25000
75
26823
10400
0.377153
Cultivada
6250
1
Bananeira
0.610523
0.377153
4
Cajueiro
119910
0
0.610523
6250
Mangueira
0
0
Cultivada
1
30942
0.309277
Pousio
6250
26823
0.613326
Mandioca
6250
57422
0
0.613326
1
Estruturas de
apoio
9600
0
Cultivada
Mangueira
119910
0.562577
Pousio
Valor total de
arvores de fruta
(MZM)
57422
0.48769
Cultivada
Preco da
arvore de
fruta
0
2.180182
Cultivada
Nº de
arvores de
fruta
Mangueira
1.044031
Cultivada
Tipo de
arvore de
fruta
0
0
0
Cultivada
Valor total da
cultura (MZM)
0
0
0.48769
1
Preco unitario da
cultura (MZM)
0
43183
43183
55000
23824
23824
Bananeira
14
350
4900
0
43183
43183
23824
23824
4900
Impacto, Estudos e Projectos Ambientais, Lda
(Environmental Impact, Studies and Projects, Ltd.)
59
PROJECT TO BUILD A PHOTOVOLTAIC POWER STATION
IN MOCUBA, ZAMBEZIA PROVINCE
N⁰ do
AF
Nome do CF
Machamba (Codigo)
Sub-Total
48
SIMPLIFIED COMPENSATION AND LAND USE PLAN (SCLUP)
JAIME RIBEIRO
1
Area da
nachamba
(ha)
Estado da
machamba
Culturas
0.854592
1
0.82284
1
0.82284
1
0.746914
1
0.746914
1
0.484056
1
0.484056
1
0.364567
1
0.364567
Area
ocupada
Preco unitario da
cultura (MZM)
0
Cultivada
Milho
0.82284
Valor total da
cultura (MZM)
Tipo de
arvore de
fruta
Nº de
arvores de
fruta
Preco da
arvore de
fruta
Valor total de
arvores de fruta
(MZM)
Mangueira
4
6250
25000
Cajueiro
6
75
450
0
6000
4937
24
9
350
3150
Mangueira
2
6250
12500
Cajueiro
3
75
225
2
420
Laranjeira
Sub-Total
49
MARCELINO FRANCISCO
Sub-Total
50
51
RODRIGUES LAMPSON
FATIMA ALFREDO
Sub-Total
Sub-Total
0.82284
Pousio
Nenhuma
Pousio
Nenhuma
1
ARTUR FONSECA MANUEL
Sub-Total
53
54
ASISA AUGUSTA EMILIO
Sub-Total
LUISA FABIO RUAONE
Sub-Total
55
LAURA VALENTIM
Sub-Total
56
EUSEBIO DANIEL JOAO
Sub-Total
57
58
GUNLELA CAMPOS NICUE
Sub-Total
JULIETA NDUHA
Sub-Total
59
FRANCISCO NAHIVINERO
Sub-Total
1.681438
1
1.681438
1
0.366056
1
0.366056
1
0.646451
2
0.691131
2
1.337582
1
0.126267
1
0.126267
1
0.159336
1
0.159336
1
0.377223
1
0.377223
1
0.472679
1
0.472679
1
0.463674
1
0.463674
Cajueiro
Feijao-nhemba
0.364567
Tomate
Nenhuma
Cultivada
Nenhuma
Milho
Feijao-boer
Cultivada
Amendoim
Nenhuma
1.681438
0.691131
0.126267
0
22
350
7700
Mangueira
5
6250
31250
Cajueiro
2
75
150
29
39100
0
0
0
Mangueira
0
Mandioca
0.472679
Feijao-boer
3
6250
18750
6000
10400
7188
7188
6000
6400
3
Cajueiro
808
55000
1
18750
75
75
25000
808
0
Nenhuma
Nenhuma
0
Bananeira
92479
0
0
3500
3500
100179
31250
150
131579
1
75
Mangueira
4
6250
Cajueiro
4
75
300
0
18750
0
7188
25938
75
808
883
25000
300
25300
0
8
25300
0
0
0
0
25997
25997
0
0
25997
0
0
0
0
25997
10400
0.472679
Pousio
25000
450
30350
8087
12500
225
840
21652
62500
150
62650
0
0
Cultivada
0
?
0
Pousio
150
0
3500
0.126267
Pousio
75
0
92479
0.691131
Milho
2
62500
62650
55000
0
Pousio
6250
12
3500
1.681438
Pousio
10
0
9600
0.364567
Cultivada
840
16715
Total
Valuation
0
0
Cultivada
16
Mangueira
0
Mandioca
52
4937
0
30350
Bananeira
Estruturas de
apoio
0
0
Impacto, Estudos e Projectos Ambientais, Lda
(Environmental Impact, Studies and Projects, Ltd.)
60
PROJECT TO BUILD A PHOTOVOLTAIC POWER STATION
IN MOCUBA, ZAMBEZIA PROVINCE
N⁰ do
AF
60
Nome do CF
ALBERTO JOSE NIBODO
62
GELITO ANTONIO
Sub-Total
LUIS ALFANDEGA
Sub-Total
63
SEBASTIAO MIUME
64
FERNANDO SOZINHO
65
FERNANDO LAMPIAO
Area da
nachamba
(ha)
Estado da
machamba
Culturas
Area
ocupada
1
0.239032
Pousio
Nenhuma
0
1
0.239032
0
0
1
0.543798
Cultivada
Feijao-boer
0.543798
0
1
0.543798
Machamba (Codigo)
Sub-Total
61
SIMPLIFIED COMPENSATION AND LAND USE PLAN (SCLUP)
Sub-Total
Sub-Total
Sub-Total
1
1.334987
1
1.334987
1
0.161622
1
0.161622
1
0.453633
1
0.453633
1
0.266806
1
0.266806
0.543798
Cultivada
Mandioca
1.334987
Feijao-boer
Feijao-boer
0.161622
Feijao-boer
0.453633
Nenhuma
1
SIMALGE JOAO
JOSE MADEIRA
68
ACIDE PEDRO LONDINHO
Sub-Total
Sub-Total
Mapira
0.321329
0.321329
0.426757
1
0.426757
1
0.569357
Cultivada
Arroz
0.569357
2
0.313482
Pousio
Nenhuma
0
2
0.882839
69
LUDES UASSANANIA
Feijão-boer
70
ANTONIO GUNZANHANE
71
CATARINA M CARASASSE
Sub-Total
Sub-Total
72
73
ZECA P. MAZAMELA
Sub-Total
GLORIA ALFREDO
Sub-Total
1
0.237761
1
0.38682
1
0.38682
1
0.34944
1
0.34944
1
0.444531
1
0.444531
1
0.482455
1
0.482455
21000
8000
Nenhuma
0.237761
55000
Mandioca
0.34944
55000
Mandioca
6325
350
4
1400
1400
Bananeira
3
350
1050
Mangueira
1
6250
6250
4
7300
0
0
0
0
1681
4718
4
6250
4
25000
25000
6748
6748
6748
0
0
6748
0
0
0
0
4630
4555
Cajueiro
1
75
75
1
75
Poço
4630
13077
13077
13077
0
0
13077
0
0
0
0
24469
12500
36969
19219
10400
Bananeira
15
350
5250
Mangueira
2
6250
12500
19219
17
0
0
17750
0
0
Cultivada
4
0
Feijao-boer
Nenhuma
2
Bananeira
6250
75
6325
1400
1400
74474
6250
80724
1681
1681
4718
4718
25000
25000
9600
0.34944
Pousio
75
10400
0
Cultivada
75
4555
0.237761
Pousio
1
6000
Feijão-nhemba
Sub-Total
Cajueiro
Mangueira
0.569357
Mandioca
6250
0
0
Cultivada
6250
Total
Valuation
0
Milho
0.237761
1
4718
0.321329
Nenhuma
Mangueira
Estruturas de
apoio
10400
1
Pousio
Valor total de
arvores de fruta
(MZM)
6000
1
1
10400
0
Cultivada
73424
0
Feijão-boer
Sub-Total
67
0.321329
Preco da
arvore de
fruta
1681
0.453633
Pousio
Nº de
arvores de
fruta
73424
10400
0.161622
Cultivada
Tipo de
arvore de
fruta
0
55000
1.334987
Cultivada
Valor total da
cultura (MZM)
10400
Milho
66
Preco unitario da
cultura (MZM)
0.482455
0.482455
55000
26535
26535
0
0
Bananeira
17
350
5950
Mangueira
1
6250
6250
18
12200
0
32485
6250
38735
Impacto, Estudos e Projectos Ambientais, Lda
(Environmental Impact, Studies and Projects, Ltd.)
