Europass-Curriculum Vitae

Transcrição

Europass-Curriculum Vitae
Europass-Curriculum
Vitae
Personal Information
Nickname (s)/name (s)own(s) Ataíde de Faria Peixoto, José Filipe .
Adress Residence
Rua S Tiago de Brandara nº 1497 – Lugar de Canadelo - Brandara
4990-560 Ponte de Lima
Portugal
GSM number PT (+351) 962168805
GSM number AO (+244) 926362964
Email
[email protected]
Skype Name : FilipeAtaide1
FB Name : Jose F Ataide
Nationality
Portuguese
Date of Born
21-09-1974
Sex
Male
Profissional Experience
Dates /Annual Reference
Function or Position Held
Main activities and responsibilities
1996
Internship period in simultaneously teaching
Production: Responsible Deputy of work on site, cost control and variance analysis, preparation of
work, deputy negotiating subcontracts and occasional points.
Exploration Aggregates / Deputy Management of equipment.
Name and Adress of Company CIVOPAL – Sociedade de Construção Civil e Obras Públicas Aliança, Lda. – Avª da Republica
1344 – 5º Apartdo 250 – 4431 – Vila Nova de Gaia – Porto – Portugal
Type of Company or Industry Construction and Public Works
Dates /Annual Reference
Function or Position Held
Página 1/ 8- Curriculum vitae de
Ataíde de Faria Peixoto, José Filipe
1996 – 2000
Site Manager / Production ( Works Director – Production )
Para mais informações sobre o Europass, consulte http://europass.cedefop.europa.eu
© Comunidades Europeias, 2003 20060628
Main activities and responsibilities
Name and Adress of Company
Type of Company or Industry
Budgeting, Planning and Analysis of variants to the Project, Procurement and Materials Trading
Subcontractors.
General Liability Production
CIVOPAL – Sociedade de Construção Civil e Obras Públicas Aliança, Lda. – Avª da Republica
1344 – 5º Apartdo 250 – 4431 – Vila Nova de Gaia – Porto – Portugal
Construction and Public Works
________________________________ __________________________________________________________________________________
Dates /Annual Reference
Function or Position Held
Main activities and responsibilities
2000 – 2006/07 - PORTUGAL
Site Engineer and Project Manager
2000/2003 - Site Engineer - Overall responsible for the execution
2003/2006(7) – Project Manager – Director of Coordination of Work (s) with control functions of
economic and physical contracts
Name and Adress of Company
ABB, SA – Alexandre Barbosa Borges, SA – Loteamento do Feital lote 1 Frossos – 4700-152
BRAGA – Portugual
Type of Company or Industry Construction and Public Works
________________________________ __________________________________________________________________________________
Dates/Annual Rerence
Function or Position Held
2007 – PORTUGAL
Consulting and Inspeccion – Project Implementation Manager - Refinary
Main activities and responsibilities Project includes
Aquisition of new container handling equipment, logistics, refurbishment of the existing
infrastructures, pavement, quay wall and construction of new buildings. Preparation of
Project Charters, Project Plans, Budgets, Project Schedules, Risk Management Plans,
Mitigation Plans, Reporting and other project lifecycle documents.
