Object Reports INDULSNAP

Transcrição

Object Reports INDULSNAP
Wall air passage
INDULSNAP
MGUV Potsdam - New Ministerial Building
Photo © Christian Richters
New Ministerial Building for the
Brandenburg State Government
Features
A new ministerial building with an area
of 10,000 square metres for 460 employees has been constructed on the
government site in the Henning-vonTreskow Straße. This new construction
is the final stage of the combination of
the merger of the ministries, which
moves them into the centre of the city
and near to the new state parliament
building. With an annual primary energy consumption of only 50 kWh/m², the
barrier-free building fulfils the requirements of the passive buildings standard, and with surface heating and concrete core cooling is both sustainable
and energy-efficient. Constructed in a
public-private partnership, the design
by the company SEHW Architektur is
grouped around three differently designed courtyards. The shell of the
building was developed so as to have
many vertical layers and variations.
With the combined air diffuser
INDULSNAP V45 K it was possible to
implement an identical and consistent
appearance for the supply air and extraction air. Due to the airflow rate of
30m³/h per person or 60m³/h for a twoperson office as specified by IDA 3, an
overall installation length of only
860 mm was sufficient. For acoustic
reasons, the corridor partition walls
have a thickness of 150 mm. The air
plenum box which is integrated into the
corridor wall was adapted to this wall
thickness for installation reasons. With
this, the recommended installation sequence with attachment points on the
cladding remained unchanged and
could be quickly carried out. The plenum box was fastened by clamping it
into the drywall profiles in agreement
with the air conditioning and drywall
construction contractors.
Kiefer INDULSNAP V45 as combined air outlet supply air / extract
air
Maschinenfabrik Gg. Kiefer GmbH Heilbronner Straße 380-396 70469 Stuttgart, Germany
Tel.: +49 (0)711 8109-0 Fax: +49 (0) 711 8109-205 E-Mail: [email protected] www.kieferklima.de
Wall air passage
INDULSNAP
MGUV Potsdam - New Ministerial Building
Function wall air passage INDULSNAP:
IINDULSNAP is a linear diffuser for installation in partition walls with integral silencer offering a high degree of
comfort. The supply air is fed into the room through numerous individual jets guided by aerodynamically formed
fins. The ducts for supplying and extract-ing air are best
installed in the ceiling hollow space of that floor. The
main distribution ducts to individual rooms require a minimum of space for installation.
Object:
New Ministerial Building Potsdam
Architects:
LPH 1 - 5 ARGE SEHW –
delusearchitects
LPH 5 - 8 GKK (Gössler Kinz
Kerber Kreienbaum, Hamburg)
Proprietor:
Brandenburgischer Landesbetrieb
für Liegenschaften und Bauen, NL
Potsdam
System advantages:
With integral silencer
PP-Partnership
For use as inlet or outlet
Volume flow up to 250 m³/hm
Input attenuation ≥ 34 dBA
Higher thermal comfort due to
draught-free air distribution
Fast installation
represented by:
STRABAG Real Estate GmbH
Direktion Public Private
Partnerchip
Customer:
Ed. Züblin AG, Bereich Brandenburg und Sachsen-Anhalt
Consultant:
Ingenieurbüro Knott + Partner, Berlin
Linear diffuser:
system
Wall air passage
INDULSNAP V45
Easy to clean as specified in VDI 6022
E3013-72_05/16
ensured by removable air guide profiles
Photo © Christian Richters
Maschinenfabrik Gg. Kiefer GmbH Heilbronner Straße 380-396 70469 Stuttgart, Germany
Tel.: +49 (0)711 8109-0 Fax: +49 (0) 711 8109-205 E-Mail: [email protected] www.kieferklima.de
Wall Air Passage
INDULSNAP
Photo © Mercedes-Benz Bank
Mercedes-Benz-Bank Stuttgart
At the headquarters of the Mercedes-Benz Bank in Stuttgart, in which four sites have been combined in a single central
building, about 1000 employees occupy 28,000 m². Transparency and flexibility are the company values that are successfully reflected in this new building.
Function wall
INDULSNAP:
air
passage
INDULSNAP is a linear diffuser for
installation in partition walls with
integral silencer offering a high
degree of comfort. The supply air is
fed into the room through numerous
individual jets guided by aerodynamically formed fins.
The ducts for supplying and extracting air are best installed in the ceiling
hollow space of that floor. The main
distribution ducts to individual rooms
require a minimum of space for installation.
Building:
Mercedes-Benz Bank, Stuttgart
Architects:
Zlitz + Partner, Stuttgart
Interior architects:
Hinrichsmeyer + Bertsch, Böblingen
Proprietor:
Häussler Gruppe, Stuttgart
General contractor:
Bilfinger + Berger Bau AG, Stuttgart
Consultant, building
services:
Ingenieurbüro Scheer, Wendlingen
Linear diffuser system:
Wall air passage INDULSNAP
Type of ceiling:
Plasterboard ceilings
Scope:
28,000 m² conditioned area
Scope of order:
1,760 rm. of wall air passages
INDULSNAP Type V20
3013-07_04/13
System advantages:
With integral silencer
For use as inlet or outlet
Volume flow up to 250 m³/hm.