61
PROJECT TO BUILD A PHOTOVOLTAIC POWER STATION
IN MOCUBA, ZAMBEZIA PROVINCE
N⁰ do
AF
74
Nome do CF
Area da
nachamba
(ha)
Estado da
machamba
1
0.691855
Cultivada
1
0.691855
Machamba (Codigo)
JUBAR S. BARROSO
Sub-Total
75
SIMPLIFIED COMPENSATION AND LAND USE PLAN (SCLUP)
FANITO H. OLIVEIRA
Sub-Total
1
0.507788
1
0.507788
Culturas
Mandioca
Feijao-boer
Area
ocupada
0.691855
1
FERNANDO WARANIGANE
Cultivada
Batata-doce
0.507788
MARGARIDA VICENTE
Sub-Total
78
DAUNISA T MACONDE
79
CLARA FRANCISCO
80
MANUEL DOS SANTOS
81
JOANA B CIPRIANO
82
ARGELIO MARIO
Sub-Total
Sub-Total
Sub-Total
Sub-Total
AGOSTINHO LUIS
0.601012
1
0.543637
1
0.543637
1
0.73448
1
0.73448
1
0.306238
1
0.306238
1
0.313656
1
0.313656
1
0.368593
1
0.368593
1
0.273024
Sub-Total
1
0.273024
1
0.618605
1
0.618605
Cultivada
Feijão-nhemba
0.601012
84
Cultivada
Milho
Feijao-boer
Mandioca
Nenhuma
Pousio
Nenhuma
0.543637
Mandioca
0.73448
Nenhuma
86
SALVADOR FRANCISCO
Amendoim
Feijao-boer
Sub-Total
N/A
2
0.515852
1
0.554845
1
0.554845
1
0.636048
ARMANDO ATRETO
Cultivada
Mandioca
Feijão-boer
Mandioca
Cultivada
Mandioca
1
0.636048
6250
6250
18750
3
7300
Estruturas de
apoio
Total
Valuation
39102
6250
45352
46678
3
18750
46678
33056
0
0
33056
6250
5804
12054
46646
46646
75
75
1
6250
Cajueiro
2
75
40396
150
3
Mangueira
40396
1
6400
6250
1
Cajueiro
1
6250
6250
6250
75
75
0
1
75
0
0
0
0
0
0
0.368593
0.273024
55000
6250
20273
20273
55000
0
20273
20273
21266
15016
Mangueira
1
6250
6400
15016
1
6250
21266
0
0
0
0
28372
0
0
6250
28372
30516
30516
41233
6250
41233
0
55000
0.515852
28372
6400
10400
9600
N/A
0.554845
28372
55000
0.554845
0.636048
Feijão-boer
Sub-Total
55000
0.515852
Cultivada
1050
6250
Mangueira
5654
0
Cultivada
5654
0
Feijão-nhemba
2
10400
0.273024
Pousio
350
1
33056
6000
0.368593
Cultivada
3
4
Mangueira
33056
0
Mandioca
Valor total de
arvores de fruta
(MZM)
9600
0
Cultivada
Bananeira
Mangueira
27928
0.73448
Pousio
27928
Preco da
arvore de
fruta
40000
0.543637
Cultivada
Nº de
arvores de
fruta
38052
55000
0.601012
BERNARDO MOLE
Sub-Total
85
0.515852
10400
Tipo de
arvore de
fruta
40000
Mandioca
1
38052
55000
Amendoim
Sub-Total
83
1
55000
0.507788
Batata-doce
Sub-Total
77
0.601012
Valor total da
cultura (MZM)
0.691855
Mandioca
Mandioca
76
Preco unitario da
cultura (MZM)
30516
30516
55000
34983
0
Mangueira
1
0
6250
10400
0.636048
34983
1
Impacto, Estudos e Projectos Ambientais, Lda
(Environmental Impact, Studies and Projects, Ltd.)
62
PROJECT TO BUILD A PHOTOVOLTAIC POWER STATION
IN MOCUBA, ZAMBEZIA PROVINCE
N⁰ do
AF
Nome do CF
87
FELICIANO BERNARDO
88
SIMPLIFIED COMPENSATION AND LAND USE PLAN (SCLUP)
Area da
nachamba
(ha)
Estado da
machamba
Culturas
Area
ocupada
Preco unitario da
cultura (MZM)
Valor total da
cultura (MZM)
Tipo de
arvore de
fruta
Nº de
arvores de
fruta
Preco da
arvore de
fruta
Valor total de
arvores de fruta
(MZM)
1
0.471441
Cultivada
Feijao-boer
0.471441
10400
4903
Mangueira
1
6250
6250
1
0.471441
Machamba (Codigo)
Sub-Total
1
SALVADOR MOREIRA
0.945975
0.471441
Cultivada
Mandioca
55000
Feijão-boer
10400
Amendoim
0.945975
Feijão-nhemba
Sub-Total
89
0.945975
1
1.873213
Nenhuma
JULIO ANGELO
Sub-Total
1
1.873213
1
0.506196
1
0.506196
1
0.595058
Cultivada
2
0.968125
Cultivada
2
1.563183
1
0.388088
1
0.388088
1
0.292912
1
0.292912
1
0.272343
Nenhuma
GERONIMO ANTONIO
ROSITA SUATERA
Sub-Total
93
94
95
MADALENA SULYAI
Sub-Total
SANTOS MUSENO
ANGELA ALFREDO
96
MABNUEL CARLITOS
97
FAZBEM FRANCISCO
Sub-Total
Sub-Total
Sub-Total
2
0.549663
2
0.822006
1
0.437089
1
0.437089
1
0.143204
1
0.143204
1
0.479321
1
0.479321
1
JAMILO MWEPETA
Mandioca
6400
Cajueiro
3
75
225
9600
Goiabeira
2
1500
3000
21345
Mandioca
Feijão-boer
Feijao-boer
Cultivada
Feijao-boer
Mandioca
Amendoim
ROFINO EUGENIO
0.883885
1
1
Feijao-boer
Cultivada
Mandioca
55000
0.388088
55000
Feijao-boer
Feijão-nhemba
0.292912
10400
Mandioca
Feijão-boer
1
43975
75
75
1
75
32728
32728
0.272343
0.549663
53247
21345
0
Goiabeira
1
0
1500
1500
53247
85975
22845
1
1500
0
0
22845
3046
3046
2832
30231
33064
0
0
33064
0
0
0
0
0
0
7876
7876
5060
5060
50014
3046
3046
10400
2832
55000
30231
6400
0.437089
0.143204
55000
0.479321
10400
4985
Cajueiro
4985
55000
0.883885
7876
7876
48614
1
75
75
1
Bananeira
4
75
350
1400
9600
?
0.883885
Cultivada
10
21345
0.479321
Cultivada
225
10400
0.143204
Cultivada
43750
75
85975
0.437089
0.883885
0.139157
55000
0.822006
Cultivada
6250
3
0
0.292912
Cultivada
7
Cajueiro
Cajueiro
0.388088
Cultivada
37625
Mangueira
0
1.563183
Cultivada
19
11153
11153
24495
31250
225
3000
58970
43750
225
43975
75
75
10400
0.968125
Abóbora
Sub-Total
99
31250
Total
Valuation
6000
0.595058
Mandioca
98
3150
6250
0
Feijão-boer
Sub-Total
92
350
5
0
Milho
91
9
0
Mandioca
6250
Bananeira
0
Pousio
1
Mangueira
0.945975
Pousio
21345
ALMEIDA GRAVATA
Sub-Total
90
1
4903
Estruturas de
apoio
0.139157
48614
55000
7654
4
1400
50014
7654
10400
Impacto, Estudos e Projectos Ambientais, Lda
(Environmental Impact, Studies and Projects, Ltd.)
63
PROJECT TO BUILD A PHOTOVOLTAIC POWER STATION
IN MOCUBA, ZAMBEZIA PROVINCE
N⁰ do
AF
Nome do CF
SIMPLIFIED COMPENSATION AND LAND USE PLAN (SCLUP)
Machamba (Codigo)
Area da
nachamba
(ha)
Estado da
machamba
Culturas
Area
ocupada
Feijão-nhemba
Sub-Total
1
0.139157
1
0.136984
0.139157
2
Sub-Total
PACHICHE CASTIANO
102
DOMINGOS ARNAUA
Sub-Total
Sub-Total
103
Feijao-nhemba
2
0.217828
1
0.318937
1
0.318937
1
0.13269
1
0.13269
1
AUGUSTO BRANQUINHO
0.080844
0.853089
Cultivada
Mandioca
Feijão-boer
Mandioca
Mandioca
Feijão-boer
0.080844
0.318937
0.13269
1
104
ANTONIO JOSE MARECO
0.87128
0.853089
Mandioca
Amendoim
1
0.87128
1
2.512479
105
IZALGINA MARIO
0.87128
1
2.512479
1
0.386115
106
107
AUGUSTO SETEMANE
MANUEL PEDRO
108
ALICE CEBOLA
109
JOAO CINQUENTA
110
Sub-Total
1
0.386115
1
0.268041
Sub-Total
1
0.268041
1
0.478125
Sub-Total
1
0.478125
Sub-Total
1
0.503113
1
0.503113
1
0.0769
JOSE MACONTARA
Sub-Total
1
0.0769
Nenhuma
Pousio
Nenhuma
Cultivada
Feijão-boer
55000
55000
2.512479
Feijao Boer
0
0
0
0
Coqueiro
2
Bananeiras
14
1000
2000
2
2000
350
4900
47920
138186
10400
24481
17542
17542
7298
7298
48920
48920
4900
47920
14
4900
Mangueira
4
6250
25000
Cajueiro
1
75
75
52820
163186
75
9600
138186
0.386115
5
Mangueira
1
25075
6250
6250
0
1
6250
0
0
0
0
0
163261
6250
6250
0.268041
0.478125
10400
0.503113
0.0769
0.0769
4973
4973
55000
0.503113
Mandioca
46920
47920
0.478125
Cultivada
12500
6400
0.268041
Mandioca
2
7298
46920
0.386115
Cultivada
4446
10400
2.512479
Pousio
12500
7654
20034
40000
Feijão-nhemba
Sub-Total
6250
17542
6000
Mandioca
Feijão-boer
2
0
4446
7298
0.87128
Cultivada
Total
Valuation
10400
0.853089
Cultivada
Estruturas de
apoio
9600
Batata-doce
Sub-Total
55000
6400
Milho
1
Mangueira
17542
55000
0.853089
7534
0
11981
55000
Mandioca
Feijao-boer
Valor total de
arvores de fruta
(MZM)
10400
Amendoim
Feijao-nhemba
Sub-Total
55000
0.13269
Cultivada
Preco da
arvore de
fruta
40000
0.318937
Cultivada
Nº de
arvores de
fruta
9600
0.217828
Cultivada
Tipo de
arvore de
fruta
7654
55000
0.136984
Batata-doce
AFONSO EUGENIO
101
Cultivada
Valor total da
cultura (MZM)
9600
Mandioca
100
Preco unitario da
cultura (MZM)
27671
27671
55000
Bananeiras
112
350
39200
112
39200
0
0
4230
0
4973
4973
66871
66871
4230
10400
4230
4230
Impacto, Estudos e Projectos Ambientais, Lda
(Environmental Impact, Studies and Projects, Ltd.)