Name and Adress of Company
Type of Company or Industry
Dates/Annual Rerence
( MBD ) – PETROGAL GALP Rua D. Nuno Alvares Pereira
4100 Porto – Portugal
Consulting and Inspeccion
2007 – 2011 – ANGOLA ( LUANDA )
Function or Position Held 2007/2009 - Project Manager
2009 /2011 - Director of Technical Area ( Marginal 4 February Project – Bay of Luanda )
Main activities and responsibilities
Página 2/ 8- Curriculum vitae de
Ataíde de Faria Peixoto, José Filipe
Leadership of the entire construction team – Site Construction Manager / Planning Mananger
Para mais informações sobre o Europass, consulte http://europass.cedefop.europa.eu
© Comunidades Europeias, 2003 20060628
Name and Adress of Company
MOTAENGIL ( Angola )
Avenida António Barroso nº52
Luanda – Angola
Internacional
Type of Company or Industry
Dates/Annual Rerence
Function or Position Held
Angola
Construction and Public Works
2012 until August
Site General Manager LMGROUP – Consortium Angola with EGESA ( Brasil )
Main activities and responsibilities Consulting and technical Audit to Consortium ( Execution and Economic Control )
LM GRUPO
PROJECTS / WORKS EXECUTED
____________________________
Title of Contract / Owner of Work / Value in €
________________________________________________________________________________
Página 3/ 8- Curriculum vitae de
Ataíde de Faria Peixoto, José Filipe
Para mais informações sobre o Europass, consulte http://europass.cedefop.europa.eu
© Comunidades Europeias, 2003 20060628
1996 – 2000 CIVOPAL
1-
Via de Ligação EN Carvalhos Espinho – CM Espinho – 2.879.544,00€ ( Road Works and
infrastructure )
2-
Avenida 33 – CM Espinho – 457.812,00€ ( Road Works and Infrastructure )
3-
Ligação entre Avenida 29 com Av 33 e Restabelecimento de Rotunda 33 – CM Espinho 378.000,00€ ( Road Works and Infrastructure )
4-
Alargamento a AE1 – Nó dos Carvalhos – BRISA - 86.380.000,00€ ( Road Works and
Infrastructure )
5-
Centro de Estágios e Treinos do FCP – Infraestruturas Técnicas ( Drenagens e Pavimentos)Pedroso – Futebol Club do Porto / EDIGAIA – 12.932.00,00€ ( Building Construction Oporto
FootballClub ) – (CENTER STAGE Building )
6-
Complexo Desportivo de Leça ( Consórcio CIVOPAL / SOMAGUE ) – CM Matosinhos –
5.360.000,00€ ( Sports Coaching Area )
7-
Avenida de Francelos – Reabilitação de Pavimentos e Infraestruturas – CM VNGaia –
1.760.000,00€ ( Road Works and Infrastructure )
8-
Avenida das Corujeiras - Reabilitação de Pavimentos e Infraestruturas – CM VNGaia –
1.340.000,00€. ( Road Works and Infrastructure )
9-
Reabilitação da Praça do Município de Matosinhos – CM Matosinhos – 2.060.000,00€
( Road Works and Infrastructure )
10- Passagem Superior e Muros de Contenção sobre a Linha da REFER em S. Mamede – CM
Matosinhos – 2.680.000,00€ ( OverPass Ferry Line and Containing Walls )
11- Infraestruturas e Pavimentos da Unidade Industrial TINTAS BARBOT – BARBOT –
1.860.000,00€ ( Unit Industrial Company )
12- Requalificação de Infratruras Pavimentos da Rua Álvaro Castelões – SMAS de Matosinhos –
1.723.000,00€.( Road Works and Infrastructure )
13- Requalificação de Infratruras Pavimentos da Rua do Godinho – SMAS de Matosinhos –
2.459.000,00€. ( Road Works and Infrastructure )
14- Requalificação de Infratruras Pavimentos da Av. Serpa Pinto – SMAS de Matosinhos –
8.867.000,00€. ( Road Works and Infrastructure )
________________________________
Página 4/ 8- Curriculum vitae de
Ataíde de Faria Peixoto, José Filipe
_________________________________________________________________________________
Para mais informações sobre o Europass, consulte http://europass.cedefop.europa.eu
© Comunidades Europeias, 2003 20060628
1-
Mercado Abastecedor de Braga 1ª Fase Movimentação de terras e Contenções –
ECAN/MARN – 7.966.882,00€ ( Retail Park - Earthworks and retaining walls )
2-
Mercado Abastecedor de Braga 2ª Fase – Infraestruturas Gerais / Pavimentos e Estrutura do
