16th Disbursement Request - MCA-CV
Transcrição
16th Disbursement Request - MCA-CV
16th Disbursement Request Compact Country: Cape Verde Date: June 10, 2009 Millennium Challenge Account – Cabo Verde CONSELHO COORDENADOR INDEX DOCUMENTS Page 4 MCA-CV Certificate 8 a) Attachment A – Resolution: A. Disbursement request 11 B. Financial plan (Detailed Financial plan) 14 C. Procurement Performance Report 17 D. Narrative Report 18 E. Indicator Tracking Table 27 F. Conditions precedent report 33 G. Quarterly Financial Report 46 H. Procurement Plan 51 I. Reviewed M&E 53 b) Attachment B - List of supplemental 54 agreements c) Attachment C - List of each permit 55 a) Attachment D – Report of the execution of the national budget expenditures 65 b) Attachment E – Annual Detailed Financial Plan 133 c) Attachment F – Evidence of Insurance 167 Deferral Letter 174 Fiscal Agent Certificate 177 Estamos a construir o futuro We are building the future Nu sta construi futuru Millennium Challenge Account – Cabo Verde CONSELHO COORDENADOR 179 Account Statement Estamos a construir o futuro We are building the future Nu sta construi futuru Millennium Challenge Account – Cabo Verde CONSELHO COORDENADOR MCA-CAPE VERDE CERTIFICATE Reference is hereby made to that certain Disbursement Agreement by and among the Millennium Challenge Corporation (“MCC”), the Ministry of Finance and Planning, acting on behalf of the Government of the Republic of Cape Verde (the “Government”), and MCA-Cape Verde dated as of October 17, 2005 (the “Disbursement Agreement”). Reference is further made to that certain Millennium Challenge Compact by and between the United States of America, acting through MCC, and the Government signed in Praia, Cape Verde on July 4, 2005 (the “Compact”). All capitalized terms used herein shall have the meanings given such terms in the Disbursement Agreement or the Compact, as applicable. We, the undersigned, as the Chairman of the Steering Committee of MCA-Cape Verde and as the Managing Director of MCA-Cape Verde, hereby certify pursuant to Section 3.3(b) of the Disbursement Agreement, in connection with the MCC Disbursement Request dated the date hereof (the “MCC Disbursement Request”), as follows: 1. Attached hereto as Attachment A is a true, correct and complete copy of the resolution duly adopted by the Steering Committee of MCA-Cape Verde authorizing the execution and delivery of the MCC Disbursement Request to MCC, together with the following documents which are required under the Disbursement Agreement and have also been approved by such Steering Committee in connection with the MCC Disbursement Request: a. b. c. d. e. f. g. h. i. Disbursement Request, Financial Plan (Detailed Financial plan), Procurement Performance Report, Narrative Report, Indicator Tracking Table, Conditions Precedent Report, Quarterly Financial Report, Procurement Plan, and M&E Plan. 2. (A) All of the representations made by MCA-Cape Verde in Section 2.2 of the Disbursement Agreement are true, correct and complete in all material respects as though made on the date of the MCC Disbursement Request and (B) no material default has occurred and is continuing (i) under the Compact Documents or the Supplemental Agreements to which it is a party or (ii) to the knowledge of the MCACape Verde; 3. The expenditure for each of the items included in the MCC Disbursement Request is provided for in the Financial Plan (as modified from time to time pursuant to the Estamos a construir o futuro We are building the future Nu sta construi futuru Millennium Challenge Account – Cabo Verde CONSELHO COORDENADOR Governing Documents and delivered to MCC) and uncommitted funds exist in the balance of the Financial Plan for each such expenditure; 4. Attached hereto as Attachment B is a true, correct and complete list of each Supplemental Agreement, including all amendments thereto and including relevant Steering Committee resolutions authorizing the execution of such Supplemental Agreements, to which the Government, any Government Affiliate or MCA-Cape Verde has become a party since the Entry into Force and which have not been previously provided to MCC; 5. Attached hereto as Attachment C is a true, correct and complete list of each Permit necessary in connection with the performance by MCA-Cape Verde of its obligations under the Disbursement Agreement and under any Compact Document during the Disbursement Period covered by the MCC Disbursement Request, and each such Permit is validly issued and in full force and effect; 6. Attached hereto as Attachment D is a report, in accordance with the methodology agreed upon by the Parties, of the execution of the national budget expenditures of all resources, including the annual budget, extra-budgetary or off-budget funds, and state-owned enterprises that conduct activities of a public purpose; 7. Attached hereto as Attachment E is a an annual Detailed Financial Plan for the Program and each Project for the upcoming year, including estimated quarterly drawdown rates, together with a description and justification, by each activity, of what will be accomplished with the MCC Funding being requested during such annual; 8. Attached hereto as Attachment F is evidence that insurance required under Section 3.9 of the Compact (effective as of the entry into force of the Compact) or under Section 3(d)(ii)(4) of Annex I of the Compact (effective as of the date of formation of MCA-Cape Verde or such other date as the Parties may otherwise agree) has been obtained and maintained. 9. The documents attached to this MCA-Cape Verde Certificate and all Supplemental Agreements previously provided to MCC have not been modified, rescinded or amended and are in full force and effect; 10. Activities to be funded with the MCC Funding being requested by the MCC Disbursement Request will not violate any applicable law, regulation or obligation of MCA-Cape Verde, including Section 2.3 of the Compact, and, as of the date of the MCC Disbursement Request, the MCC Funding, Accrued Interest or Program Assets have been or will be strictly used or applied in accordance with the Disbursement Agreement, the Compact and all Supplemental Agreements; Estamos a construir o futuro We are building the future Nu sta construi futuru Millennium Challenge Account – Cabo Verde CONSELHO COORDENADOR 11. There are no liens or encumbrances of any kind on any material Program Asset or any Permitted Account; 12. MCA-Cape Verde has maintained since the last MCC Disbursement a standard of 30 days to pay valid invoices; 13. Procurement actions have been posted on the MCA-Cape Verde Website for the previous Disbursement Period in accordance with the Procurement Guidelines; and 14. All reports (including financial reports) and other documents have been posted on the MCA-Cape Verde Website as required by Annex I of the Compact. 