64
PROJECT TO BUILD A PHOTOVOLTAIC POWER STATION
IN MOCUBA, ZAMBEZIA PROVINCE
N⁰ do
AF
Nome do CF
111
AUGUSTO DA CONC
112
LIDIA REMIGIO
REMIGIO RONDA
114
HERMINIO PEQUENINO
Area da
nachamba
(ha)
Estado da
machamba
Culturas
Area
ocupada
1
0.567657
Pousio
Nenhuma
0.567657
1
0.567657
1
1.047203
1
1.047203
1
0.908438
1
0.908438
1
0.734332
1
0.734332
Machamba (Codigo)
Sub-Total
Sub-Total
113
SIMPLIFIED COMPENSATION AND LAND USE PLAN (SCLUP)
Sub-Total
Sub-Total
0.567657
Cultivada
Arroz
Cultivada
Amendoim
1.047203
0.908438
JOSE FELIZARDO
1
0.544752
Nenhuma
1
0.544752
1
0.434259
1
0.434259
1
1.815729
1
1.815729
Feijão-nhemba
Arroz
116
117
118
NOEL SAMUEL
LUCIANO NAUHO
Sub-Total
Sub-Total
1
ABILIO JANEIRO
Sub-Total
119
DALILA DA GRACA
Sub-Total
120
121
HORTENCIA ALFREDO
Sub-Total
Sub-Total
122
GRACINDA ALBERTO
Sub-Total
Pousio
Nenhuma
Cultivada
Feijao-boer
1
0.452672
1
0.452672
1
0.303736
1
0.303736
0.55325
Cultivada
Batata-doce
Mandioca
Cultivada
Amendoim
BENJAMIM MATECO
Sub-Total
124
CARLITOS PEQUENINO
350
7000
1
6250
6250
21
30
13250
350
30
1
10500
10500
350
350
29961
0
0
29961
0
0
0
0
0
0
266822
29961
4.848581
0
55000
0.452672
0.303736
0.55325
266672
266672
55000
75
150
2
150
266822
24897
0
24897
20905
20905
12500
3541
16041
60422
5768
350
66540
106642
37500
750
144892
1400
40000
24897
55000
16705
0
Bananeira
16705
6000
6400
3541
0.984946
0.55325
55000
54172
2
0.102151
Cultivada
Mandioca
0.102151
55000
5618
2
1.087097
3541
1
1.824404
1
1.824404
1
0.677078
1.087097
100342
10400
1.824404
350
4200
6250
12500
4200
2
1
Cajueiro
Papaeira
12500
6250
6250
2
75
150
1
350
350
4
6750
Bananeira
18
350
6300
Mangueira
6
6250
37500
Cajueiro
10
75
100342
6000
2
Mangueira
59790
55000
12
12
Mangueira
Mandioca
0.677078
2
24897
Cultivada
1.824404
0
Cajueiro
10400
0.55325
Milho
20
350
0.984946
Cultivada
Bananeira
Mangueira
Bananeira
6250
6250
15378
6250
21628
16314
16314
350
350
29961
6250
1
1
Feijao Boer
1
1.815729
Mandioca
123
5814
1
Cultivada
6250
0.434259
0.303736
Milho
6250
40000
0.452672
Cultivada
1
Total
Valuation
8000
4.848581
Mandioca
Mangueira
Estruturas de
apoio
9600
1.815729
Mandioca
Valor total de
arvores de fruta
(MZM)
Papaeira
0.434259
4.848581
1
DANIEL ANIBAL
4.848581
Nenhuma
Preco da
arvore de
fruta
0
0.544752
Pousio
Nº de
arvores de
fruta
5814
55000
0.544752
Tipo de
arvore de
fruta
8378
6400
0.734332
Cultivada
8378
0.734332
Batata-doce
Sub-Total
8000
0.908438
Pousio
Valor total da
cultura (MZM)
0
1.047203
Mandioca
115
Preco unitario da
cultura (MZM)
750
34
Bananeira
4
44550
350
1400
Alpendre
Impacto, Estudos e Projectos Ambientais, Lda
(Environmental Impact, Studies and Projects, Ltd.)
65
PROJECT TO BUILD A PHOTOVOLTAIC POWER STATION
IN MOCUBA, ZAMBEZIA PROVINCE
N⁰ do
AF
Nome do CF
SIMPLIFIED COMPENSATION AND LAND USE PLAN (SCLUP)
Machamba (Codigo)
Area da
nachamba
(ha)
Estado da
machamba
Preco unitario da
cultura (MZM)
Valor total da
cultura (MZM)
Mandioca
55000
37239
Feijão-boer
10400
Culturas
Area
ocupada
Batata-doce
Sub-Total
125
ARCANJO JOSE NICOLAO
Sub-Total
126
ANGELO AMARO
1
0.677078
1
0.441003
1
0.441003
1
0.60336
1
0.60336
1
0.365644
1
0.365644
Amendoim
Feijão-boer
0.441003
6000
55000
0.60336
127
DANIEL PEDRO
Sub-Total
Nenhuma
ISAC JOAQUIM
1
0.21807
1
0.21807
1
0.234072
1
0.234072
Mandioca
Feijão-boer
129
LUCAS TOMAS
Sub-Total
Nenhuma
130
0.21807
LUIS ROFINO
132
EUSEBIO NAVELA
Sub-Total
ABEL ANTONIO
Sub-Total
133
ALVARO JOAO
Sub-Total
134
AGOSTINHO PAULINO
2
0.146078
2
0.666589
1
0.594291
1
0.594291
1
0.307381
1
0.307381
1
0.268636
1
0.268636
1
0.840232
55000
Feijão-boer
Cultivada
Mandioca
Feijão-boer
Nenhuma
Cultivada
Feijao Boer
Mandioca
0.520511
Feijao Boer
1
6250
6250
1
6250
6250
6250
6250
11994
28628
10400
39435
6250
6250
6250
11994
1
6250
18244
0
0
0
28703
3000
Cajueiro
1
75
75
Goiabeira
2
1500
3000
9600
0.146078
55000
8034
8034
10400
36662
3
3075
39737
0
0
23156
0.594291
0.307381
0
55000
0.268636
0.840232
16906
0
Mangueira
1
6250
6250
1
6250
6250
30
6250
187500
4
75
10400
16906
55000
0.268636
Cultivada
Mangueira
0
55000
0.307381
Cultivada
6250
0.234072
0.594291
Mandioca
6250
1
11994
0.666589
Pousio
1
4586
4586
6250
33185
10400
0.234072
Cultivada
0
38639
40000
Feijão-nhemba
Sub-Total
131
0.520511
Mangueira
6000
Mandioca
1
0
1
0
0.21807
Pousio
Mangueira
0.365644
Batata-doce
Sub-Total
1400
33185
33185
0.365644
Cultivada
Total
Valuation
10400
Milho
128
Estruturas de
apoio
6400
0.60336
Pousio
4
4586
4586
Milho
Feijão-boer
Sub-Total
Valor total de
arvores de fruta
(MZM)
6400
10400
Mandioca
Amendoim
Preco da
arvore de
fruta
37239
37239
0.441003
Cultivada
Nº de
arvores de
fruta
40000
0.677078
Cultivada
Tipo de
arvore de
fruta
14775
Mangueira
Cajueiro
14775
10400
8738
300
34
187800
Mangueira
1
6250
6250
Cajueiro
1
75
75
Goiabeira
4
1500
6000
23156
202275
300
202575
14988
75
6000
Impacto, Estudos e Projectos Ambientais, Lda
(Environmental Impact, Studies and Projects, Ltd.)
66
PROJECT TO BUILD A PHOTOVOLTAIC POWER STATION
IN MOCUBA, ZAMBEZIA PROVINCE
N⁰ do
AF
Nome do CF
Machamba (Codigo)
Sub-Total
135
JAIME ANTONIO
Sub-Total
136
Sub-Total
MATIAS MACAVANE
138
ANTONIO AMELA
139
Sub-Total
Sub-Total
JULIETA PEDRO
Sub-Total
140
141
LUISA ETAGA
Sub-Total
CACILIA DA SILVA
1
0.689285
1.931532
1
1.931532
1
0.332737
1
0.332737
1
0.430066
1
0.430066
1
0.217576
1
0.217576
1
0.320577
1
0.320577
1
Estado da
machamba
Culturas
0.840232
0.689285
1
MANUEL CALADO
Area da
nachamba
(ha)
1
1
Sub-Total
142
1
1
BERNARDO PEDRO
137
SIMPLIFIED COMPENSATION AND LAND USE PLAN (SCLUP)
0.519653
Cultivada
Mandioca
Feijao-Nhemba
0.689285
Cultivada
Mandioca
Feijão-boer
10400
Feijão Nhemba
9600
Mandioca
0.332737
Feijão-boer
Nenhuma
Nenhuma
0.217576
6000
Mandioca
55000
0.519653
143
ANGELINA SOZINHO
Sub-Total
0.14479
1
2.128165
Gergelim
?
10400
6000
Mandioca
55000
1
2.128165
Nenhuma
0.14479
1
ERMELINDO ANTONIO
0.901357
Amendoim
Feijão-boer
1
0.901357
6250
Cajueiro
1
75
75
2
6325
0
0
1
6250
1
6250
6250
Mangueira
2
6250
12500
Laranjeira
1
420
420
0
3
12920
0
0
0
112559
18301
18301
6250
6250
12500
420
12920
28581
Bananeira
9
350
3150
Mangueira
4
6250
25000
0
3150
53581
28150
56731
13
7963
7963
9600
7963
2.128165
0
Mangueira
0
1
1
0
6250
6250
6250
7963
6250
6250
6000
0.901357
Feijão-nhemba
Sub-Total
6250
6400
2.128165
Cultivada
1
15063
44161
75
44236
6250
106309
10400
Milho
144
75
6325
Mangueira
28581
Milho
0.14479
Pousio
75
2
Total
Valuation
6400
Feijão-boer
Amendoim
1
6250
Estruturas de
apoio
0.320577
0.519653
Cultivada
Cajueiro
Mangueira
Milho
Amendoim
6250
0
0.320577
Cultivada
1
18301
0.430066
0.217576
Pousio
Valor total de
arvores de fruta
(MZM)
6325
Mangueira
18301
0.430066
Pousio
Preco da
arvore de
fruta
6
106234
55000
0.332737
Cultivada
106234
Nº de
arvores de
fruta
6400
1.931532
Cultivada
Tipo de
arvore de
fruta
37911
6000
1.931532
37911
9600
55000
Feijão-nhemba
1
55000
Milho
Amendoim
Valor total da
cultura (MZM)
8738
0.689285
Feijão-boer
Sub-Total
Preco unitario da
cultura (MZM)
0.840232
0.519653
0.14479
Area
ocupada
6400
10400
9374
9374
9600
0.901357
9374
0
0
9374
Impacto, Estudos e Projectos Ambientais, Lda
(Environmental Impact, Studies and Projects, Ltd.)