Edifício – 11.765.286,00€ (General Infrastructure / Flooring and Building Structure )
3-
Saneamento do Concelho de Braga – Rede de Emissários – ETAR´s Sistema de Lagunagens
Esporões / Cabreiros / Tebosa – AGERE, EM – 14.665.692,06€ ( Season of treating
wastewater - impoundment system – Emissaries Line )
4-
Estádio do Braga – Galerias Técnicas e InfraEstruturas Gerais / Estabilização de Taludes /
Terra Armada / Redes de Drenagens / Arranjos Exteriores( EURO 2004 ACE - Soares da
Costa / ASSOC ) – CM Braga - 32.345.783,45€ - contravalor da especialidade
18.629.327,65€. ( Braga Soccer Stadium - Galleries and Technical Infrastructures General /
Slope Stabilization / Terra Armada / Drainage Networks / Landscaping )
5-
Acessos ao Estádio do Braga / Restabelecimentos e Fecho da Vaiante de Braga Prado – ICOR
/ EP – 14.456.700,87 € ( Road Acess Stadium )
6-
Saneamento do Concelho de Braga – Rede em Baixa – Esporões / Cabreiros / Tebosa –
AGERE, EM – 3.640.904,41€ (Sewerage network in average diameters)
7-
Estações Elevatórias do Sistema 1 e Emissário Sistema 1,2 Amarela Feital FFD Integral– Mov
Terras / Contenções Especiais / Construção Civil e Equipamentos Electromecânicos –
AGERE,EM – 4.988.790,80€ (Sewerage Pumping Stations and lines Ductile Iron /
Electromechanical Equipment)
8-
Retail Park de Braga – 1ª FASE – Movimentação de Terras, Drenagens e Estabilização de
plataformas – BOUYGUE INTERNATIONAL- 38.261.737,00€ (Moving Lands, Drainage and
Stabilization Platforms)
9-
Saneamento do Concelho de Braga – Rede de Emissários Sistemas 20 e 21 Morreira FFD
Integral – AGERE,EM – 7.378,122,70€ ( Sewerage lines Ductile Iron / Electromechanical
Equipment)
2000-2006
10- Loteamento de Fontela Infraesturuas e pavimentos – EUROLIMPICA – 847.477,71€
( Condominium / Resort – Infrastructures and Paiving )
11- Empreitada de Construção Civil e Instalações Técnicas da Plataforma de Triagem da LIPOR II
Porto – LIPOR II – 18.223.294,20€. ( Sealing trash and construction waste sorting area)
12- Centro de Estágios do SLBenfica 1ª Fase – Movimentação de terras , Drenagens e
Infraestruturas Técnicas, Pavimentos Técnico Desportivos – 3.429.978,66€ (Center SLBenfica
Stages Stage 1 - Moving lands, Drainage and Infrastructure Technical, Technician Sports
Flooring )
13- Canil Municipal de Braga – CM Braga / AGERE, EM – 645,963,00€ ( Kennel Building )
14- Loteamento e Infraestruturas gerais – MINHOINVEST – 2.222.655,50€
( Condominium / Resort – Infrastructures and Paiving )
15- Beneficiação de pavimentos na EN 14 – Braga Famalicão ( Fresagens / recarga de
Betuminoso / Sinalização Vertical e Horizontal ) – EP ( ICOR ) – 13.997.556,00€ (Millings on
pavements, bituminous asphalt in paving roads, signage vertical and horizontal )
16- Conduta distribuidora de GÁS EN14 – PORTGÁS – 12.032.887,00€ ( Pipe Line Gas )
17- Construção de Adutora Ab Água FFD K9 e Caixas de Manobras – AGERE,EM – 1.320.199,00€
( Water Supply Conduit )
__________________________________ __________________________________________________________________________________
Página 5/ 8- Curriculum vitae de
Ataíde de Faria Peixoto, José Filipe
Para mais informações sobre o Europass, consulte http://europass.cedefop.europa.eu
© Comunidades Europeias, 2003 20060628
1-
Tanque Tk 5112 – Petrogal ( maciços, imperbeabilização e Bacia de Retenção periférica em
Betão Armado ) – PETROGAL Refinaria de Leça - 2.589.888,00€ ( Petrol Tank Tk 5112 Petrogal ( and massive PetrolProof Retention Basin and peripheral Reinforced Concrete) PETROGAL Refinery )
2-
Tanque Tk 5220 – Petrogal ( maciços, imperbeabilização e Bacia de Retenção periférica em
Betão Armado ) – PETROGAL Refinaria de Leça - 2.230.412,00€ € ( Petrol Tank Tk 5112 Petrogal ( and massive PetrolProof Retention Basin and peripheral Reinforced Concrete) PETROGAL Refinery )
3-
