Olympic Mobility Plan:
BRAZIL TRANSPORT CHALLENGES
Viajeoplus, March, 2013
SMTR
Agenda
A | High Performance Transport Ring
B | Legacy Plan
C | RIO2016 Characteristics
D | Competition Zones
THE TRANSPORT CONCEPT: HIGH PERFORMANCE RING
2008 TRANSPORT NETWORK
N
Zone
Venues
International
Airport
Deodoro
Downtown
Domestic
Airport
Maracanã
Copacabana
Metro System
Rail System
Ferry Boat
0
2
4
Km
6
Barra
9.7 MILLION DAILY TRIPS THAT ACCOUNT FOR MORE THAN THE 75% OF THE TOTAL TRIPS.
= RAIL NETWORK OF FIVE SUBURBAN RAIL LINES (225 KM, 89 STATIONS) + THE TWO METRO LINES (37 KM, 33 STATIONS)
+ THE DENSE, HIGH FREQUENCY BUS SYSTEM OF 1,450 ROUTES + THE FERRY SERVICES (THREE LINES)
THE TRANSPORT CONCEPT: HIGH PERFORMANCE RING
BID TRANSPORT NETWORK
N
Zone
Venues
International
Airport
Deodoro
Downtown
Domestic
Airport
Maracanã
BRT
Metro System
Rail System
Copacabana
Ferry Boat
New Road Infrastructure
0
2
4
Km
6
Barra
UPGRADED PROGRAM OF SUBURBAN RAILWAYS
EXTENSION OF EXISTING METRO LINE 1
THE DEPLOYMENT OF THREE HIGH CAPACITY BUS RAPID TRANSIT (BRT) SYSTEMS (CORRIDOR T5, BARRA-SOUTH ZONE
AND LINK C), :
THE TRANSPORT CONCEPT: HIGH PERFORMANCE RING
2016 TRANSPORT NETWORK
N
Zone
Venues
International
Airport
Deodoro
Downtown
Domestic
Airport
Maracanã
BRT
Metro System
Rail System
Copacabana
Ferry Boat
New Road Infrastructure
0
2
4
Km
6
Barra
PORT AREA: CHANGE IN THE LOCATION OF SOME VENUES + PORT LRT NETWORK
THE NEW METRO LINE 4 AS AN EXTENSION OF EXISTING METRO LINE 1 (+16km)
THE DEPLOYMENT OF FOUR HIGH CAPACITY BUS RAPID TRANSIT (BRT) SYSTEMS: TRANSCARIOCA, (EX-T5) WITH
CONNECTION TO THE INTERNATIONAL AIRPORT, TRANSOLÍMPICA, (EX-LINK C), TRANSOESTE AND TRANSBRASIL (150km)
Agenda
A | High Performance Transport Ring
B | Legacy Plan
C | RIO2016 Characteristics
D | Competition Zones
LEGACY PLAN
2016 NEW URBAN INFRASTRUCTURE
LEGACY PLAN
2016 NEW URBAN INFRASTRUCTURE
CONSTRUCTIONS OF 20 NEW VENUES
(COMPETITION SITES)
10 SIMULTANEOUS WORKS IN PROGRESS
(PORTO MARAVILHA, TRANSOLÍMPICA, ETC.)
45 TEST EVENTS FROM 2015 TO 2016
CITY EVENTS NON RELATED TO GAMES
(CARNIVAL, ROCK IN RIO, RIO450, ETC).