67
PROJECT TO BUILD A PHOTOVOLTAIC POWER STATION
IN MOCUBA, ZAMBEZIA PROVINCE
N⁰ do
AF
Nome do CF
145
ELIUAS ANGELO
146
SIMPLIFIED COMPENSATION AND LAND USE PLAN (SCLUP)
Area da
nachamba
(ha)
Estado da
machamba
Culturas
Area
ocupada
1
0.206013
Pousio
Nenhuma
0.206013
1
0.206013
Machamba (Codigo)
Sub-Total
1
LUIS MESA
Sub-Total
1
0.166732
0.206013
Cultivada
Milho
6000
55000
Amendoim
0.166732
10400
Feijão-nhemba
9600
0.166732
147
MOISES VICTOR
Cultivada
Amendoim
148
FERNANDO JOAO
149
FERNANDO SOZINHO
150
BONEFACIO MUATEPULA
151
152
JULIANO ANTONIO
VIDAL IMPUANO
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
0.598011
1
0.226295
1
0.226295
1
0.216448
1
0.216448
1
0.172765
1
0.172765
1
0.515041
1
0.515041
1
0.717702
1
0.717702
1
0.083126
1
0.083126
Nenhuma
Nenhuma
Nenhuma
Pousio
Nenhuma
Pousio
Nenhuma
153
JEMUSSE AGUACEIRO
SANTO ELIAS
Sub-Total
155
JOAOZINHO RICARDO
156
MADALENA TELEGRAMA
157
ALEXANDRE MANGACAO
Sub-Total
Sub-Total
1
0.645902
1
0.645902
1
0.580394
1
0.580394
1
0.116458
1
0.116458
1
0.651333
Cultivada
Feijão Nhemba
32
48000
Bananeira
3
350
1050
Mangueira
1
6250
6250
Bananeira
12
4
7300
350
48000
48000
1050
15420
4200
16470
4200
32891
0.172765
0
15
93750
0
0
0
0
0
0
0
0
0
0
798
0
0
75
798
35600
Mangueira
0.216448
Bananeira
6250
21
15
12500
12500
350
21
Mangueira
9600
2
4200
2
0
0.172765
0.083126
12
0
7350
7350
6250
93750
798
?
?
0.083126
Mandioca
48000
32891
0.226295
Tomate
Sub-Total
154
Abóbora
1500
Total
Valuation
37091
12500
12500
7350
7350
93750
93750
Feijão Nhemba
Cultivada
32
32891
0.216448
Pousio
Goiabeira
Estruturas de
apoio
9600
0.226295
Pousio
Valor total de
arvores de fruta
(MZM)
6400
0.598011
Pousio
Preco da
arvore de
fruta
10400
Feijão-nhemba
1
Nº de
arvores de
fruta
9170
55000
0.598011
Feijão-boer
Sub-Total
9170
6000
Mandioca
0.598011
Tipo de
arvore de
fruta
6400
Feijão-boer
0.166732
Valor total da
cultura (MZM)
0
Mandioca
Milho
1
Preco unitario da
cultura (MZM)
0.645902
798
55000
35525
Cajueiro
1
75
9600
0.645902
35525
1
75
35600
0
0
0
0
0
0
1211
1211
36123
12500
Pousio
0
Cultivada
Feijão Boer
0.116458
10400
0.116458
Amendoim
Feijão Boer
1211
55000
Mandioca
Cultivada
0.651333
1211
6400
35823
Cajueiro
4
75
300
Mangueira
2
6250
12500
10400
Impacto, Estudos e Projectos Ambientais, Lda
(Environmental Impact, Studies and Projects, Ltd.)
68
PROJECT TO BUILD A PHOTOVOLTAIC POWER STATION
IN MOCUBA, ZAMBEZIA PROVINCE
N⁰ do
AF
Nome do CF
SIMPLIFIED COMPENSATION AND LAND USE PLAN (SCLUP)
Machamba (Codigo)
Sub-Total
1
Area da
nachamba
(ha)
Estado da
machamba
Culturas
0.651333
Area
ocupada
0.651333
Milho
158
OLIVEIRA JOSE
Sub-Total
1
0.433293
Cultivada
Feijão boer
159
ANGELO AMARO
0.666824
9600
0.433293
Cultivada
Feijão Boer
160
161
SALIMO NIVAVIVA
Sub-Total
0.666824
ADINANE LUCAS
Sub-Total
162
0.666824
1
0.710013
1
0.710013
1
0.800066
Pousio
Nenhuma
0
2
0
Pousio
Nenhuma
0
2
0.800066
1
DINIS GERENTE
0.430755
Cultivada
163
164
TARZAN MARIO
Sub-Total
RAZANO VICIAL
Sub-Total
165
166
ANTONIO JOSE
Sub-Total
CRISTIANO CASTIANO
Sub-Total
167
ELISEU NICOSSE
Sub-Total
10400
0.430755
1
0.350436
1
0.350436
0.430755
1
0.489444
1
0.489444
1
0.070118
1
0.070118
1
0.254077
Pousio
Nenhuma
2
0.325352
Cultivada
Amendoim
2
0.579429
1
0.941442
1
0.941442
Mandioca
Pousio
Pousio
DANIEL SANTOS
1
1.291575
Cultivada
0
4506
6935
6935
0
1
0
6250
6250
0
1
6250
0
0
0
23692
Bananeira
7
350
2450
6935
6250
6250
0
26142
?
0
0
2
6325
26142
19274
19274
75
6250
6325
0
0
0
0
0
0
0
0.350436
23692
55000
0.350436
Pousio
48623
9600
0.430755
Cultivada
0
Mangueira
55000
1
Total
Valuation
4506
6935
Mandioca
7
2450
0
0
19274
19274
Nenhuma
Cajueiro
1
75
75
Mangueira
1
6250
6250
Nenhuma
0.325352
6400
2082
0.325352
2082
0
0
Nenhuma
Mangueira
Milho
168
10400
0
Abóbora
Sub-Total
Estruturas de
apoio
6400
Feijão Boer
Feijão Nhemba
12800
4506
4506
0.666824
Nenhuma
6
Valor total de
arvores de fruta
(MZM)
9600
1
Pousio
Preco da
arvore de
fruta
6000
Feijão Nhemba
Sub-Total
10400
7200
Milho
1
Nº de
arvores de
fruta
6400
0.433293
Feijão jugo
Amendoim
Tipo de
arvore de
fruta
35823
Feijão nhemba
0.433293
Valor total da
cultura (MZM)
6000
Amendoim
1
Preco unitario da
cultura (MZM)
Mandioca
Amendoim
Feijão Nhemba
6000
1.291575
55000
71037
1
6250
1
6250
6250
Cajueiro
4
75
300
Mangueira
1
6250
6250
2082
2082
6250
6250
300
77287
6400
9600
Impacto, Estudos e Projectos Ambientais, Lda
(Environmental Impact, Studies and Projects, Ltd.)
69
PROJECT TO BUILD A PHOTOVOLTAIC POWER STATION
IN MOCUBA, ZAMBEZIA PROVINCE
N⁰ do
AF
Nome do CF
SIMPLIFIED COMPENSATION AND LAND USE PLAN (SCLUP)
Machamba (Codigo)
Sub-Total
1
Area da
nachamba
(ha)
Estado da
machamba
Culturas
1.291575
Area
ocupada
1.291575
Milho
169
JOANA ALBERTO AVFELI
Sub-Total
170
171
LUIS ROQUE
Sub-Total
1
1.408584
1
0.600928
1
0.600928
1
JORGE NAMACUSSA
1.408584
Cultivada
Amendoim
55000
1.408584
10400
Feijão jugo
9600
0.600928
1
172
OCTAVIO BASILIO
173
1
1
TERESA EUGENIO
174
175
ALFREDO A NIBODO
Sub-Total
Sub-Total
SIDALIA R TOMAS
177
FERNANDO EUGENIO
1
0.487572
1
0.487572
1
0.344916
2
ARTUR DINIS MULOIUA
176
0.294844
Sub-Total
Sub-Total
1
0.344916
1
0.754931
1
0.754931
350
71400
75
975
Mangueira
5
6250
31250
Amendoim
Feijão Boer
1.527184
10400
0.728742
Mandioca
1
0.548915
1
0.548915
103625
0.294844
0
0
7579
16216
16216
6400
10400
9600
0.487572
16216
55000
0
Bananeira
20
Mandioca
Cajueiro
10
75
750
Amendoim
Coqueiro
1
1000
1000
Laranjeira
4
420
1680
Limoeiro
3
120
360
Mangueira
15
6250
93750
Papaeira
1
600
600
0.344916
26816
0
1
Gergelim
83722
4807
4807
71400
975
47133
119508
7579
7579
7579
0.487572
Pousio
222
Mangueira
Feijão Boer
77587
6250
77472
7200
55000
Cultivada
Total
Valuation
6400
10400
Mandioca
Mandioca
15883
15883
6000
Amendoim
Estruturas de
apoio
6000
Milho
Cultivada
Pousio
0
13
0.294844
N/A
0
204
Feijão Nhemba
1
6250
Cajueiro
Feijão Boer
Sub-Total
1
4807
4807
0.728742
Cultivada
77472
Bananeira
0.728742
0.294844
6250
6400
Feijão jugo
Sub-Total
8000
1.527184
Cultivada
6250
6000
1.527184
0.728742
1
6550
Milho
Milho
1
Mangueira
Valor total de
arvores de fruta
(MZM)
Amendoim
Feijão Boer
Sub-Total
Preco da
arvore de
fruta
5
77472
0.600928
1.527184
Nº de
arvores de
fruta
6400
Feijão Boer
Arroz
Tipo de
arvore de
fruta
71037
1.408584
Cultivada
Valor total da
cultura (MZM)
6000
Mandioca
1
Preco unitario da
cultura (MZM)
26816
55000
18970
N/A
6250
1
6250
6250
350
7000
0.344916
18970
54
105140
0
0
0
0
0
0
16216
33066
33066
25970
750
1000
1680
360
93750
600
124110
Nenhuma
Nenhuma
Mangueira
1
1
6250
6250
6250
0
6250
6250
Impacto, Estudos e Projectos Ambientais, Lda
(Environmental Impact, Studies and Projects, Ltd.)