Maciços Técnicos em Betão Armado – Fundações das Torres Queimadoras ( período de
paragem ) –– PETROGAL Refinaria de Leça - 1.720.344,00€ 3 – Massive Technical
Reinforced Concrete - Foundations of BurnTowers )
2006- 05.2007
Title of Contract / Owner of Work / Value in USD
2007 -2009
Internacional
1-
Instalações DIMA Viana ( MOTA ENGIL ) – 11.112.000,00usd
( Construction of Shipyards Equipment MOTAENGIL – Supervision Progest)
2-
Instalações da CIMERTEX Angola – CIMERTEX ANGOLA – 6.109.574,00usd ( Fiscalização
PROGEST ) ( Industrial Unit CIMERTEX Angola - SuperVision Progest )
3-
Estrada de Kifangondo Catete e Obras Complementares – INEA - 38.679.322,00usd (
Fiscalização AFRICON ) (Road Kifangondo Catete 57 km – Supervision AFRICON)
4-
Via de Ligação Catete Intersection – INEA – 2.830.660,00usd ( Fiscalização AFRICON )
5-
Instalações da NOVICER 1ª Fase – Movimentação de terras – NOVICER / MOTAENGIL
ANGOLA - 1.405.886usd ( Ceramic Industrial Unit NOVICER – Phase1 )
6-
Instalações da NOVICER 2ª Fase – Fundações e Nave Industrial Estrutura Metálica –
NOVICER / MOTAENGIL ANGOLA – Direcção de Obra ) (Novicer Pahse 2 – Metalic Works )
7-
Via de Ligação Viana – Zango – SONANGOL – 8.884.018 usd (Fiscalização SIGMAGROUP )
(Road Conection Viana – Zango – Sonangol – Supervisiom SIGMAGROUP )
8-
Instalações DIMA Viana ( MOTA ENGIL ) – 11.112.000,00usd
( Construction of Shipyards Equipment MOTAENGIL – Supervision Progest)
9-
Instalações da CIMERTEX Angola – CIMERTEX ANGOLA – 6.109.574,00usd ( Fiscalização
PROGEST ) ( Industrial Unit CIMERTEX Angola - SuperVision Progest )
10- Estrada de Kifangondo Catete e Obras Complementares – INEA - 38.679.322,00usd (
Fiscalização AFRICON ) (Road Kifangondo Catete 57 km – Supervision AFRICON)
11- Via de Ligação Catete Intersection – INEA – 2.830.660,00usd ( Fiscalização AFRICON )
12- Instalações da NOVICER 1ª Fase – Movimentação de terras – NOVICER / MOTAENGIL
ANGOLA - 1.405.886usd ( Ceramic Industrial Unit NOVICER – Phase1 )
13- Instalações da NOVICER 2ª Fase – Fundações e Nave Industrial Estrutura Metálica –
NOVICER / MOTAENGIL ANGOLA – Direcção de Obra ) (Novicer Pahse 2 – Metalic Works )
14- Via de Ligação Viana – Zango – SONANGOL – 8.884.018 usd (Fiscalização SIGMAGROUP )
(Road Conection Viana – Zango – Sonangol – Supervisiom SIGMAGROUP )
Página 6/ 8- Curriculum vitae de
Ataíde de Faria Peixoto, José Filipe
Para mais informações sobre o Europass, consulte http://europass.cedefop.europa.eu
© Comunidades Europeias, 2003 20060628
2009-2011
Angola
1-
Requalificação da Baía de Luanda – 127.000.000,00usd – Direcção dos Serviços
Técnicos – Consórcio MotaEngil / Soares da Costa (Rehabilitation of Luanda Bay / Bridge of
Kianda - 127,000,000.00 usd - Director of Technical Services - Consortium MotaEngil / Soares
da Costa )
Director dos Serviços Técnicos - Coordenador dos Departamentos
Director of Technical Services - Manager of Departments
Support the project - Project Coordination
- Signups - Identification and Services Affected
- Physical Planning and Economic Contract
- Measurements and Budgets
- Procurement Sourcing and subcontracting
- Preparation Technique - Issue Register Drawings - Technical Drawing
- Topography
- Quality Control - Laboratory (s) Land (s) Asphalts(s) and Concrete (s)
- Technical Area - Geotechnics and Foundations (Kianda Bridge - Bay of Luanda Marginal)
2 – Zona Económica Especial Luanda Bengo – Infra estruturas Gerais do II Quadrante –
114.870.000,00usd – Início de Obra ( Project Manager )
Education and Academic Formation
Degree and Academic Title
Name and type of organization
providing education and training
1992 a 1997(8)
Degree in Civil Engineering
Civil Engineering
Specialization in Roads and Infrastructure - Progressive Specialization Course
Fernando Pessoa University - 14 Values
Graduate Road Works
Training and Specialization in Special Works - Viaducts / Bridges - Geotechnical Area.
