Olympic Mobility Plan
Transcrição
Olympic Mobility Plan
Olympic Mobility Plan: BRAZIL TRANSPORT CHALLENGES Viajeoplus, March, 2013 SMTR Agenda A | High Performance Transport Ring B | Legacy Plan C | RIO2016 Characteristics D | Competition Zones THE TRANSPORT CONCEPT: HIGH PERFORMANCE RING 2008 TRANSPORT NETWORK N Zone Venues International Airport Deodoro Downtown Domestic Airport Maracanã Copacabana Metro System Rail System Ferry Boat 0 2 4 Km 6 Barra 9.7 MILLION DAILY TRIPS THAT ACCOUNT FOR MORE THAN THE 75% OF THE TOTAL TRIPS. = RAIL NETWORK OF FIVE SUBURBAN RAIL LINES (225 KM, 89 STATIONS) + THE TWO METRO LINES (37 KM, 33 STATIONS) + THE DENSE, HIGH FREQUENCY BUS SYSTEM OF 1,450 ROUTES + THE FERRY SERVICES (THREE LINES) THE TRANSPORT CONCEPT: HIGH PERFORMANCE RING BID TRANSPORT NETWORK N Zone Venues International Airport Deodoro Downtown Domestic Airport Maracanã BRT Metro System Rail System Copacabana Ferry Boat New Road Infrastructure 0 2 4 Km 6 Barra UPGRADED PROGRAM OF SUBURBAN RAILWAYS EXTENSION OF EXISTING METRO LINE 1 THE DEPLOYMENT OF THREE HIGH CAPACITY BUS RAPID TRANSIT (BRT) SYSTEMS (CORRIDOR T5, BARRA-SOUTH ZONE AND LINK C), : THE TRANSPORT CONCEPT: HIGH PERFORMANCE RING 2016 TRANSPORT NETWORK N Zone Venues International Airport Deodoro Downtown Domestic Airport Maracanã BRT Metro System Rail System Copacabana Ferry Boat New Road Infrastructure 0 2 4 Km 6 Barra PORT AREA: CHANGE IN THE LOCATION OF SOME VENUES + PORT LRT NETWORK THE NEW METRO LINE 4 AS AN EXTENSION OF EXISTING METRO LINE 1 (+16km) THE DEPLOYMENT OF FOUR HIGH CAPACITY BUS RAPID TRANSIT (BRT) SYSTEMS: TRANSCARIOCA, (EX-T5) WITH CONNECTION TO THE INTERNATIONAL AIRPORT, TRANSOLÍMPICA, (EX-LINK C), TRANSOESTE AND TRANSBRASIL (150km) Agenda A | High Performance Transport Ring B | Legacy Plan C | RIO2016 Characteristics D | Competition Zones LEGACY PLAN 2016 NEW URBAN INFRASTRUCTURE LEGACY PLAN 2016 NEW URBAN INFRASTRUCTURE CONSTRUCTIONS OF 20 NEW VENUES (COMPETITION SITES) 10 SIMULTANEOUS WORKS IN PROGRESS (PORTO MARAVILHA, TRANSOLÍMPICA, ETC.) 45 TEST EVENTS FROM 2015 TO 2016 CITY EVENTS NON RELATED TO GAMES (CARNIVAL, ROCK IN RIO, RIO450, ETC). INCREASE OF HOTEL BEDS (FROM 20 TH TO 37 TH) DELIVER OF SPECIAL CARGO Agenda A | High Performance Transport Ring B | Legacy Plan C | RIO2016 Characteristics D | Competition Zones RIO2016 CHARACTERISTICS OLYMPIC GAMES 204 Delegations with autorities 11.000 athlets 6.500 Technical officials 3.200 115 referee City venues 270 27.000 41 horses journalists 17 Continuos operational days sports 33 Competition venues 44 suport venue 143.000 10 workforce Training venues 28 Non competition venues RIO2016 CHARACTERISTICS PARALYMPIC GAMES 176 Delegations with autorities 4.300 athlets 2.600 Technical officials 1.300 87 referee City venues 80 10.000 30 horses journalists 13 Continuos operational days guide dogs 82.000 workforce 22 Competition venues 39 suport venue 6 Training venues 21 Non competition venues RIO2016 CHARACTERISTICS CALENDAR Pre Opening of Olympic Village Opening of Olympic Village Torch Relay Olympic Opening Ceremony Olympic Closing Ceremony Olympic Village Closing Opening of Paralympic Village Paralympic Opening Ceremony Paralympic Closing Ceremony Paralympic Village Closing RIO2016 CHARACTERISTICS COMPETITION VENUES 09 Venues 05 Venues Youth Arena / Deodoro Aquatics Centre / Olympic Equestrian Centre / Olympic Hockey Centre / Olympic Shooting Centre / Deodoro Stadium / Olympic BMX Centre / Whitewater Stadium / Mountain Bike Track Olympic Stadium Maracanã Maracanãzinho Júlio Delamare Aquatic Center Sambódromo DEODORO MARACANÃ 17 COMPETITION DAYS 685 TOTAL EVENTS 40 EVENTS POR DAY BARRA 05 Venues Olympic Park / Rio Centro Athletes’ Village / Athletes’ Park / Golf Course/Road Events COPACABANA 04 Venues Beach Volleyball Arena Lagoa Stadium Fort Copacabana Marina da Glória RIO2016 CHARACTERISTICS ROAD EVENT ~10 days At least one road event RIO2016 CHARACTERISTICS Schedule linked to capacity and place of the venues Daily Demand of Olympic Expectators Agenda A | High Performance Transport Ring B | Legacy Plan C | RIO2016 Characteristics D | Competition Zones BARRA ZONE TRANSPORT NETWORK N Zone Venues International Airport Downtown BRT Metro System Rail System Ferry Boat New Road Infrastructure 0 2 4 6 Km BRT TRANSOESTE AND SPECIAL SERVICES BRT TRANSCARIOCA AND SPECIAL SERVICES BRT TRANSOLIMPICA Barra Domestic Airport BARRA ZONE BARRA VENUES BARRA ZONE SPECTATOR DEMAND DEODORO ZONE TRANSPORT NETWORK N Zone Venues International Airport Deodoro Domestic Airport BRT Metro System Rail System Ferry Boat New Road Infrastructure 0 2 4 6 Km BRT TRANSOLIMPICO TRAIN Barra DEODORO ZONE DEODORO VENUES DEODORO ZONE SPECTATOR DEMAND MARACANA ZONE TRANSPORT NETWORK N Zone Venues International Airport Downtown Maracanã BRT Metro System Rail System Ferry Boat New Road Infrastructure 0 2 4 Km METRO TRAIN 6 Domestic Airport MARACANA ZONE MARACANA VENUES MARACANA ZONE SPECTATOR DEMAND THE TRANSPORT CONCEPT: HIGH PERFORMANCE RING 2016 TRANSPORT NETWORK N Zone Venues International Airport Downtown BRT Metro System Rail System Copacabana Ferry Boat New Road Infrastructure 0 2 4 Km METRO Domestic Airport 6 Barra MARACANA ZONE COPACABANA VENUES COPACABANA ZONE SPECTATOR DEMAND CONCLUSIONS AND FINAL COMMENTS • Great legacy in good public transport • Necessary additional strategies on TDM - Public Administration holidays - Rolling shift patterns - freight delivery restrictions in terms of time and area - COMMUNICATION THANK YOU SIMONE COSTA [email protected] SECRETARIA DE TRANSPORTE PREFEITURA DA CIDADE DO RIO DE JANEIRO