70
PROJECT TO BUILD A PHOTOVOLTAIC POWER STATION
IN MOCUBA, ZAMBEZIA PROVINCE
N⁰ do
AF
Nome do CF
178
AMERICO CUNHEVO
179
SILVERIO MAJAMANDO
180
LOURENCO MANUEL
181
EUSENIA ATIANA
182
183
ADELIA FABIAO
Area da
nachamba
(ha)
Estado da
machamba
Culturas
1
0.323943
Pousio
Nenhuma
1
0.323943
1
1.018691
1
1.018691
1
0.208332
1
0.208332
1
0.31451
Machamba (Codigo)
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
FELIZ ARTUR
Sub-Total
184
SIMPLIFIED COMPENSATION AND LAND USE PLAN (SCLUP)
Cultivada
Nenhuma
Mandioca
Pousio
Nenhuma
0.31451
0.129456
1
0.129456
1
0.107659
Cultivada
2
N/A
Cultivada
2
0.107659
0
0
0
0
Mandioca
0.208332
0.31451
Feijao Boer
185
1
1
ZEFERINO PORTUGUES
Sub-Total
1
3.96591
0
5921
0
0
5921
38189
0.107659
186
LYUCAS HERMINIO
Sub-Total
187
1
1
VALDIMIRO PEDRO
N/A
Sub-Total
1
0.979234
5921
0.353434
19439
6000
55000
3.96591
218125
6400
Feijão Boer
10400
Batata doce
40000
3
6250
55000
0.190762
18750
7200
40000
Bananeira
7
350
2450
Cajueiro
76
75
5700
Mangueira
4
6250
25000
87
Limoeiro
1
33150
120
120
10492
38189
2450
223825
25000
251275
120
10492
Cajueiro
1
75
75
Mangueira
2
6250
12500
10612
75
66358
12575
66433
10492
Milho
6000
Mandioca
55000
53858
1
120
6400
Feijão jugo
7200
Feijão Nhemba
9600
0.979234
18750
10400
Feijão jugo
0.979234
3
218125
6000
Batata doce
Amendoim
Mangueira
9600
0.190762
Cultivada
19439
10400
Milho
Feijão Boer
5921
9600
Mandioca
0.190762
0.979234
55000
3.96591
Cultivada
17298
0
Mandioca
0.190762
14000
0
Milho
1
14000
0
6400
3.96591
350
40
0
55000
Amendoim
40
150
0
150
150
14000
14000
17298
17298
0
0.353434
Cultivada
150
Total
Valuation
0
Mandioca
0.353434
75
Estruturas de
apoio
17298
Feijão Nhemba
Sub-Total
2
Valor total de
arvores de fruta
(MZM)
0
2
Bananeira
Amendoim
Feijão Boer
Preco da
arvore de
fruta
0
0
55000
Nº de
arvores de
fruta
0.31451
Feijão Nhemba
Amendoim
Tipo de
arvore de
fruta
Cajueiro
0.107659
Cultivada
Valor total da
cultura (MZM)
Nenhuma
Cultivada
1
0.353434
Preco unitario da
cultura (MZM)
0.208332
1
1
JAOQUINA ARMANDO
Pousio
Area
ocupada
53858
3
Impacto, Estudos e Projectos Ambientais, Lda
(Environmental Impact, Studies and Projects, Ltd.)
71
PROJECT TO BUILD A PHOTOVOLTAIC POWER STATION
IN MOCUBA, ZAMBEZIA PROVINCE
N⁰ do
AF
Nome do CF
SIMPLIFIED COMPENSATION AND LAND USE PLAN (SCLUP)
Machamba (Codigo)
1
Area da
nachamba
(ha)
2.848075
Estado da
machamba
Cultivada
Culturas
Area
ocupada
Feijão Boer
10400
Feijão Nhemba
9600
Batata doce
2.848075
Cana-de-açucar
188
LUIS JACINTO
2
Sub-Total
189
ANTUNES MUEVESSORO
190
PEDRO EUGENIO
191
Sub-Total
Sub-Total
MANUEL JULIO
1.542765
2
4.39084
1
0.639018
1
0.639018
1
0.149761
1
0.149761
1
0.388189
1
0.388189
1
0.577347
1
0.577347
Cultivada
Pousio
Pousio
Cultivada
192
ERNESTO MANGULETE
Sub-Total
193
ROSARIO MULAUA
Sub-Total
194
1
1
JOSE MUIRA
195
CARLOS MUANAVAVA
Sub-Total
196
LUISA CUNHETE
1
0.889255
1
0.649271
1
0.649271
1
2.356399
9100
113923
113923
6400
Mangueira
10
6250
62500
Feijão Boer
10400
Papaeira
2
600
1200
4425
88852
62500
1200
Feijão jugo
7200
Amendoim
1.542765
84852
4.39084
198775
101
81225
280000
0
0
0
0
0
0
0
0
0
0
Nenhuma
Nenhuma
Milho
6000
Mandioca
55000
Amendoim
0.388189
Tomate
Amendoim
21350
21350
6400
9600
0.577347
21350
0
0
21350
0
0
0
0
6250
16510
?
6000
55000
0.300177
Mangueira
1
6250
6250
16510
6400
Feijão Boer
10400
Feijão Nhemba
9600
16510
6250
Mandioca
55000
Bananeira
57
350
19950
9600
Cajueiro
1
75
75
40000
Mangueira
1
6250
6250
Batata doce
0.889255
Milho
Amendoim
Nenhuma
48909
1
Feijão Nhemba
22760
68859
75
6250
8000
0.649271
0.649271
Pousio
9100
4000
0.889255
Cultivada
350
4425
Arroz
Sub-Total
26
Total
Valuation
75
0.300177
Cultivada
Bananeira
Estruturas de
apoio
1000
0.300177
0.889255
Valor total de
arvores de fruta
(MZM)
4
0.577347
Cultivada
Preco da
arvore de
fruta
59
Mandioca
0.300177
Nº de
arvores de
fruta
Cajueiro
6000
55000
0.388189
Cultivada
Tipo de
arvore de
fruta
Coqueiro
Milho
Mandioca
Milho
1
40000
Valor total da
cultura (MZM)
?
Feijão Nhemba
Sub-Total
Preco unitario da
cultura (MZM)
2.356399
48909
6000
6400
59
26275
Bananeira
1
350
350
Bananeira
37
350
12950
Cajueiro
1
75
75
Mangueira
8
6250
50000
4155
4155
350
75184
350
4155
4505
12950
75
50000
Impacto, Estudos e Projectos Ambientais, Lda
(Environmental Impact, Studies and Projects, Ltd.)
72
PROJECT TO BUILD A PHOTOVOLTAIC POWER STATION
IN MOCUBA, ZAMBEZIA PROVINCE
N⁰ do
AF
Nome do CF
SIMPLIFIED COMPENSATION AND LAND USE PLAN (SCLUP)
Machamba (Codigo)
Sub-Total
1
Area da
nachamba
(ha)
Estado da
machamba
Culturas
2.356399
Area
ocupada
2.356399
Milho
197
AUGUSTO MUZENA
Sub-Total
198
MADALENA VICTOR
Sub-Total
1
0.235722
1
0.626149
1
0.626149
1
199
Sub-Total
MAZIDE ANTONIO
Sub-Total
2
0.517724
Amendoim
55000
0.117329
1
0.117329
0.445006
0.235722
Feijão Boer
10400
9600
Nenhuma
Cultivada
Milho
6000
Mandioca
55000
Amendoim
0.158318
Feijão Boer
10400
9600
Milho
6000
Mandioca
55000
0.517724
Feijão Boer
10400
9600
0.676042
Cultivada
Feijão Nhemba
Cultivada
Amendoim
0.117329
0.445006
Milho
EUGENIA MULALEIA
2
0.344574
2
0.78958
Cultivada
Amendoim
0.344574
FRANCISCO PEDRO
1
1.225296
1
1.225296
1
0.47822
Cultivada
Mapira
Amendoim
203
ALVES NATAMILO
2
0.095565
Cultivada
Milho
Feijão Boer
Milho
Cana-de-açucar
12965
0
0
0
8707
0
6250
8707
28475
28475
Mangueira
6250
6250
6453
1
Bananeira
1
6250
350
350
43432
6803
24475
Cajueiro
1
75
75
6803
24550
Mangueira
2
6250
12500
12500
12575
3584
40634
67466
1
350
6400
3584
28059
55000
1.225296
1
6400
67391
3
Cajueiro
1
75
75
21000
6400
10400
1.225296
Cultivada
0
6453
55000
10400
Feijão Boer
Sub-Total
0
9600
0.78958
Mandioca
202
63025
12965
6000
Feijão Boer
Sub-Total
Total
Valuation
12965
12965
37182
55000
0.117329
Mandioca
63025
Estruturas de
apoio
6400
Feijão Nhemba
Mandioca
46
Valor total de
arvores de fruta
(MZM)
6400
Feijão Nhemba
Amendoim
Preco da
arvore de
fruta
0.626149
0.626149
Cultivada
Nº de
arvores de
fruta
6400
0.235722
Cultivada
Tipo de
arvore de
fruta
0
Feijão Nhemba
0.676042
1
1
201
0.158318
Cultivada
ANTONIO LUIS
2
200
0.235722
Valor total da
cultura (MZM)
6000
Mandioca
1
Preco unitario da
cultura (MZM)
0.47822
0.095565
67391
6000
1
Mangueira
10400
4973
6000
573
1
75
6250
6250
67466
6250
4973
573
?
Impacto, Estudos e Projectos Ambientais, Lda
(Environmental Impact, Studies and Projects, Ltd.)