Course "Implementing an Environmental Management System ISO14001" with a final grade – 17
value.
Skills and Personal Skills Course Professional Ethics with the rating of Very Good
WSI Technical English Course - International Buildings - with a final grade of 14 marks.
Other Languages
Self Assesment
UnderStanding
Oral
European Level (*)
English
B1
French
B1
Spanish
B1
Italian
A1
Página 7/ 8- Curriculum vitae de
Ataíde de Faria Peixoto, José Filipe
Ok
Conversation
Lecture
Oral Interaction
Writing
Oral Production
B1
Ok
B1
Ok
B1
Ok
B1
Ok
Ok
B1
Ok
B1
Medium
B1
Medium
B1
Medium
Ok
B1
Ok
B1
Medium
B1
Medium
B1
Medium
A1
Enough
A1
-
A1
-
Enough
Para mais informações sobre o Europass, consulte http://europass.cedefop.europa.eu
© Comunidades Europeias, 2003 20060628
-
Social skills and competences
Organisational skills and
organization
Technical skills and competences
Team spirit, adaptability and great experience in multicultural environments; communication skills.
Experience of leadership; Organizational Experience technical logistics; Experience in managing
projects and teams.
Management of civil engineering works;
Budgeting and variance analysis;
Interaction of Design and Control of Technical Design / Technical Preparation of
Elements;
Procurement and negotiation of subcontracts and Sourcing;
Planning and preparation of work and technical direction of trade.
Knowledge of the technical characteristics of building materials and new building
systems, particularly in the field of infrastructure Handling Techniques of Land and
pavements.
Knower of Technical Standards SATCC
Knowledge of FIDIC regulations
Computer skills and competences
Other skills and competences /
Education Personnel
Microsoft Office applications, Internet, Excel, Word, Micrsoft Project, SAP, ACAD
1 - Member of the Voluntary Corps of the Sovereign Military Order of Malta
2 - Member of the Royal Association of Viana do Castelo – Portugal
3 - Member of the Federation of Karate Do - Budokai Shotokai Portugal (CN3 º DAN)
4 - Military Service fulfilled - Special Operations - RANGERS PORTUGAL - CIOE
Driving License Light Vehicles - CATEGORY B
Aditional Information
- Training Course on Leadership Teams in International Context
- Training Course on Goal and Performance Management
- Training Course on International Competitive Environment - New Techniques for Action
Universidade Nova de Lisboa
- Present in Congress Roads of Portugal organized by IEP - Roads Institute of Portugal "Scope and
Methodology for Dimensioning Flooring and United Conservation."
- Present at the Second African Congress of Roads (2008) - Promoted by INEA (National Institute of
Roads of Angola - MINOP), with the support of FESPSP
- Training Management and Finance for Non-Financial - Promoted by ABS - Angola Business School
in partnership with the Faculty of Economics of the Universidade Nova de Lisboa
- Seminar and Training Legislation on Civil Construction and Public Works of Angola - Ministry of
Public Works of the Government of the Republic of Angola - sponsored by MEA - training consultants
- companies - Advantage +.
- Presence in FILDA - 09/10/2008 and 2011 sessions
Other Activities of Interest / Social / Cultural:
- Interest in equestrian activities
- Assists volunteers in Social Activity
Página 8/ 8- Curriculum vitae de
Ataíde de Faria Peixoto, José Filipe
Para mais informações sobre o Europass, consulte http://europass.cedefop.europa.eu
© Comunidades Europeias, 2003 20060628

Documentos relacionados

Europass-Curriculum Vitae

Europass-Curriculum Vitae Comunicação e escrita – Certificado do CESAE – Centro de Serviços e apoio ás Empresas - O objectivo consistia na qualidade da comunicação e imagem da organização. Tinha como função adquirir conheci...

Leia mais