15. There has been no material negative finding in any Fiscal Agent or Audit reports delivered pursuant to Sections 3.4 or 3.5 of the Disbursement Agreement or otherwise delivered to MCC; 16. On and as of the date hereof, MCA-Cape Verde has not been notified by MCC that there has been unsatisfactory progress on the Work Plans for any relevant Projects or Project Activities related to the MCC Disbursement requested hereby, including actual compliance with any additional conditions precedent to such disbursement set forth therein and substantial compliance with the requirements of such Work Plans, including any applicable reporting requirements for the relevant Disbursement Period; 17. On and as of the date hereof, MCA-Cape Verde has not been notified by MCC that there has been unsatisfactory progress for the revision of the M&E Plan for the Program, relevant Project or Project Activity, including actual compliance with the targets set forth in the M&E Plan and substantial compliance with the other requirements of such M&E Plan, including any applicable reporting requirements for the relevant Disbursement Period; 18. On and as of the date hereof, MCA-Cape Verde has not been notified by MCC that there has been unsatisfactory compliance with the Procurement Plan, including any applicable reporting requirements under the Procurement Agreement for the relevant Disbursement Period; 19. On and as of the date hereof, MCA-Cape Verde has not been notified by MCC that there has been unsatisfactory compliance with the Audit Plan, including any applicable reporting and auditing requirements under the Audit Agreement for the relevant Disbursement Period; 20. Notwithstanding items set forth on the Conditions Precedent Report, on and as of the date hereof, MCA-Cape Verde has not been notified by MCC that (A) any necessary preceding steps in the sequence for any Project Activity as provided in Schedule 1 of the Disbursement Agreement have not been satisfactorily completed for Estamos a construir o futuro We are building the future Nu sta construi futuru Millennium Challenge Account – Cabo Verde CONSELHO COORDENADOR ATTACHMENT A STEERING COMMITTEE RESOLUTION Estamos a construir o futuro We are building the future Nu sta construi futuru Millennium Challenge Account – Cabo Verde CONSELHO COORDENADOR RESOLUTION NR 02/CC/09 The following resolutions were adopted by the Steering Committee of MCA-Cape Verde, established pursuant to Resolution 24/2005 (“MCA-Cape Verde”), at a meeting of the Steering Committee held in Praia, Cape Verde on June 8, 2009, notice of which meeting was duly given in accordance with the applicable laws of Cape Verde and MCA-Cape Verde. WHEREAS, MCA-Cape Verde was founded by the Government of Cape Verde (the “Government”) to supervise the management and implementation of that certain Millennium Challenge Compact between the Government and the United States of America, acting through the Millennium Challenge Corporation (“MCC”), dated July 4, 2005 (the “Compact”). WHEREAS, the Steering Committee deems it necessary and in the best interests of MCA-Cape Verde in order to implement the Compact to adopt the certain documents, plans and agreements, and take the following actions described below. NOW, THEREFORE, BE IT: RESOLVED THAT, the Steering Committee hereby appoints as the secretary for the present Board meeting the Managing Director of MCA-Cape Verde (MD) (in accordance with the Bylaws). RESOLVED FURTHER, the Steering Committee hereby approves and ratifies the minutes from, and the actions taken at, the Steering Committee meeting held on March 9th, 2009. RESOLVED FURTHER, the Steering Committee hereby approves the 16th quarter MCC Disbursement Request and all attachments thereto (attached hereto as Attachment A), approves any non-material changes that the MD shall deem necessary and appropriate to induce its execution, and authorizes the MD to execute such document on behalf of MCA-Cape Verde. RESOLVED FURTHER, the Steering Committee hereby approves and adopts the prospective components of the Financial Plan for the Program and each Project (attached hereto as Attachment B), approves any non-material changes that the MD shall deem necessary and appropriate, and approves and ratifies the components of the Financial Plan relating to year four, quarter fourteen. RESOLVED FURTHER, the Steering Committee hereby approves the Procurement Performance Report for quarter 15 (attached hereto as Attachment C) and approves any nonmaterial changes that the MD shall deem necessary and appropriate. Estamos a construir o futuro We are building the future Nu sta construi futuru Millennium Challenge Account – Cabo Verde CONSELHO COORDENADOR Attachment A Disbursement Request Estamos a construir o futuro We are building the future Nu sta construi futuru DISBURSEMENT REQUEST FORM OF COMPACT DISBURSEMENT REQUEST Country Projects Cape Verde Watershed Management and Agricultural Support; Infrastructure; Private Sector; Monitoring and Evaluation; Program Administration and Control Compact Date/ Entry Into Force Date July 4, 2005 / October 17, 2005 Compact Number COM04CPV06001 Accountable Entity MCA - Cape Verde Fiscal Agent General Directorate of the Treasury, on behalf of the Ministry of Finance Request Date June 10, 2009 Disbursement Period Beginning Date July 1, 2009 Disbursement Period Ending Date September 30, 2009 Disbursement Number 16 Currency (Expressed in USD) US Dollars Exchange Rate used to calculate U.S. Dollar equivalent of any local currency balance for purposes of this MCC Disbursement Request A. Disbursement Request: The undersigned hereby requests the Millennium Challenge Corporation to disburse funds under the Compact dated as of July 4, 2005 and the Disbursement Agreement dated as of October 17, 2005 between MCC and the Government of Cape Verde as follows: 1. Forecasted Cash Disbursement Requirements (from DFP Cash Column) $ 13,267,511 2. Interest to be Returned to the USG for Next Period (Interest Sum, Line 7) $ - $ - 3. Working Capital (FOR MCC USE ONLY) 4. Cash Balance at the End of the Current Period (Cash Req, Line 7) 5. Disbursement Request Amount (Lines 1+2-4) 6. Amount Requested in Words $ 13,267,511 Thirteen million, two hundred sixty seven thousand and five hundred eleven dollars C. Compliance: the undersigned confirms that the MCC Disbursement requested hereby is in accordance with the terms and conditions set forth in the Compact, the Governance and Disbursement Agreement and each Compact Document (as defined in the Governance and Disbursement Agreement), including the limitations on the use or treatment of MCC Funding set out in Section 2.3 of the Compact D. Authorization: the undersigned acknowledges that funds disbursed in accordance with this request will be either made (i) directly to third-party vendors for goods, works and services received by the accountable entity upon presentation of valid invoices utilizing MCC's Common Payment System, (ii) to the Permitted Account, or (iii) to the Petty Cash Account. E. Certificates: Attached hereto are the certificates required under Section 3.3 and 3.4 of the Governance and Disbursement Agreement. F. Definitions: Capitalized terms used herein shall have the meanings assigned to such terms in the Compact by and between the Government of Cape Verde and the United States, acting through the Millennium Challenge Corporation, dated July 4, 2005 and entered into force on October 17, 2005. Millennium Challenge Account – Cabo Verde CONSELHO COORDENADOR Attachment B Detailed Financial Plan Estamos a construir o futuro We are building the future Nu sta construi futuru Detailed Financial Plan - Commitments Country: Accountable Entity: Compact Number: Date Submitted: Forecasted Commitments for -> Date/Month/Quarter -> Column Number 1. Watershed Management and Agricultural Support 1.1 Watershed Management 1.2 Agribusiness Development 1.3 Credit CAPE-VERDE MCA-CV COM04CPV06001 June 10, 2009 Cumulative Current Period Actual Cumulative Commitments at Beginning of Current Period Projected Commitments during Current Period Mar 31, 2009 Column 1 Next Period Apr 1, 2009 Jun 30, 2009 Column 2 Projections for Future Quarters Compact Quarter 16 Jul '09 Aug '09 Sep '09 Column 3 Column 4 Column 5 TOTAL Total Compact Quarter16 Compact Quarter 17 Compact Quarter 18 Compact Quarter 19 Compact Quarter 20 Jul '09 Sep'09 Column 6 Oct '09 Dec '09 Column 7 Jan '10 Mar '10 Column 8 Apr '10 Jun '10 Column 9 Jul '10 Sep '10 Column 10 TOTAL As Per Current Commitments As Approved Multi-Year Currently