73
PROJECT TO BUILD A PHOTOVOLTAIC POWER STATION
IN MOCUBA, ZAMBEZIA PROVINCE
N⁰ do
AF
Nome do CF
Machamba (Codigo)
Sub-Total
204
205
JACINTA BERNARDO
Sub-Total
AGOSTINHO LUIS
Sub-Total
206
207
208
SANTOS NAUELA
ARLINDO COMPANHEIRO
SIMPLIFIED COMPENSATION AND LAND USE PLAN (SCLUP)
Sub-Total
Sub-Total
2
0.573785
1
0.368147
1
0.368147
1
0.227247
1
0.227247
1
0.103644
1
0.103644
1
0.200929
1
0.200929
1
CASSIMO ARLINDO
Area da
nachamba
(ha)
0.883459
Estado da
machamba
Culturas
Area
ocupada
209
MORAIS ALFREDO
Sub-Total
Valor total da
cultura (MZM)
Tipo de
arvore de
fruta
5547
Pousio
Nenhuma
0.368147
Cultivada
Mandioca
Amendoim
Nenhuma
Pousio
Nenhuma
0.227247
1
0.883459
1
1.089084
Cultivada
2
0.562916
Pousio
2
1.652
1
350
1
0
6000
0.883459
0
Bananeira
55000
Total
Valuation
6250
11797
0
350
0
12849
350
12849
10
0
350
10
Cajueiro
1
3500
3500
75
75
48590
6400
10400
0.883459
Nenhuma
0
Bananeira
0
0.200929
Milho
Feijão Boer
12499
12499
Mandioca
Amendoim
Estruturas de
apoio
0.103644
0.200929
Amendoim
Valor total de
arvores de fruta
(MZM)
6400
0.103644
Cultivada
Preco da
arvore de
fruta
1
0
55000
0.227247
Pousio
Nº de
arvores de
fruta
0.368147
Feijão Boer
Sub-Total
Preco unitario da
cultura (MZM)
1.089084
48590
1
75
Poço
0
3500
3500
75
48590
0
0
48665
6400
10400
11326
11326
0
1.089084
11326
0
0
11326
Pressupostos: em machambas com mais de uma cultura, uma vez que a pratica é em regime de conssociação de culturas, optou-se por utilizar a cultura de maior valor para calcular o valor a compensar.
Fonte: Tabela do Distrito de Mocuba
Valores que não constam na tabela
Machambas que precisam ser medidas novamente; informação que necessita ser confirmada no campo
Agregados familiares vulneráveis
Impacto, Estudos e Projectos Ambientais, Lda
(Environmental Impact, Studies and Projects, Ltd.)
74
PROJECT TO BUILD A PHOTOVOLTAIC POWER STATION
IN MOCUBA, ZAMBEZIA PROVINCE
Appendix 4
Vulnarability types per family
PROJECT TO BUILD A PHOTOVOLTAIC POWER STATION
IN MOCUBA, ZAMBEZIA PROVINCE
AFnº
/
Cartã
o nº
Nome do entrevistado
2
VISERNA SAVAIO
2
EZIO FELICIANO
3
JOAQUINA J MACUIA
3
ARLINDO LUIS
4
BELILA MEDIA
5
7
LUCIA INDIA
ISABEL
MUSSURMAQUE
8
VICTORINO SABONETE
8
ZENITO DOMINGO
10
11
AMELIA AGOSTINHO
MUNAVIANA CEMENTE
13
13
MAULIDA MATHESSO
VIVI RONDINHO
14
EDGAR FRANCISCO
16
16
RAQUETA NIHALELANE
GLORIA MONIZ
16
JOHN AFONSO
18
ROSA ARAUJO
19
OFELIA ORLANDO
20
20
MARIA JOAO
CRISTINA EDUARDO
Relação
com o
Chefe AF
Chefe do
af
Outra
Chefe do
af
Filho(a)
Esposa do
cf
Chefe do
af
Chefe do
af
Chefe do
af
Outra
Chefe do
af
Sogro(a)
Chefe do
af
Filho(a)
Filho(a)
Chefe do
af
Filho(a)
Outra
Chefe do
af
Chefe do
af
Chefe do
af
Filho(a)
Género
Idad
e
Tipo de vulnerabilidade
Feminino
Masculin
o
73 VIÚVA
Feminino
Masculin
o
50 MULHER CHEFE DE FAMíLIA
Feminino
40 PESSOA COM DOENçA
Feminino
53 VIÚVA
Feminino
Masculin
o
Masculin
o
40 VIÚVA
PESSOA IDOSA (ACIMA DE 60
62 ANOS)
Feminino
Feminino
33 MÃE SOLTEIRA
82 VIÚVA
Feminino
Feminino
Masculin
o
35 MÃE SOLTEIRA
5 PESSOA COM DOENçA
Feminino
Feminino
Masculin
o
70 MÃE SOLTEIRA
20 MÃE SOLTEIRA
Feminino
66 MÃE SOLTEIRA
Feminino
36 MÃE SOLTEIRA
Feminino
Feminino
47 MULHER CHEFE DE FAMíLIA
27 MÃE SOLTEIRA
22 HIV
20 DEFICIÊNCIA FíSICA
16 CRIANÇA ORFÃ
26 DEFICIÊNCIA FíSICA
9 DEFICIÊNCIA FíSICA
PROJECT TO BUILD A PHOTOVOLTAIC POWER STATION
IN MOCUBA, ZAMBEZIA PROVINCE
21
MUSSIQUETELA
ANGOLA
23
23
ADELINA PEQUENINO
MARTA LUCIANO
24
LUCIA MUALATE
25
CARLITOS MONIZ
27
AUGUSTO MUCUALE
28
30
30
30
31
31
ADELINA MUNHOGA
CLEMENTINA
MANUELA
LUISA MANUEL
RIBEIRO
NEIDE AMILCAR
AMANCIA JONE
NANCY VICTORINO
LURDINA VICTORINO
Pai/mÃe
Chefe do
af
Filho(a)
Chefe do
af
Chefe do
af
Chefe do
af
Chefe do
af
Chefe do
af
Chefe do
af
Filho(a)
Outra
Outra
Outra
31
IVANILDO NESTINHO
Outra
31
32
THINTCHIM NESTINHO
SARA FLAVIANO
Outra
Outra
32
AGNALDO FLAVIANO
Outra
32
32
PONCIANO FLAVIANO
EUFRASIA FLAVIANO
33
34
PAULINA INTABELA
LILIANA FRANCISCO
35
36
36
FRANCISCA JOAO
VANILDO ESTEVAO
FARIZANA EVARISTO
Outra
Outra
Chefe do
af
Outra
Chefe do
af
Outra
Outra
36
MICAS MANUEL
Outra
36
MAIDENE MANUEL
Outra
29
Masculin
o
PESSOA IDOSA (ACIMA DE 60
80 ANOS)
Feminino
Feminino
57 MÃE SOLTEIRA
20 DIFICIENCIA AUDITIVA
Feminino
Masculin
o
Masculin
o
59 VIÚVA
PESSOA IDOSA (ACIMA DE 60
62 ANOS)
Feminino
Masculin
o
60 DEFICIÊNCIA FíSICA
PESSOA IDOSA (ACIMA DE 60
75 ANOS)
77 VIÚVA
Feminino
Feminino
Feminino
Feminino
Feminino
Masculin
o
Masculin
o
Feminino
Masculin
o
Masculin
o
Feminino
50
18
3
10
9
MULHER CHEFE DE FAMíLIA
MÃE SOLTEIRA
NÃO SABE / NÃO RESPONDE
CRIANÇA ORFÃ
CRIANÇA ORFÃ
Feminino
Feminino
72 VIÚVA
14 PESSOA COM DOENçA
Feminino
Feminino
Feminino
Masculin
o
Masculin
o
75 VIÚVA
13 CRIANÇA ORFÃ
12 CRIANÇA ORFÃ
8 CRIANÇA ORFÃ
0 CRIANÇA ORFÃ
15 CRIANÇA ORFÃ
10 CRIANÇA ORFÃ
9 CRIANÇA ORFÃ
6 CRIANÇA ORFÃ
13 CRIANÇA ORFÃ
9 CRIANÇA ORFÃ
PROJECT TO BUILD A PHOTOVOLTAIC POWER STATION
IN MOCUBA, ZAMBEZIA PROVINCE
36
INACIO MANUEL
37
37
RAQUETA PAULO
LIDIA VICTORINO
39
LIDIA SOZINHO
41
41
ADELINA SANTOS
NADIA CARLITOS
42
42
AMELIA SANTOS
FLAVIA VICENTE
Outra
Chefe do
af
Filho(a)
Chefe do
af
Chefe do
af
Filho(a)
Chefe do
af
Filho(a)
42
XADREQUE JULIO
Outra
42
DELITO JULIO
Outra
42
LEVE JULIO
43
43
LAURINDA ANTONIO
PALMIRA VIRGILIO
Outra
Chefe do
af
Filho(a)
44
45
ARNALDO BENTO
AMINA PEDRO
47
47
47
49
51
LIMITADA MANGACAO
ZINHA LIMITADA
DEDINHA LIMITADA
MARCELINO
FRANCISCO
MARIA PAULO
52
ARTUR MANUEL
52
MADALENA SULVAI
54
57
LINO MATEMATE
GUNLELA CAMPOS
NICUE
58
JULIETA NDUHA
Outra
Pai/mÃe
Chefe do
af
Filho(a)
Filho(a)
Chefe do
af
Filho(a)
Chefe do
af
Esposa do
cf
Chefe do
af
Chefe do
af
Chefe do
af
Masculin
o
18 CRIANÇA ORFÃ
Feminino
Feminino
47 OUTRA
18 MÃE SOLTEIRA
Feminino
52 OUTRA
Feminino
Feminino
58 OUTRA
20 MÃE SOLTEIRA
Feminino
Feminino
Masculin
o
Masculin
o
Masculin
o
39 OUTRA
17 MÃE SOLTEIRA
Feminino
Feminino
Masculin