INCREASE OF HOTEL BEDS
(FROM 20 TH TO 37 TH)
DELIVER OF SPECIAL CARGO
Agenda
A | High Performance Transport Ring
B | Legacy Plan
C | RIO2016 Characteristics
D | Competition Zones
RIO2016 CHARACTERISTICS
OLYMPIC GAMES
204
Delegations
with autorities
11.000
athlets
6.500
Technical
officials
3.200
115
referee
City
venues
270 27.000
41
horses journalists
17
Continuos
operational days
sports
33
Competition
venues
44
suport
venue
143.000
10
workforce
Training
venues
28
Non
competition
venues
RIO2016 CHARACTERISTICS
PARALYMPIC GAMES
176
Delegations
with autorities
4.300
athlets
2.600
Technical
officials
1.300
87
referee
City
venues
80 10.000
30
horses journalists
13
Continuos
operational days
guide
dogs
82.000
workforce
22
Competition
venues
39
suport
venue
6
Training
venues
21
Non
competition
venues
RIO2016 CHARACTERISTICS
CALENDAR
Pre
Opening of
Olympic
Village
Opening of
Olympic
Village
Torch
Relay
Olympic
Opening
Ceremony
Olympic
Closing
Ceremony
Olympic
Village
Closing
Opening of
Paralympic
Village
Paralympic
Opening
Ceremony
Paralympic
Closing
Ceremony
Paralympic
Village
Closing
RIO2016 CHARACTERISTICS
COMPETITION VENUES
09 Venues
05 Venues
Youth Arena / Deodoro Aquatics Centre /
Olympic Equestrian Centre / Olympic Hockey Centre /
Olympic Shooting Centre / Deodoro Stadium / Olympic BMX Centre /
Whitewater Stadium / Mountain Bike Track
Olympic Stadium
Maracanã
Maracanãzinho
Júlio Delamare Aquatic Center
Sambódromo
DEODORO
MARACANÃ
17 COMPETITION DAYS
685 TOTAL EVENTS
40 EVENTS POR DAY
BARRA
05 Venues
Olympic Park / Rio Centro
Athletes’ Village / Athletes’ Park /
Golf Course/Road Events
COPACABANA
04 Venues
Beach Volleyball Arena
Lagoa Stadium
Fort Copacabana
Marina da Glória
RIO2016 CHARACTERISTICS
ROAD EVENT
~10 days
At least one road event
RIO2016 CHARACTERISTICS
Schedule linked to capacity and place of the venues
Daily Demand of Olympic Expectators
Agenda
A | High Performance Transport Ring
B | Legacy Plan
C | RIO2016 Characteristics
D | Competition Zones
BARRA ZONE
TRANSPORT NETWORK
N
Zone
Venues
International
Airport
Downtown
BRT
Metro System
Rail System
Ferry Boat
New Road Infrastructure
0
2
4
6
Km
BRT TRANSOESTE AND SPECIAL SERVICES
BRT TRANSCARIOCA AND SPECIAL SERVICES
BRT TRANSOLIMPICA
Barra
Domestic
Airport
BARRA ZONE
BARRA VENUES
BARRA ZONE
SPECTATOR DEMAND
DEODORO ZONE
TRANSPORT NETWORK
N
Zone
Venues
International
Airport
Deodoro
Domestic
Airport
BRT
Metro System
Rail System
Ferry Boat
New Road Infrastructure
0
2
4
6
Km
BRT TRANSOLIMPICO
TRAIN
Barra
DEODORO ZONE
DEODORO VENUES
DEODORO ZONE
SPECTATOR DEMAND
MARACANA ZONE
TRANSPORT NETWORK
N
Zone
Venues
International
Airport
Downtown
Maracanã
BRT
Metro System
Rail System
Ferry Boat
New Road Infrastructure
0
2
4
Km
METRO
TRAIN
6
Domestic
Airport
MARACANA ZONE
MARACANA VENUES
MARACANA ZONE
SPECTATOR DEMAND
THE TRANSPORT CONCEPT: HIGH PERFORMANCE RING
2016 TRANSPORT NETWORK
N
Zone
Venues
International
Airport
Downtown
BRT
Metro System
Rail System
Copacabana
Ferry Boat
New Road Infrastructure
0
2
4
Km
METRO
Domestic
Airport
6
Barra
MARACANA ZONE
COPACABANA VENUES
COPACABANA ZONE
SPECTATOR DEMAND
CONCLUSIONS AND FINAL COMMENTS
• Great legacy in good public transport
• Necessary additional strategies on TDM
- Public Administration holidays
- Rolling shift patterns
- freight delivery restrictions in terms of time and area