Forecasted Financial Plan (Should match with Schedule B) Column N+5 Projections vs. Approved Plan Under / (Over) Budget Difference 6,248,489 3,100,540 450,000 (67,920) 869,005 0 0 0 0 0 186,667 0 0 0 0 0 186,667 0 0 0 0 0 0 0 0 0 0 0 0 0 6,180,569 4,156,211 450,000 6,730,258 3,820,872 450,000 Column N+6 214,349 549,689 (335,339) 0 9,799,029 801,085 0 186,667 0 186,667 0 0 0 0 10,786,781 11,001,130 214,349 2. Infrastructure 2.1 Port 2.2 Roads and Bridges 49,312,645 24,384,174 983,834 3,014,386 550,000 200,000 0 200,000 0 0 550,000 400,000 4,157,634 357,000 0 0 0 0 0 0 55,004,112 28,155,560 55,004,114 28,156,094 1 534 TOTAL - Infrastructure Project TOTAL - Watershed Management and Agricultural Support Project Column N+4 Variance 73,696,819 3,998,220 750,000 200,000 0 950,000 4,514,634 0 0 0 83,159,673 83,160,208 535 3. Private Sector Development 3.1 Partnership to Mobilize Investment 3.2 Financial Sector Reform 296,500 1,231,113 0 0 0 0 0 0 0 125,000 0 125,000 0 125,110 0 0 0 0 250,000 0 546,500 1,481,223 600,000 1,481,223 53,500 (0) TOTAL - Private Sector Development Project 1,527,613 0 0 0 125,000 125,000 125,110 0 0 250,000 2,027,723 2,081,223 53,500 4. M&E M&E TOTAL - M&E 1,917,722 1,917,722 55,993 55,993 32,320 32,320 550,000 550,000 10,974 10,974 593,294 593,294 250,000 250,000 69,200 69,200 0 0 193,532 193,532 3,079,741 3,079,741 3,619,668 3,619,668 539,927 539,927 5. Program Administration and Audits 5.1 Program Administration 5.2 Fiscal and Procurement Agents 5.3 Enhanced Transparency Initiative 5.4 Audits 4,914,550 1,287,830 483,401 158,905 403,831 30,667 0 0 137,000 25,000 0 0 137,000 0 269,235 31,917 137,000 0 0 0 411,000 25,000 269,235 31,917 412,527 90,000 0 0 433,153 0 0 31,917 399,443 0 0 0 704,776 0 0 63,834 7,679,280 1,433,496 752,636 286,574 7,687,765 1,443,257 752,636 332,601 8,485 9,761 0 46,027 TOTAL - Program Admin 6,844,685 434,498 162,000 438,152 137,000 737,152 502,527 465,070 399,443 768,610 10,151,986 10,216,259 64,273 93,785,869 5,289,795 944,320 1,374,819 272,974 2,592,113 5,392,271 534,270 399,443 1,212,142 109,205,903 110,078,488 872,585 GRAND TOTAL Detailed Financial Plan - Cash Country: CAPE-VERDE Accountable Entity: MCA-CV Compact Number: COM04CPV06001 Date Submitted: June 10, 2009 Cumulative Forecasted Cash for -> Date/Month/Quarter -> Column Number 1. Watershed Management and Agricultural Support 1.1 Watershed Management 1.2 Agribusiness Development 1.3 Credit Current Period Next Period Projected Cumulative Actual Disbursements for Disbursements at Current Period Beginning of Current (Shcdule C, Col 4a + Period (Schedule C, Col 3) Col 4b) Mar 31, 2009 Column 1 Apr 1, 2009 Jun 30, 2009 Column 2 Projections for Future Quarters Compact Quarter 16 Jul '09 Aug '09 Sep '09 Column 3 Column 4 Column 5 Total Compact Quarter16 Compact Quarter 17 Compact Quarter 18 Compact Quarter 19 Compact Quarter 20 Jul '09 Sep'09 Column 6 Oct '09 Dec '09 Column 7 Jan '10 Mar '10 Column 8 Apr '10 Jun '10 Column 9 Jul '10 Sep '10 Column 10 TOTAL TOTAL Variance Cash Disbursements As Currently Forecasted As Per Current Approved Multi-Year Financial Plan (Should match with Schedule B) Projections vs. Approved Plan Under / (Over) Budget Difference Column N+4 Column N+5 3,628,535 1,607,171 200,000 1,081,535 89,926 250,000 765,391 166,124 0 328,020 255,125 0 119,333 230,100 0 1,212,744 651,349 0 0 257,756 851,942 0 0 255,125 0 0 500,500 0 0 200,200 0 6,180,570 4,156,212 450,000 6,730,258 3,820,872 450,000 Column N+6 214,348 549,688 (335,340) 0 5,435,706 1,421,461 931,515 583,145 349,433 1,864,092 1,109,698 255,125 500,500 200,200 10,786,782 11,001,130 214,348 2. Infrastructure 2.1 Port 2.2 Roads and Bridges 13,447,555 14,423,948 4,736,438 4,138,323 1,613,463 1,587,765 1,799,428 1,372,701 1,817,098 1,372,701 5,229,990 4,333,167 5,161,255 3,433,645 5,472,007 1,779,492 9,346,479 46,985 11,610,390 0 55,004,113 28,155,560 55,004,114 28,156,094 0 534 TOTAL - Infrastructure Project TOTAL - Watershed Management and Agricultural Support Project 27,871,503 8,874,761 3,201,229 3,172,129 3,189,799 9,563,157 8,594,899 7,251,500 9,393,464 11,610,390 83,159,674 83,160,208 534 3. Private Sector Development 3.1 Partnership to Mobilize Investment 3.2 Financial Sector Reform 74,125 687,829 103,775 109,284 0 0 0 108,500 0 0 0 108,500 0 358,610 74,125 108,500 44,475 108,500 250,000 0 546,500 1,481,223 600,000 1,481,223 53,500 0 TOTAL - Private Sector Development Project 761,954 213,059 0 108,500 0 108,500 358,610 182,625 152,975 250,000 2,027,723 2,081,223 53,500 4. M&E M&E TOTAL - M&E 1,297,698 1,297,698 77,936 77,936 68,093 68,093 182,316 182,316 298,022 298,022 523,379 1,046,759 540,000 540,000 306,013 306,013 123,362 123,362 211,352 211,352 3,079,741 3,079,741 3,619,668 3,619,668 539,927 539,927 5. Program Administration and Audits 5.1 Program Administration 5.2 Fiscal and Procurement Agents 5.3 Enhanced Transparency Initiative 5.4 Audits 4,914,550 876,673 367,482 110,898 403,831 67,775 98,333 22,473 137,000 46,545 8,793 12,767 137,000 89,779 0 6,383 137,000 70,046 26,924 12,767 411,000 206,370 35,716 31,917 412,527 228,679 107,694 25,534 433,153 54,000 107,694 19,150 399,443 0 35,716 12,767 704,776 0 0 63,834 7,679,280 1,433,496 752,636 286,573 7,687,765 1,443,257 752,636 332,601 8,485 9,761 0 46,028 TOTAL - Program Admin 6,269,602 592,412 205,105 233,162 246,736 685,003 774,434 613,998 447,926 768,610 10,151,986 10,216,259 64,273 41,636,463 11,179,629 4,405,941 4,279,252 4,083,990 13,267,511 11,377,640 8,609,261 10,618,228 13,040,552 109,205,904 110,078,488 872,584 GRAND TOTAL Millennium Challenge Account – Cabo Verde CONSELHO COORDENADOR Attachment C Procurement Performance Report - See file PPR June 09.xls Estamos a construir o futuro We are building the future Nu sta construi futuru Millennium Challenge Account – Cabo Verde CONSELHO COORDENADOR Attachment D Narrative Report Estamos a construir o futuro We are building the future Nu sta construi futuru Millennium Challenge Account Cape Verde Narrative Report Quarter 16 – July 1, 2009 to September 30, 2009 June 2, 2009 Quarter 16 ‐ Narrative Report A Current Quarter Commitments and Expenditures The previous quarter’s Disbursement Request forecasts the following: i. Commitments (Schedule D of the QFR): $ 4,826,434. ii. Cash Requirements (Schedule E of the QFR): $ 14,090,022. A.1 Watershed Management and Agricultural Services A.1.1 Soil and Water Conservation Infrastructures The small works continued to be implemented having the following completion rate: Year Mosteiros ‐ Fogo Paul ‐ Stº. Antao Faja ‐ S. Nicolau Nr lots Lots concluded Nr lots Lots concluded Nr lots Lots concluded Works 2007 7 7 10 10 4 4 Works 2008 12 10 10 10 9 5 WDS ‐ ‐ 13 7 ‐ ‐ Three contracts for small works in S.Nicolau were terminated during this reporting period, due non‐compliance with the contract’s provisions related to contractor incapacity in presentation of the documentation. The drilling works were completed and the water distribution systems in Paul were started. The drilling, equipping and pumping test on the 2nd well in Paul was completed by INERF. The provisional reception for the INERF contract works was carried out by the end of April month. The low level re‐disbursements are related mainly to i) three contract termination for small works in S.Nicolau ii) the delay in invoicing in six lots of Placar in S. Nicolau iii) reduced invoicing in four lots in Fogo. The targets for area under irrigation for 2009 in Paul will be met despite the delay in drilling. Due to delay in the execution of the small works in Fogo and S. Nicolau the targets for area under irrigation established for 2009 will not be achieved. A.1.2 Agribusiness Development Services Delay in the delivery of the final Market Study (62.562$50) coupled with delays in the delivery of the Crop Bulletins (150.150$00) by Agland delayed forecasted disbursements. A.1.3 Access to Credit The Disposition Plan was prepared and shared with all stakeholders the Master Loan Agreement between CECV and IMF´s was revised and shared with all stakeholders. A Master Loan Agreement between CECV and ASDIS was signed. In the field training by field Agland Development Service Inc. and Planet Finance continued. 