Input attenuation ≥ 34 dB
Greater thermal comfort due to
draught-free air supply
Fast installation.
Easy to clean, as specified in VDI
6022, due to removable air guide
profiles
Maschinenfabrik Gg. Kiefer GmbH Heilbronner Straße 380-396 70469 Stuttgart, Germany
Tel.: +49 (0)711 8109-0 Fax: +49 (0) 711 8109-205 E-Mail: [email protected] www.kieferklima.de
Wall air passage
INDULSNAP
SAP Deutschland AG – Walldorf: Campus II
Function wall
INDULSNAP
air
passage
INDULSNAP is a linear diffuser for
installation in partition walls with
integral silencer offering a high degree of comfort. The supply air is fed
into the room through numerous
individual jets guided by aerodynamically formed fins. The ducts for
supplying and extracting air are best
installed in the ceiling hollow space
of that floor. The main distribution
ducts to individual rooms require a
minimum of space for installation.
System advantages
■ With integral silencer
■ For use as inlet or outlet
■ Greater thermal comfort due to
■
E3013_24 12/08
■
■
■
Photo © SAP AG / Stefan Schilling
With the new Campus II building
in Walldorf, the Häussler Group
from Stuttgart has created an
office and space concept that
fulfils the most
demanding
requirements with respect to temperature, humidity and acoustics
combined with a flexible interior
layout. Future-oriented workplaces and the well-being of the employees were the guiding principles. With 2,100 new office workplaces, 24 conference rooms, and
a cafeteria seating 1,500 persons,
this new landmark building in
Walldorf's "SAP City" has been
successfully completed.
draught-free air supply
Absorption box can be
installed in partition wall
Requires no space in room.
Fast installation.
Easy to clean, as specified in
VDI 6022, due to removable
air guide profiles
Building:
SAP Deutschland AG
Walldorf: Campus II
Architects:
Vorfelder Freie Architekten
Walldorf
Proprietor and investor:
SAP AG
Consultant, building services:
Zimmermann + Partner GmbH
Walldorf
Consultant, building physics:
GH Bauphysik
Finkenberger + Kollegen
Stuttgart
Installation:
INDULSNAP V45K
2,750 units
Air flow:
Up to 160 m³/hm
Input attenuation:
≥ 34 dB
Supply air
temperature difference:
Max. – 8K
Diffuser width:
45 mm
Maschinenfabrik Gg. Kiefer GmbH ● Heilbronner Straße 380-396 ● 70469 Stuttgart, Germany
Tel.: +49 (0)711 8109-0 ● Fax: +49 (0) 711 8109-205 ● E-Mail: [email protected] ● www.kieferklima.de
Wall air passage
INDULSNAP
SpOrt Stuttgart
Photo © SpOrt Stuttgart
Outstanding competence in sport
is united beneath the roof of
SpOrt Stuttgart. An effective area
of 20,000 m² houses sports associations, companies with sporting
links, and medical services associated with sport. For active sport,
a fitness studio, a multi-purpose
sports hall with a grandstand, and
a range of training and event
rooms are available. SpOrt Stuttgart lies in the heart of the Stuttgart's NeckarPark close to the
Daimler Stadium, the Porsche
Arena and the Kunst-Turn-Forum.
Function wall air passage
INDULSNAP
INDULSNAP is a linear diffuser for
installation in partition walls with
integral silencer offering a high degree of comfort. The supply air is fed
into the room through numerous
individual jets guided by aerodynamically formed fins.
The ducts for supplying and extracting air are best installed in the ceiling
hollow space of that floor. The main
distribution ducts to individual rooms
require a minimum of space for
installation.
Building:
SpOrt Stuttgart
Architects:
Hermann + Bosch
Freie Architekten BDA, Stuttgart
Proprietor:
SpOrt Stuttgart
Stuttgart
General contractor:
Kubus Generalplaner
Stuttgart
Consultant, building services:
T.P.I Trippe + Partner
Ingenieurgesellschaft Stuttgart
Linear diffuser system:
Wall air passage INDULSNAP
Scope:
4,500 m² conditioned area
System advantages
With integral silencer
For use as inlet or outlet
Volume flow up to 250 m³/hm.
Input attenuation ≥ 34 dB
Greater thermal comfort due to
draught-free air supply
■ Fast installation.
■ Easy to clean, as specified in
VDI 6022, due to removable
air guide profiles
E3013_8 12/08
■
■
■
■
■
Maschinenfabrik Gg. Kiefer GmbH ● Heilbronner Straße 380-396 ● 70469 Stuttgart, Germany
Tel.: +49 (0)711 8109-0 ● Fax: +49 (0) 711 8109-205 ● E-Mail: [email protected] ● www.kieferklima.de