o
Feminino
Masculin
o
Feminino
Feminino
Masculin
o
Feminino
Masculin
o
49 OUTRA
12 DEFICIÊNCIA FíSICA
Feminino
Masculin
o
61 OUTRA
PESSOA IDOSA (ACIMA DE 60
74 ANOS)
Feminino
78 OUTRA
Feminino
65 OUTRA
18 CRIANÇA ORFÃ
13 CRIANÇA ORFÃ
12 CRIANÇA ORFÃ
5 PESSOA COM DOENçA
71 OUTRA
PESSOA IDOSA (ACIMA DE 60
65 ANOS)
17 MÃE SOLTEIRA
30 MÃE SOLTEIRA
22 DEFICIÊNCIA FíSICA
18 PESSOA COM DOENçA
74 OUTRA
PROJECT TO BUILD A PHOTOVOLTAIC POWER STATION
IN MOCUBA, ZAMBEZIA PROVINCE
58
GAWENHERANE
NIHELO
Pai/mÃe
59
MAURICIO FRANCISCO
Filho(a)
60
62
65
65
CONSTANCIO ALBERTO
ANA PAULA LUIS
CANDIDA FERNANDO
ANAPAULA FERNANDO
Filho(a)
Filho(a)
Filho(a)
Filho(a)
65
RISUAN ADAMO
68
ACIDO LONDINHO
68
JULIA NIVAVIHA
Outra
Chefe do
af
Esposa do
cf
68
BONEFACIO HILARIO
69
LURDE UASSANANIA
70
MANUEL JOAO
71
CATARINA CARACASSE
73
AMBROSIO ALFREDO
74
XARIFO JUBAR
77
MARGARIDA VICENTE
Filho(a)
Chefe do
af
77
CARLITOS MARIO
Outra
77
PELI SALIMO
Outra
77
FARUK SALIMO
Outra
77
77
JAGUAR SALIMO
SARA SALIMO
78
DAUNISA T MACONDE
83
AGOSTINHO LUIS
Outra
Outra
Chefe do
af
Chefe do
af
Outra
Chefe do
af
Outra
Chefe do
af
Cunhado(a
)
Feminino
Masculin
o
Masculin
o
Feminino
Feminino
Feminino
Masculin
o
Masculin
o
85 OUTRA
Feminino
Masculin
o
37 PESSOA COM DOENçA
Feminino
Masculin
o
74 OUTRA
Feminino
Masculin
o
Masculin
o
68 OUTRA
Feminino
Masculin
o
Masculin
o
Masculin
o
Masculin
o
Feminino
50 VIÚVA
Feminino
Masculin
o
71 VIÚVA
3 PESSOA COM DOENçA
5
5
18
16
DEFICIÊNCIA FíSICA
PESSOA COM DOENçA
MÃE SOLTEIRA
MÃE SOLTEIRA
2 PESSOA COM DOENçA
51 PESSOA COM DOENçA
18 CRIANÇA ORFÃ
15 CRIANÇA ORFÃ
53 DEFICIENCIA MENTAL
16 DIFICIENCIA AUDITIVA
18 DEFICIENCIA MENTAL
15 CRIANÇA ORFÃ
13 CRIANÇA ORFÃ
11 CRIANÇA ORFÃ
9 CRIANÇA ORFÃ
35 DEFICIÊNCIA FíSICA
PROJECT TO BUILD A PHOTOVOLTAIC POWER STATION
IN MOCUBA, ZAMBEZIA PROVINCE
83
83
ZITO AGOSTINHO
NOEMIA AGOSTINHO
84
BERNARDO MOLE
88
SALVADOR MOREIRA
88
ROSA PINTO
90
91
JULIO ANGELO
ANABELA GERONIMO
92
92
ROSITA SUATERA
MELUCHA AUGUSTO
93
MADALENA SULYAI
95
96
97
ANGELINO ALFREDO
ROSA SIAMANTO
ROSA AUGUSTO
100
AFONSO TAVA
Filho(a)
Filho(a)
Chefe do
af
Chefe do
af
Esposa do
cf
Chefe do
af
Filho(a)
Chefe do
af
Filho(a)
Chefe do
af
Chefe do
af
AvÔ/avÓ
AvÔ/avÓ
Chefe do
af
100
JON AFONSO
Filho(a)
101
ANGELO RACHIDE
105
IZALGINA NAMALUPA
Filho(a)
Chefe do
af
106
EUGENIO AUGUSTO
108
ALICE CEBOLA
Filho(a)
Chefe do
af
108
EDILSON HORACIO
Outra
108
EMILTON ADOLFO
Outra
108
AURELIO ANDRE
109
109
JOAO CINQUENTA
ANGELINA
Outra
Chefe do
af
Esposa do
Masculin
o
Feminino
Masculin
o
Masculin
o
Feminino
Masculin
o
Feminino
Feminino
Feminino
Feminino
13 SURDO
10 DEFICIÊNCIA FíSICA
PESSOA IDOSA (ACIMA DE 60
78 ANOS)
71 OUTRA
PESSOA IDOSA (ACIMA DE 60
63 ANOS)
36 PESSOA COM DOENçA
22 MÃE SOLTEIRA
47 MULHER CHEFE DE FAMíLIA
8 PESSOA COM DOENçA
PESSOA IDOSA (ACIMA DE 60
61 ANOS)
Feminino
Feminino
Feminino
Masculin
o
Masculin
o
Masculin
o
49 MULHER CHEFE DE FAMíLIA
80 OUTRA
78 OUTRA
Feminino
Masculin
o
41 MULHER CHEFE DE FAMíLIA
Feminino
Masculin
o
Masculin
o
Masculin
o
Masculin
o
Feminino
75 OUTRA
40 PESSOA COM DOENçA
11 DEFICIENCIA MENTAL
9 DEFICIÊNCIA FíSICA
10 PESSOA COM DOENçA
12 CRIANÇA ORFÃ
9 CRIANÇA ORFÃ
6 CRIANÇA ORFÃ
PESSOA IDOSA (ACIMA DE 60
74 ANOS)
69 PESSOA IDOSA (ACIMA DE 60
PROJECT TO BUILD A PHOTOVOLTAIC POWER STATION
IN MOCUBA, ZAMBEZIA PROVINCE
LAMPISSONE
110
JOSE MACONTARA
112
LIDIA REMIGIO
113
REMIGIO RONDA
114
114
HERMINIO PEQUENINO
ESPERANCA HERMINIO
cf
Chefe do
af
Chefe do
af
Chefe do
af
Chefe do
af
Filho(a)
114
OSVALDO HERMINIO
Filho(a)
115
GREGORIO JOAQUIM
Outra
115
115
117
117
ANTONIO AUGUSTO
ALBERTINA AUGUSTO
DALILA LUCIANO
ALICIANA LUCIAMO
Outra
Outra
Filho(a)
Filho(a)
117
EDI COSTA
Outra
117
WALTER DA COSTA
Outra
117
RICHA DA COSTA
Outra
117
QUELVE DA COSTA
118
LIDIA BAPTISTA
119
119
119
119
DALILA PENEIRA
GILDA ILANIO
GENIA ILANIO
VIVIA ILANIO
Outra
Esposa do
cf
Chefe do
af
Outra
Outra
Outra
119
EDSON ILANIO
Outra
120
LISEU DANIEL
120
JOAQUIM ALFREDO
Outra
IrmÃo/irm
Ã
121
JORDAO DANIEL
Filho(a)
Masculin
o
ANOS)
PESSOA IDOSA (ACIMA DE 60
61 ANOS)
Feminino
Masculin
o
Masculin
o
Feminino
Masculin
o
Masculin
o
Masculin
o
Feminino
Feminino
Feminino
Masculin
o
Masculin
o
Masculin
o
Masculin
o
39 MULHER CHEFE DE FAMíLIA
PESSOA IDOSA (ACIMA DE 60
73 ANOS)
Feminino
34 DEFICIÊNCIA FíSICA
Feminino
Feminino
Feminino
Feminino
Masculin
o
Masculin
o
39
14
12
10
Feminino
Masculin
o
40 PESSOA COM DOENçA
52 DEFICIÊNCIA FíSICA
13 PESSOA COM DOENçA
12 PESSOA COM DOENçA
4 PESSOA COM DOENçA
14
13
30
30
OUTRA
CRIANÇA ORFÃ
VIÚVA
VIÚVA
16 MÃE SOLTEIRA
12 CRIANÇA ORFÃ
6 CRIANÇA ORFÃ
3 CRIANÇA ORFÃ
MULHER CHEFE DE FAMíLIA
CRIANÇA ORFÃ
CRIANÇA ORFÃ
OUTRA
7 CRIANÇA ORFÃ
4 CRIANÇA ORFÃ
22 PESSOA COM DOENçA
PROJECT TO BUILD A PHOTOVOLTAIC POWER STATION
IN MOCUBA, ZAMBEZIA PROVINCE
122
GRACINDA SETEMANE
122
124
127
JULIO MANUEL
CONCEICAO JOSE
DERCIA DANIEL
128
ANALISA DOS SANTOS
131
EUSEBIO NAVELA
132
CURIANA CAMPO
134
AMINA JAIME
137
137
EUGENIA NANHALO
ESTRELA FERNANDO
137
ANTONIO JOAO
138
ANTONIO AMELA
139
JULIET5A PEDRO
140
LUISA ETAGA
141
141
141
CECILIA NAMAELA
INES ARLINDO
TERESA ARLINDO
142
142
MANUEL AMBROSIO
BEATRIZ MANUEL
143
146
146
147
ANGELA PANAVE
VICTORIA LUIS
SONIA LUIS
SARA MOISES
148
FERNANDO JOAO
148
151
ISABEL NICOLOCO
JULIANO ANTONIO
Chefe do
af
Filho(a)
Outra
Filho(a)
IrmÃo/irm
Ã
Chefe do
af
Sogro(a)
Esposa do
cf
Esposa do
cf
Filho(a)
Cunhado(a
)
Chefe do
af
Chefe do
af
Chefe do
af
Chefe do
af
Filho(a)
Filho(a)
Chefe do
af
Filho(a)
Chefe do
af
Filho(a)
Filho(a)
Filho(a)
Chefe do
af
Esposa do
cf
Chefe do
Feminino
Masculin
o
Feminino
Feminino
69 OUTRA
Feminino
Masculin
o
Feminino
29 MÃE SOLTEIRA
PESSOA IDOSA (ACIMA DE 60
61 ANOS)
PESSOA IDOSA (ACIMA DE 60
73 ANOS)
Feminino
28 PESSOA COM DOENçA
Feminino
Feminino
Masculin
o
Masculin
o
64
27 MÃE SOLTEIRA
Feminino
76 OUTRA
Feminino
80 OUTRA
Feminino