2 of 8 Quarter 16 ‐ Narrative Report The final tranche of $250,000 will be disbursed in the 2nd half of June to CECV – an unplanned event for this quarter. A.2 Port A.2.1 Project Management Consultant The PMC (Consulgal, Bremenports, Inros Lackner) in this quarter has submitted the following reports: mobilization report (reviewed), 6th, 7th and 8th monthly supervision reports. A.2.2 Port of Praia Works Phase 1 The contractor (SOMAGUE/MSF) is carrying out the following activities: o Quay 2 – Following activities are in progress: pavement works, facilities network. All design documents were submitted and approved. o Connecting Road – earth works (excavation and reuse of selected materials for the road subgrade, rock excavation with use of explosives), marine fill, shore protection and drainage structures; o Cargo Village ‐ earth works (removal of top soil, excavation and reuse of selected materials in the embankment areas, rock excavation with use of explosives) and drainage structures; The contractor has started with HIV/AIDS awareness campaign. The final version of CEMP was accepted. The disbursements for the current Quarter will ne missed by $800,000, due mainly to the delays in concluding and approving V.O. 1 and V.O. 2 to cover cross section changes in the Access Road Temporary Protection and road axis realignment. A.3 Roads and Bridges A.3.1 Santiago Roads • Road 1, Órgãos – Pedra Badejo (10 km) All works have been finished by May 30. The take‐over certificate has been issued and the road was inaugurated on June 6th. • Road 2, Cruz Grande – Calhetona (13,4 km) Walls construction, excavation and embankments are finished. Rehabilitation and construction of culverts are ongoing and are expected to be finished by June 30. The Contractor has started to do the formation along the last 5 km of the road and will start in the placement of the base layer before June 30th. • Road 4, Assomada – Rincão (15,6 km) 14,6 km are paved. The drainage works have also been completed. Cobblestones are being placed in a road section of 1 Km, in Chã de Tanque. This activity will be completed by June 20th. Signaling and Pavement Marks are ongoing and shall be completed no later than June 30. This road is expected to be finished in June. • Others A Variation Order for Price Escalation, Pending Claims and Time Extension (until the 8th of January 2009) of the construction contract has been issued. Variation orders for additional works in road 1 as well for the Extension of the Supervision Contract are under preparation. 3 of 8 Quarter 16 ‐ Narrative Report A.3.2 Bridges of Santo Antão • Road Paul ‐ Eito (1 km) Works are now ongoing on the whole road. More than 90 % of the road has been completed. The connections of the road with the Bridge A of Paul are finished. The Connections with Bridge B will be done in July. • Bridge A The structure of this bridge has been finished in April. Protection walls made of cribs over the foundation are finished. Guardrails have been placed as also all electricity cables under the sidewalks. The bridge has been paved and opened to the traffic during the last week of May. Pavement of the sidewalks and painting are ongoing. This Bridge will be completely finished by June 15th. • Bridge B The Contractor has finished the entire structure works. Protection walls made of cribs over the foundation will start before June 30th. Painting has stated during the first week of June. This Bridge is expected to finish by August 30th. • Ribeira da Torre Bridge and Ribeira Grande The Contractor has finished the entire structure works. Protection walls made of cribs over the foundation as painting are finished. Guardrails have been placed as also all electricity cables under the sidewalks. These Bridges are expected to finish by July 30th. Others A Variation Order for Price Escalation, of the construction contract as well a Variation orders for the Extension of the Supervision Contract have been issued A.4 Private Sector Development A.4.1 Partnership to mobilize investment An IFC team conducted an exhaustive appraisal of the current credit and credit information sharing industries, during the week 27‐30 April 2009. Following the mission, the IFC submitted to MCA‐CV the report “Short recap of preliminary findings” and engaged local legal services to undertake the legal review. In June, IFC will submit a Strategy Report for reviewing and decision by the stakeholders about how to proceed with an overall recommendation as to the feasibility of setting up a credit bureau in Cape Verde. A.4.2 Financial Sector Reform Planet Finance assistance services, at this stage, comprise the following prioritized areas: (i) accounting and internal controls; (ii) loan products and credit methodology; (iii) improvement of MIS; (iv) governance;(v) Marketing e customer service and (vi) rural credit. On the Development of Government Securities sub‐activity As agreed upon, the Ministry of Finance has submitted for MCC´s review an updated draft proposal of the Action Plan (dated May 1st), which incorporates additional relevant elements requested by MCC upon the review of the first draft (of March 31st). A.5 Monitoring and Evaluation A.5.1 Implementing Entity Agreement with National Statistical Institute (INE) INE continued the Cool season survey and corrected some indicators from the warm season survey. The agri‐business survey is being implemented. However, INE did not invoice as scheduled leading to a reduction in payments of $100,000. 4 of 8 Quarter 16 ‐ Narrative Report A.5.2 Other sub‐activities The bid for the GIS information system as well as for the Data Quality review did not proceed as planned. Leading to a shortfall in commitments of $77,230 The M&E Management Information System is continuing to be developed by Synergy, but delays lead to a reduction in commitments of $70,000. The bid to a Port Evaluation specialist has been evaluated and the technical assistance is expected to start by my July. A.6 Program Administration A.6.1 Fiscal and Procurement Agent The E‐procurement MIS consultancy service by Timestamp stopped its work, given the unavailability of some software and hardware components for Oracle that would allow the implementation of the software and final tests with SIGOF. This reduced the re‐disbursements by $100,000 and delayed the work by 5/6 weeks. The “SIGOF improvement” consultancy continued as scheduled. The organization specialist bid was cancelled given that no suitable candidate was found, thus reducing the commitments by $25,000. On the SISP contract the system has been certified by VISA International, open the way to final tests with the SIGOF system. A.6.2 Enhanced Transparency Initiative The Mundiserviços technical assistance presented all their deliveries, namely the basis for the design of a training plan for the public servants, leading to the closure of the This contract will be closed in June. A.6.3 Audits The Audit for January to June 2008 has been approved by MCC’s OIG and the contract with PriceWaterhouseCoopers has been closed. The July to December 2008 audit has been performed by Ernst&Young and the draft report will be submitted to MCC. B Next Quarter Multi‐Year Financial Plan and Work Plan