AMPA-09 HP COMPRESSOR (Brunei) KimFlex Slings,and Shackles
Transcrição
AMPA-09 HP COMPRESSOR (Brunei) KimFlex Slings,and Shackles
PROJECT TITLE AMPA-09 HP Compressor. DATE January 2013. BACKGROUND The Ampa-9 HP Compressor Project will install 2 new HP compressor trains on the AMCP facility,. This project is key for production levels to be sustained and enables future gas opportunities to be developed,. AMPA-09 HP COMPRESSOR (Brunei) KimFlex Slings,and Shackles ITEMS •1 x KimFlex Sling, 304mm dia, x 11.96 mtr length, MBL 3060 MT •2 x KimFlex Slings, 304mm dia, x 11.17 mtr length, MBL 3060 MT •1 x KimFlex Sling, 304mm dia, x 10.46 mtr length, MBL 3060 MT •4 x KimFlex Slings, 284mm dia, x 12.96 mtr length, MBL 2592 MT •4 x KimFlex Slings, 284mm dia, x 11.65 mtr length, MBL 2592 MT •4 x Crosby G-2160 Wide Body Shackles, 700MT •10 x Crosby G-2160 Wide Body Shackles, 500MT 6 x Green Pin P6033 Wide Body Sling Shackles, 500MT All manufactured and tested by KTL Offshore in Singapore. Witnessed and certified by ABS.
Documentos relacionados
CONSTRUCTION OF S116 JACK-UP (Caspian Sea
PROJECT TITLE Construction of the S116 Jack-Up for EDC DATE January 2012. BACKGROUND A new jack-up drilling rig is being constructed by EDC to be used in the Caspian Sea. It is to be a high-spec de...
Leia mais