Feminino
Feminino
Masculin
o
Feminino
48 OUTRA
22 MÃE SOLTEIRA
20 MÃE SOLTEIRA
PESSOA IDOSA (ACIMA DE 60
62 ANOS)
19 MÃE SOLTEIRA
Feminino
Feminino
Feminino
Feminino
Masculin
o
58
17
10
25
Feminino
Masculin
15 DEFICIENCIA MENTAL
20 MÃE SOLTEIRA
10 DEFICIENCIA AUDITIVA
60 DEFICIÊNCIA FíSICA
PESSOA IDOSA (ACIMA DE 60
77 ANOS)
VIÚVA
DEFICIENCIA MENTAL
OUTRA
MÃE SOLTEIRA
PESSOA IDOSA (ACIMA DE 60
80 ANOS)
PESSOA IDOSA (ACIMA DE 60
68 ANOS)
74 OUTRA
PROJECT TO BUILD A PHOTOVOLTAIC POWER STATION
IN MOCUBA, ZAMBEZIA PROVINCE
af
Esposa do
cf
Chefe do
af
Esposa do
cf
Outra
151
BERTA NAHINNE
152
VIDAL NALELO
152
152
BELITA MACAVA
LUISA CESAR
152
152
JEOVA CESAR
JAMILA CESAR
155
155
156
156
JOAOZINHO RICARDO
VERONICA JOAOZINHO
MADALENA
TELEGRAMA
DIOLINDA VIRGILIO
Outra
Outra
Chefe do
af
Filho(a)
Chefe do
af
Filho(a)
156
FIDEL EVARISTO
Outra
156
156
Outra
Outra
Chefe do
af
157
157
ROSARIO EVARISTO
ESPERANCA EVARISTO
ALEXANDRE
MANGACAO
ANASTACIA
ALEXANDRE
ISAIDA ALEXANDRE
161
SIDINE ADINANE
161
OLINDO ALBERTO
Filho(a)
Filho(a)
Chefe do
af
IrmÃo/irm
Ã
161
AGOSTINHO MARCOS
Outra
163
163
ABEL TARZAN
IRANIA TARZAN
165
ATIJA LUCIANO
166
CRISTINA CORDEIRO
167
ELISEU NICOSSE
Filho(a)
Filho(a)
IrmÃo/irm
Ã
Chefe do
af
Chefe do
af
157
o
Feminino
Masculin
o
Feminino
Feminino
Masculin
o
Feminino
Masculin
o
Feminino
PESSOA IDOSA (ACIMA DE 60
65 ANOS)
PESSOA IDOSA (ACIMA DE 60
64 ANOS)
PESSOA IDOSA (ACIMA DE 60
60 ANOS)
11 CRIANÇA ORFÃ
12 CRIANÇA ORFÃ
10 CRIANÇA ORFÃ
40 DEFICIÊNCIA FíSICA
20 PESSOA COM DOENçA
Feminino
Feminino
Masculin
o
Masculin
o
Feminino
Masculin
o
56 OUTRA
17 DEFICIÊNCIA FíSICA
Feminino
Feminino
Masculin
o
Masculin
o
Masculin
o
Masculin
o
Feminino
28 PESSOA COM DOENçA
20 MÃE SOLTEIRA
Feminino
15 MÃE SOLTEIRA
Feminino
Masculin
o
45 MULHER CHEFE DE FAMíLIA
14 CRIANÇA ORFÃ
9 CRIANÇA ORFÃ
5 CRIANÇA ORFÃ
PESSOA IDOSA (ACIMA DE 60
65 ANOS)
47 PROBLEMA DE VISTA
49 DEFICIENCIA MENTAL
15 CRIANÇA ORFÃ
20 DEFICIêNCIA FíSICA
18 MÃE SOLTEIRA
65 OUTRA
PROJECT TO BUILD A PHOTOVOLTAIC POWER STATION
IN MOCUBA, ZAMBEZIA PROVINCE
169
JOANA AVELINO
169
ARMANDO EMILIO
170
LUIS ROQUE
172
SAIDE ANTONIO
176
ANTONIO SAJONE
179
179
SILVERIO MAJAMANDA
ILDA SILVERIO
181
EUGENIA NACARANI
182
ADELIA FABIAO
182
ALJOFRE FABIO
182
183
MILAIDE FABIO
AMINA FELIZ
184
OAQUINA MUNHALA
185
ZEFERINO NIHUMA
185
MARGARIDA MAGALA
188
LUIS MUTANAGUE
191
CRISTINA MANUEL
196
LUISA CUNHETE
197
197
197
SILVA MUSSAMARIA
DOMINGA
MUSSAMARIA
JOZEFA PONPICIO
198
199
MADALENA TULIUA
MARIANA PEQUENINO
Chefe do
af
Filho(a)
Chefe do
af
IrmÃo/irm
Ã
Chefe do
af
Chefe do
af
Filho(a)
Chefe do
af
Chefe do
af
IrmÃo/irm
Ã
IrmÃo/irm
Ã
Filho(a)
Chefe do
af
Chefe do
af
Esposa do
cf
Chefe do
af
Cunhado(a
)
Chefe do
af
Outra
Outra
Outra
Chefe do
af
Pai/mÃe
Feminino
Masculin
o
Masculin
o
Masculin
o
Masculin
o
Masculin
o
Feminino
39 MULHER CHEFE DE FAMíLIA
Feminino
55 MULHER CHEFE DE FAMíLIA
Feminino
Masculin
o
37 OUTRA
Feminino
Feminino
12 DEFICIÊNCIA FíSICA
PESSOA IDOSA (ACIMA DE 60
62 ANOS)
6 CRIANÇA ORFÃ
62 SOFRE DE RINS
56 PESSOA COM DOENçA
34 OUTRA
10 CRIANÇA ORFÃ
8 CRIANÇA ORFÃ
4 DEFICIENCIA AUDITIVA
Feminino
Masculin
o
59 OUTRA
PESSOA IDOSA (ACIMA DE 60
74 ANOS)
Feminino
Masculin
o
60 PESSOA COM DOENçA
Feminino
18 DEFICIENCIA MENTAL
Feminino
Masculin
o
49 VIÚVA
Feminino
Feminino
28 MÃE SOLTEIRA
18 OUTRA
Feminino
Feminino
48 VIÚVA
52 OUTRA
42 DEFICIÊNCIA FíSICA
30 DEFICIÊNCIA FíSICA
PROJECT TO BUILD A PHOTOVOLTAIC POWER STATION
IN MOCUBA, ZAMBEZIA PROVINCE
200
FAUSIA CARLITO
Outra
Chefe do
af
Filho(a)
201
202
EUGENIA MULALEIA
LUCIA FRANCISCO
202
EMANUEL DAVIDE
204
204
JACINTA BERNARDO
IVONE JOSE
206
SANTOS NAUELA
Outra
Chefe do
af
Filho(a)
Chefe do
af
206
206
SIMONE SANTOS
OLINDA SANTOS
Filho(a)
Filho(a)
Feminino
10 CRIANÇA ORFÃ
Feminino
Feminino
Masculin
o
70 OUTRA
22 MÃE SOLTEIRA
Feminino
Feminino
Masculin
o
Masculin
o
Feminino
44 MULHER CHEFE DE FAMíLIA
27 MÃE SOLTEIRA
4 DEFICIENCIA MENTAL
39 PROBLEMA DE AUDICAO
6 PESSOA COM DOENçA
0 PESSOA COM DOENçA
PROJECT TO BUILD A PHOTOVOLTAIC POWER STATION
IN MOCUBA, ZAMBEZIA PROVINCE
Appendix 5
MODELS OF
CLAIM REGISTRATION FORM (MODEL 1)
AND
CLAIM RESOLUTION REPORT
(MODEL 2)
PROJECT TO BUILD A PHOTOVOLTAIC POWER STATION
IN MOCUBA, ZAMBEZIA PROVINCE
MODEL 1
Claim Registration Form
Claim Nr. (to be
completed by the LC)
Date
Name of person filing
the claim
Village/Neighbourhood
ID Nr. of person filing
the claim
Census Registration
Number (if applicable)
Contact of person
filing the claim
Claim filed by (name and
title):
Detailed Description of the Claim
Pictures and /or support documents (insert reference and attach copy)
PROJECT TO BUILD A PHOTOVOLTAIC POWER STATION
IN MOCUBA, ZAMBEZIA PROVINCE
MODEL 2
Claim Resolution Report
Claim Nr.
Date Claim Was
Received
Name of person filing the claim
Village/Neighbourhood
ID Nr. of person filing the claim
Census Registration
Number (if applicable)
Contact
Issue Solved By
Description of the Resolution Measure Taken
Acceptance of the Resolution Measure Applied by the Person Filing the Claim
I _____________________________________, declare that my claim was handled in a
timely and effective manner, and I declare that I agree with the resolution measure
proposed and implemented.
Name of the person filing the claim:
Signature (or fingerprint) of the person filing the claim:
Officer Name:
Officer Signature:
Witness Name:
Witness Signature:
PROJECT TO BUILD A PHOTOVOLTAIC POWER STATION
IN MOCUBA, ZAMBEZIA PROVINCE

Documentos relacionados

decisão coren-pr - 14/2015 concessão de cancelamento de registro

decisão coren-pr - 14/2015 concessão de cancelamento de registro ELEYDE PEDRINI ELIZIANE CARLA C. SPELIER ERIC DIEGO TUROSSI AMORIM FABIO COLDEBELLA FERNANDA RODRIGUES JOSE FRANCIELI PADILHA DE CARVALHO GABRIELA NALDI GRACIELY OSTERNACK DE ALMEIDA HELOISE MACIEL...

Leia mais