The bid prices for the construction of the Post Harvest Center in Santo Antão, are higher than the initial estimates, leading to a shortfall in the resources available in the agri‐business activity. This situation coupled with the fall of the US dollar against the Euro requires a budget change as follows: Project (Main) Activity (Sub) 1. Watershed Management Original Program MultiYear Financial Plan in the Compact Current Approved Multi-Year Financial Plan 1 2 10,848,630 11,001,130 Proposed Adjustments (Display all #'s as positive) Increase Decrease (+) (-) 3 4 336,000 336,000 Proposed Adjusted Multi-Year Financial Plan (2+3-4) 5 11,001,130 5 of 8 Quarter 16 ‐ Narrative Report and Agricultural Support 1.1 Watershed Management 1.2 Agribusiness Development 6,800,250 6,730,258 3,598,380 3,820,872 450,000 450,000 1.3 Credit C 336,000 336,000 6,394,258 4,156,872 450,000 Next Quarter Commitments and Expenditures The Disbursement Request for Quarter 16 sent to MCC for consideration forecasts the following: i. Commitments (from DFP ‐ Commitments): $ 2,592,113. ii. Cash Requirements (from DFP ‐ Cash): $ 13,267,511. C.1 WMAS C.1.1 Soil and Water Conservation Infrastructures The main commitment will be for the completion of water distribution systems in Paul and for the small works of 3 re‐contract lots in S. Nicolau in an amount of $ 300,000. It is expected that water distribution systems in Paul will be completed by July 2009. Also during the next reporting quarter, the small works 2008 in 2 lots ‐ Fogo and 1 lots – S. Nicolau will be concluded, as provided by the table below: Year Mosteiros ‐ Fogo Paul ‐ Stº. Antao Faja ‐ S. Nicolau Nr lots Lots concluded Nr lots Lots concluded Nr lots Lots concluded Works 2007 7 7 10 10 4 4 Works 2008 12 12 10 10 9 6 WDS ‐ ‐ 13 13 ‐ ‐ C.1.2 Agribusiness Development Services Delivery and approval of the following: Market Study, Farmers Identified and with Cost Estimate for drip irrigation system, Brochures with 3 core subjects, Training of Management for Post – Harvest Center, and Farmers trained. Start of the work of to build the Post Harvest Center in S.Antão. C.1.3 Access to Credit Expect to have master loan agreement between CECV and other MFI’s signed allowing the start of the lending process in S. Antão. C.2 Port C.2.1 Project Management Consultant The PMC main deliverables will be monthly reports (March, April and May) and respective invoices. 6 of 8 Quarter 16 ‐ Narrative Report C.2.2 Port of Praia Works Phase 1 The contractor will continue works in all 3 project components and he will submit monthly statements and invoices concerning the implementation of VO 1 and VO2, to cover Changes in the temporary protection works, quay to pavement foundation spot improvements and changes in the type of soil in the Cargo Village (more common soil and less rock) and cross section changes in the Access Road Temporary Protection and road axis realignment. C.3 Roads and Bridges C.3.1 Santiago Roads • Road 2, Cruz Grande – Calhetona (13,4 km) Pavement is scheduled to start in July. • Road 4, Assomada – Rincão (15,6 km) the Only activity will be plantation that has been rescheduled to start during the rainy season, after the first rain. C.3.2 Bridges of Santo Antão • Road Paul ‐ Eito (1 km) The Connections with Bridge B will be done in July. • Bridge B This Bridge is expected to finish by August 30th. • Ribeira da Torre Bridge and Ribeira Grande These Bridges are expected to finish by July 30th. C.4 Private Sector Development C.4.1 Partnership to mobilize investment During the month of July it is expected that IFC will promote an workshop on the concept of the Credit Bureau. Also, during this quarter all stakeholders will analyze the Strategy/Recommendations report provided by IFC, that will lead the way in the next steps of this activity. C.4.2 Financial Sector Reform Planet Finance progresses and will continue with the delivery of direct technical assistance and of general capacity building services to the eight beneficiaries and to the Federation of MFI´s and report on the results achieved to group 1 and 2 MFI’s. The software to MFI’s will acquired. It is expected that the activity of development of the primary market will start. C.5 Monitoring and Evaluation C.5.1 Implementing Entity Agreement with INE During this quarter INE will finalize the data collection of the cool season survey/agribusiness surveys and start the data entry/analysis process. To better track the results INE will start the mapping of the agricultural areas. C.5.2 M&E Management Information System Synergy will deploy the start solution and training will be provided to the power users and administrators of the software. The prototype will be implemented, at least in MCA‐CV and at two Ministries to be chosen. 7 of 8 Quarter 16 ‐ Narrative Report C.5.3 Other sub‐activities The development of the evaluation strategy for the Port project will start. Also, during this quarter the delayed procurement of consultancy services for i) the development of the GIS solution phase I and ii) Data Quality Review will be concluded. C.5.4 Fiscal and Procurement Agent Timestamp will continue its work for the Government E‐procurement MIS and the final customization and linkage with SIGOF. The “Sigof improvement” consultancy will be carried out and the Treasury specialist will finish its work. The Organization specialist will be hired start the works. It is expected that the contract with SISP will arrive at its end after the test to link the “Visa” payment system with SIGOF. C.5.5 Enhanced Transparency Initiative A consultancy firm will be hired to provide training to civil servants in procurement. C.5.6 Audits The final audit report for the period July to December 2008 will be approved by MCC’s OIG, leading to the last payment of the base period audit Contract with Ernst & Young. D Indicator Tracking Table Notes 8 of 8 Millennium Challenge Account – Cabo Verde CONSELHO COORDENADOR Attachment E Indicator Tracking table Estamos a construir o futuro We are building the future Nu sta construi futuru Indicator Tracking Table (ITT) Country: Accountable Entity Name: Compact Quarter for which Disbursement is Requested: Submission Date: Disbursement Period Start Date: Disbursement Period End Date: B E P r o Indicator j e A L LIncrease in Annual Income W aVolume of available water: All Watersheds (Paul, tFaja and Mosteiros) W a tVolume of available water; Paul W a tVolume of available water; Faja W a tVolume of available water; Mosteiros W aTons of solid material retained through soil tconservation infrastructure: All Watersheds (Paul, eFaja, and Mosteiros) W aTons of solid material retained through soil tconservation infrastructure; Paul W aTons of solid material retained through soil tconservation infrastructure; Faja W aTons of solid material retained through soil tconservation infrastructure; Mosteiros W aReservoirs constructed: All Watersheds (Paul, tFaja, and Mosteiros) W a tReservoirs constructed; Paul W a tReservoirs constructed; Faja W a tReservoirs constructed; Mosteiros F Cape Verde MCA - Cape Verde Quarter 16 G Indicator Classification Type Unit H I J K L M N O P Q Cumulative Past Performance through last completed Compact Year Last Quarter Current Quarter Performance for Current Compact Year Remaining Annual Targets End of Compact Target Q [1] to Q [13] (Oct05 - Dec08) Q [14] (Jan-Mar 09) Q [15] (Apr-Jun 09) Q[13] to Q[16] (Oct08 - Sep09) Y[5] (Oct09 - Sep10) Q1 to Q20 (Oct05-Sep10) Target Target Baseline Cumulative Targets D e Cumulative v Actuals i a Actuals Actuals Actuals as of (Date) Cumulative Actual for Compact Year Annual Target % Complete Towards Annual Target Millions of US Dollars Incremental 0 0 0 6.9 6.9 Cubic Meters (m3) Incremental 0 6,600 0 0 298,300 0 0% 322,600 627,500 Cubic Meters (m3) Incremental 0 6,600 0 0 285,300 0 0% 309,600 601,500 Cubic Meters (m3) Incremental 0 0 0 0 6,000 0 0% 6,000 12,000 Cubic Meters (m3) Incremental 0 0 0 0 7,000 0 0% 7,000 14,000 Tons Incremental 0 8,688 530 0 16,864 0 0% 0 25,552 Tons Incremental 0 3,995 288 0 7,755 0 0% 0 11,750 Tons Incremental 0 1,505 0 0 2,922 0 0% 0 4,427 Tons Incremental 0 3,187 242 0 6,187 0 0% 0 9,375 Number Incremental 0 11 9 4 17 5 29% 0 28 Number Incremental 0 8 9 4 5 5 100% 0 13 Number Incremental 0 2 0 0 6 0 0% 0 8 Number Incremental 0 1 0 0 6 0 0% 0 7 P r o j eW Indicator a tGovernment approves new water pricing policy W a tProductivity: Horticulture; Paul W a tProductivity: Horticulture; Faja W a tProductivity: Horticulture; Mosteiros W aValue-added for farms: All Watersheds (Paul, tFaja, and Mosteiros) W a tValue-added for farms; Paul W a tValue-added for farms; Faja W a tValue-added for farms; Mosteiros W aNumber of crop cycles: All Watersheds (Paul, tFaja, and Mosteiros) W a tNumber of crop cycles; Paul W a tNumber of crop cycles; Faja W a tNumber of crop cycles; Mosteiros W aNumber of farmers adopting drip irrigation; All tWatersheds (Paul, Faja, and Mosteiros) W a tNumber of farmers adopting drip irrigation; Paul W a tNumber of farmers adopting drip irrigation; Faja W aNumber of farmers adopting drip irrigation; tMosteiros W aPercent of contracted irrigation works disbursed t(cumulative) Indicator Classification Type Unit Baseline Cumulative Past Performance through last completed Compact Year Last Quarter Current Quarter Performance for Current Compact Year Remaining Annual Targets End of Compact Target Q [1] to Q [13] (Oct05 - Dec08) Q [14] (Jan-Mar 09) Q [15] (Apr-Jun 09) Q[13] to Q[16] (Oct08 - Sep09) Y[5] (Oct09 - Sep10) Q1 to Q20 (Oct05-Sep10) Target Target Cumulative Targets 29-Aug-08 D e Cumulative v Actuals i a Actuals Actuals Actuals as of (Date) Cumulative Actual for Compact Year Annual Target % Complete Towards Annual Target Date Date 21-Jan-09 Tons per Hectare Level 5.9 5.9 5.9 9.4 9.4 Tons per Hectare Level 10.2 10.2 10.2 14.3 14.3 11.1 Tons per Hectare Level 8.0 8.0 8.0 11.1 Thousands of US Dollars Level 67.7 67.7 508.7 220.9 Thousands of US Dollars Level 55.2 55.2 130.0 74.3 74.3 Thousands of US Dollars Level 8.4 8.4 251.9 83.2 83.2 Thousands of US Dollars Level 4.1 4.1 126.8 63.4 63.4 Number Level 1.33 1.33 2.00 2.00 2.00 Number Level 2.00 2.00 3.00 3.00 3.00 Number Level 1.00 1.00 1.50 1.50 1.50 Number Level 1.00 1.00 1.50 1.50 1.50 Number Incremental 0 109 0 0 228 0 0% 0 337 Number Incremental 0 109 0 0 120 0 0% 0 229 Number Incremental 0 0 0 0 59 0 0% 0 59 Number Incremental 0 0 0 0 49 0 0% 0 49 Percentage Cumulative 0 32% 42% 57% 100% 57% 57% 0 100% P r o j eW Indicator aArea irrigated with drip irrigation: All Watersheds t(Paul, Faja, and Mosteiros) W a tArea irrigated with drip irrigation; Paul W a tArea irrigated with drip irrigation; Faja W a tArea irrigated with drip irrigation; Mosteiros W Completion and equipping of rural extension acenters in all watersheds (Paul, Faja and tMosteiros) W aConstruct and equip packing and conservation tservice center in Paul W aNumber of farmers that have completed training in tat least 3 of 5 core agricultural disciplines: All eWatersheds (Paul, Faja, and Mosteiros) W aNumber of farmers that have completed training in tat least 3 of 5 core agricultural disciplines; Paul W aNumber of farmers that have completed training in tat least 3 of 5 core agricultural disciplines; Faja W Number of farmers that have completed training in aat least 3 of 5 core agricultural disciplines; tMosteiros W aValue of new loans disbursed - agriculture: All tWatersheds (Paul, Faja, and Mosteiros) W aNumber of new loans disbursed - agriculture: All tWatersheds (Paul, Faja, and Mosteiros) W a tPortfolio Risk above 90 days I nPort of Praia: Percent of contracted works fdisbursed (cumulative) I nCargo Village: Percent of works completed f(cumulative) I nQuay 2 Improvements: Percent of works fcompleted (cumulative) I nAccess Road: Percent of works completed f(cumulative) Indicator Classification Type Unit Cumulative Past Performance through last completed Compact Year Last Quarter Current Quarter Performance for Current Compact Year Remaining Annual Targets End of Compact Target Q [1] to Q [13] (Oct05 - Dec08) Q [14] (Jan-Mar 09) Q [15] (Apr-Jun 09) Q[13] to Q[16] (Oct08 - Sep09) Y[5] (Oct09 - Sep10) Q1 to Q20 (Oct05-Sep10) Target Target Baseline Cumulative Targets D e Cumulative v Actuals i a Actuals Actuals Actuals as of (Date) Cumulative Actual for Compact Year Annual Target % Complete Towards Annual Target Hectares Incremental 0 0 0 0 75 0 0% 36 111 Hectares Incremental 0 0 0 0 37 0 0% 21 58 Hectares Incremental 0 0 0 0 22 0 0% 7 29 Hectares Incremental 0 0 0 0 16 0 0% 8 24 Date Date 30-Sep-08 30-Dec-08 30-Dec-08 Date Date Number Incremental 0 100 83 0 400 83 21% 300 800 Number Incremental 0 50 32 0 150 32 21% 125 325 Number Incremental 0 25 15 0 125 15 12% 75 225 Number Incremental 0 25 36 0 125 36 29% 100 250 US Dollars Incremental 0 0 0 0 56,250 0 0% 393,750 450,000 Number Incremental 0 0 0 0 45 0% 135 180 Percentage Incremental 0% 0% 0% Percentage Cumulative 0% 9% 15% 18% Percentage Cumulative 0 0 5% Percentage Cumulative 0 1% Percentage Cumulative 0 0% 30-Dec-09 0% 0% 0% 5% 5% 49% 38% 78% 100% 100% 16% 61% 16% 26% 39% 100% 32% 57% 55% 57% 104% 44% 100% 4% 12% 48% 12% 25% 53% 100% 20% 20-Abr-09 P r o j eI Indicator n fContract for Phase I works signed I n fBCEOM submits final design for Phase II works I n fSite installation complete I nMobility ratio: Percentage of beneficiary fpopulation who take at least 5 trips per month ITravel time ratio: Percentage of beneficiary npopulation further than 30 minutes from nearest fmarket I nSavings on transport costs from upgraded roads fand bridge improvements I nSantiago Roads: Percent of contracted works fdisbursed (cumulative) I nSanto Antao Bridges: Percent of contracted works fdisbursed (cumulative) I nNumber of days per year that bridges are not fpassable I n fKilometers of roads rehabilitated I nAll compromise agreements signed or fexpropriation process completed for Road 2 I n fAll compromise agreements signed for Road 1 P r iMFI Gross Loan Portfolio P r iMFI Gross Loan Portfolio; Adjusted P r iMFI Portfolio at Risk; Adjusted P r iRatio of MFI's operationally self-sufficient P r iRatio of MFI's financially self-sufficient Indicator Classification Type Unit Baseline Cumulative Past Performance through last completed Compact Year Last Quarter Current Quarter Performance for Current Compact Year Remaining Annual Targets End of Compact Target Q [1] to Q [13] (Oct05 - Dec08) Q [14] (Jan-Mar 09) Q [15] (Apr-Jun 09) Q[13] to Q[16] (Oct08 - Sep09) Y[5] (Oct09 - Sep10) Q1 to Q20 (Oct05-Sep10) Target Target Cumulative Targets D e Cumulative v Actuals i a Actuals Actuals Actuals as of (Date) Cumulative Actual for Compact Year Annual Target % Complete Towards Annual Target Date Date 31-Jul-08 31-Jul-08 0 days Date Date 07-Aug-08 22-Dec-08 Date Date 23-Oct-08 31-Dec-08 Percentage Level 52% 52% 52% 65% 65% Percentage Level 54% 54% 54% 48% 48% Millions US Dollars Incremental 0.0 0.0 0.0 0.0 0.0 0.0 1.9 1.9 Percentage Cumulative 0% 28% 47% 64% 106% 64% 60% 128% 128% Percentage Cumulative 0% 19% 37% 52% 130% 52% 40% 139% 139% Number of Days Level 8 8 0 0 Kilometers Incremental 0 0 10 15 39 Date Date 31-Jul-08 11-Aug-08 Date Date 30-Jun-08 11-Aug-08 8 7 24 17 71% Thousand $ECV Level $223,101 $256,000 $296,203 $287,000 $323,000 $323,000 Thousand $ECV Level $152,528 $175,000 $216,574 $194,000 $222,000 $222,000 15% 16% 14% 14% Percentage Level 16% 16% Ratio Level 2/8 2/8 2/8 4/8 4/8 Ratio Level 0/8 0/8 0/8 3/8 3/8 P r o j eP Indicator rSignature of IEA with CSCC (Consello Superior de iCamaras de Comercio) P r iTender Documents approved and issued P rMCA CV approves Institutional Development iPlans P r iMCA accepts Q7 Progress Report P rLegislation modified permitting sale of securities to iindividuals P rNew auction process approved by Ministry of iFinance Indicator Classification Type Unit Baseline Cumulative Past Performance through last completed Compact Year Last Quarter Current Quarter Performance for Current Compact Year Remaining Annual Targets End of Compact Target Q [1] to Q [13] (Oct05 - Dec08) Q [14] (Jan-Mar 09) Q [15] (Apr-Jun 09) Q[13] to Q[16] (Oct08 - Sep09) Y[5] (Oct09 - Sep10) Q1 to Q20 (Oct05-Sep10) Target Target Cumulative Targets Date Date 06-Jun-08 Date Date 5-Dec-08 Date Date 3-Oct-08 Date Date 26-May-10 Date Date 30-Sep-08 Date Date 31-Dec-08 D e Cumulative v Actuals i a Actuals Actuals Actuals as of (Date) Annual Target Cumulative Actual for Compact Year % Complete Towards Annual Target 12-Feb-09 18-Dec-08 26-May-10 31-Dec-08 Millennium Challenge Account – Cabo Verde CONSELHO COORDENADOR Attachment F Conditions Precedent Report Estamos a construir o futuro We are building the future Nu sta construi futuru Conditions Precedent Report (Quarter 16) Quarter 16 (July‐ September 2009) Project/ Activity Condition Precedent Status Relevant Documentation Request for Deferral/Waiver and Justification Program Conditions precedent set forth in § § 3.3 and 3.6 of the Disbursement Agreement have been satisfied, as applicable to the relevant Disbursement Period. Satisfied Program Administration, Monitoring and Evaluation, all Projects and Project Activities Satisfactory current Implementation Plan (including the Detailed Financial Plan, Fiscal Accountability Plan, Procurement Plan, and Work Plans as applicable) is submitted to MCC. Satisfied Documents submitted To MCC th with the 16 Disbursement Request Narrative report submitted to MCC Satisfied Documents submitted To MCC th with the 16 Disbursement Request Conditions Precedent report submitted to MCC Satisfied Documents submitted To MCC th with the 16 Disbursement Request Financial report submitted to MCC Satisfied Documents submitted To MCC th with the 16 Disbursement Request Conditions Precedent Report (Quarter 16) Quarter 16 (July‐ September 2009) Project/ Activity Condition Precedent Status Relevant Documentation Request for Deferral/Waiver and Justification Procurement Performance report submitted to MCC Satisfied Documents submitted To MCC th with the 16 Disbursement Request Survey questionnaires and sample designs approved by MCC Not applicable An updated Procurement Plan that forecasts the upcoming six month procurement activities under the Program Satisfied Documents submitted To MCC th with the 16 Disbursement Request Evidence, satisfactory to MCC, that any insurance required under Section 3.9 of the Compact (effective as of the entry into force of the Compact) or under Section 3(d)(ii)(4) of Annex I of the Compact (effective as of the date of formation of MCA‐Cape Verde or such other date as the Parties may otherwise agree) has been obtained and maintained. Satisfied Insurance Documents submitted th To MCC with the 16 Disbursement Request An annual Detailed Financial Plan for the Program and each Project for the upcoming year, including estimated quarterly drawdown rates, together with a description and justification, by each activity, of what will be accomplished with the MCC Funding being requested during such annual period Satisfied Annual Detailed Financial Plan th submitted with the 16 Disbursement Request Conditions Precedent Report (Quarter 16) Quarter 16 (July‐ September 2009) Project/ Activity Condition Precedent Status Relevant Documentation Request for Deferral/Waiver and Justification A report, in accordance with the methodology agreed upon by the Parties, of the execution of the national budget expenditures of all resources, including the annual budget, extra‐budgetary or off‐ budget funds, and state‐owned enterprises that conduct activities of a public purpose (submitted within ten (10) days after the final accounts for the previous year are completed) Satisfied Documents submitted To MCC th with the 16 Disbursement Request Evidence of fulfillment of all applicable requirements under the M&E Plan Satisfied Documents submitted To MCC th with the 16 Disbursement Request Evidence of review and approval of the M&E Plan by the Steering Committee Satisfied Steering Committee Resolution All Projects Managing Director for MCA‐Cape Verde selected and engaged, or in the event the position is vacant, MCA‐CV is actively recruiting Satisfied Contract Senior Economist and M&E Analyst for MCA‐Cape Verde selected and engaged, or in the event the position is vacant, MCA‐CV is actively recruiting Satisfied Senior Economist and M&E Officer under Contract Conditions Precedent Report (Quarter 16) Quarter 16 (July‐ September 2009) Condition Precedent Status Relevant Documentation Request for Deferral/Waiver and Justification Watershed Project Manager for MCA‐Cape Verde is selected and remains engaged, or in the event the position is vacant, MCA‐CV is actively recruiting. Satisfied Contract Water Management and Agricultural Support Water Management and Agricultural Support /All Watershed Management and Agricultural Support Project Activities, as described in Schedule 1 Environmental and Social Assessment Manager is selected and remains engaged or in the event the position is vacant, MCA‐ CV is actively recruiting. Satisfied Contract Satisfactory current Implementation Plan (including the Detailed Financial Plan, Procurement Plan, Work Plans and M&E Plans) is submitted to MCC. Satisfied Documents submitted To MCC th with the 16 Disbursement Request The Implementing Entities are selected by MCA‐Cape Verde, approved by MCC, engaged and remain in place during implementation of Project. Satisfied IEA with MAA signed Project/ Activity Conditions Precedent Report (Quarter 16) Quarter 16 (July‐ September 2009) Project/ Activity Condition Precedent Status Relevant Documentation Request for Deferral/Waiver and Justification Water Management and Agricultural Support /Watershed Management and Soil Conservation MCA‐CV will have i) on file all the necessary permits ( environmental and others)validly issued and in full effect, ii) the relevant Environmental Management Plan (EMP) for each watershed area in place Satisfied Community‐based water resource management plans developed for each of the three watershed areas, and implemented and continued compliance, satisfactory to MCC, in subsequent years. Satisfied Environmental Impact Studies, approved by General Environment Directorate and ratified by the Minister of Environment and Agriculture; on December 16, 2006 Jonathan’s Nash´s report (message of February 8 th, 2007).The request for dismissal of the ESI for quarries in Mosteiros, Fajã and Paul has been approved by DGE and validated by Environment and Agriculture Minister. The request for dismissal of the ESI for quarries for SEMICO and PLACAR (2008 works) has been approved by DGE and validated by the Environment and Agriculture Minister. Plans developed MCC Approval of Water Resource Monitoring Plan and continued implementation of the approved plan throughout the Compact term satisfactory to MCC. Satisfied Conditions Precedent Report (Quarter 16) Quarter 16 (July‐ September 2009) Project/ Activity Condition Precedent Status Relevant Documentation Request for Deferral/Waiver and Justification MCA‐CV has presented to MCC the management plan for the transfer of ownership and management to the private sector of the packing sheds. Satisfied Document submitted to MCC on February 11, 2009 and accepted by a letter dated February 26, 2009 The Ministry of Environment and Agriculture and the Outside Project Manager has implemented a "fee for services" policy (satisfactory to MCC), charging fees for quality inspections, and certifications. Not Satisfied Given the delay in the construction of the packing sheds, MCA‐CV is requesting deferral until the quarterly disbursement period immediately preceding the inauguration of any of the Center The Government has eliminated regulatory and legal obstacles to movement of inspected and certified horticultural products, including taking all necessary regulatory or other actions to lift the embargo on exports of horticultural products from Santo Antão. Not Satisfied Given the delay in the construction of the packing sheds, MCA‐CV is requesting deferral until the quarterly disbursement period immediately preceding the inauguration of any of the Center Water Management and Agricultural Support /Access to credit Infrastructure Project MCA‐Cape Verde shall present recommendations regarding the conversion of loans to grants, for MCC approval Satisfied Disposition Plan submitted to MCC on March 30, 2009 Conditions Precedent Report (Quarter 16) Quarter 16 (July‐ September 2009) Project/ Activity Condition Precedent Status Relevant Documentation Request for Deferral/Waiver and Justification Infrastructure Project /All Infrastructure Project Activities Infrastructure Project Manager selected and engaged, or in the event the position is vacant, MCA‐CV is actively recruiting Satisfied Contract Environmental and Social Assessment Manager selected and engaged, or in the event the position is vacant, MCA‐CV is actively recruiting Satisfied Contract Each component document of the Implementation Plan (including the Detailed Financial Plan, Procurement Plan, Works Plans and M&E Plans) is current and updated for the applicable Project Activity. Satisfied Documents submitted To MCC th with the 16 Disbursement Request Infrastructure Project /All Port Activity Schedule 2(a) Infrastructure (Port) Project Manager selected and engaged, or in the event the position is vacant, MCA‐CV is actively recruiting Satisfied Contract Implementing Entity for the Port project activity is selected by MCA‐Cape Verde and approved by MCC, engaged and remains in place during implementation of Project. Satisfied signed IEA with MITM Completion, satisfactory to MCC, of an environmental audit Not satisfied The Environmental audit report will be available only by August 2009, after MCC mission of July 2009. Therefore MCA‐CV is requesting a deferral until Quarter 17 Conditions Precedent Report (Quarter 16) Quarter 16 (July‐ September 2009) Project/ Activity Condition Precedent Status Relevant Documentation Request for Deferral/Waiver and Justification MCA‐Cape Verde has developed an HIV/AIDS awareness program satisfactory to MCC and there is continued implementation, satisfactory to MCC, of the program. An EMMP for the Port (including water side, land side and fishing port) has been developed in Year 1 and continued implementation satisfactory to MCC including full implementation of health and safety measures. Satisfied Jonathan Nash e‐mail dated May 24, 2007 Satisfied Jonathan Nash e‐mail dated July th 8 2008 approving the EMMP Environmental and other permits obtained, validly issued and in full effect Satisfied Project‐specific Environmental Management Plans (EMPs) have been developed, and there is continued compliance, satisfactory to MCC Satisfied Environmental Impact Assessment for the first phase of the Modernization and Expansion of the Port Approved by Environment and General Directorate and Ratified by the Environment Rural Development and Marine Resources Minister on July 16th ,2008 Approved with the Environment th Impact Assessment on July 16 , 2008 MCA‐Cape Verde has engaged Outside Project Manager, following procurement acceptable to MCC, and remains engaged Satisfied Infrastructure Project / Port of Praia Upgrade ‐ Phase 1 st Contract signed on March 31 , 2008 Conditions Precedent Report (Quarter 16) Quarter 16 (July‐ September 2009) Project/ Activity Condition Precedent Status Relevant Documentation Request for Deferral/Waiver and Justification during implementation of Project. Infrastructure Project / Roads and Bridges ‐ Schedule 2, Section 2(b) Implementing Entity for the roads project activity is selected by MCA‐Cape Verde and approved by MCC, engaged and remain in place during implementation of Project. Satisfied IEA signed Implementation, satisfactory to MCC, of resettlement‐related compensation where relevant Satisfied for road 1 and Roads and Bridges of Santo Antão Payments made to all land users and terms of agreements signed. Plots whose landowners are not found, expropriated by Expropriation Resolution nr.26/2008 approved by th Government on August 11 , 2008; Expropriation Resolution nr. 26/2008 approved by th Government on August 11 , 2008. New expropriation resolution is being prepared to cover all lands along road 2 In Santo Antão one landowner signed with MCA‐CV, a promise sale and purchase contract on September 18, 2008. Partially Satisfied for Road 2 Conditions Precedent Report (Quarter 16) Quarter 16 (July‐ September 2009) Project/ Activity Condition Precedent Status Relevant Documentation Request for Deferral/Waiver and Justification Completion, satisfactory to MCC, of an environmental audit Not satisfied Infrastructure Project / Roads and Bridges ‐ Roads Upgrade and Construction in Santiago Continued compliance with road‐specific EMPs applicable to the sub‐activity described in Schedule 2 Section 2(b)(i)(1) through (5) Satisfied MCA‐Cape Verde has obtained the relevant environmental and other required permits validly issued and in full effect for each applicable road Satisfied MCA‐Cape Verde has developed an HIV/AIDS awareness program satisfactory to MCC and there is continued implementation, satisfactory to MCC, of the program Satisfied EMP for road 4 in application. ESMPs for roads 1 and 2 prepared and approved by MCC on June 28, 2007. ESMP for road 3,5 approved by MCC on th February 18 , 2007 Environmental Impact Studies for each road approved by the Environment General Directorate and homologated by the Minister of the Environment and the Agriculture. Environmental Impact Studies for the Quarry approved by the Environment General Directorate and homologated by the Minister of the Environment and the Agriculture. Permit for the quarry issued Contractor for HIV‐AIDS program since August 2006. Quarterly performance reports. The Environmental audit report will be available only by August 2009, after MCC mission of July 2009. Therefore MCA‐CV is requesting a deferral until Quarter 17 Conditions Precedent Report (Quarter 16) Quarter 16 (July‐ September 2009) Project/ Activity Condition Precedent Status Relevant Documentation Request for Deferral/Waiver and Justification Continued compliance with bridge‐specific EMPs applicable to the sub‐activity described in Schedule 2 Section 2(b)(ii)(1) through (2) Satisfied The Environmental management Plan has been approved by MCC th on February 18 , 2007 Infrastructure Project/ Roads and Bridges ‐ Bridge Construction and related works on Santo Antao Schedule 2, Section 2(b)(ii)(1)‐ (2) MCA‐Cape Verde has obtained the relevant environmental and other required permits validly issued and in full effect for each applicable bridge Satisfied MCA‐Cape Verde has developed an HIV/AIDS awareness program satisfactory to MCC and there is continued implementation, satisfactory to MCC, of the program. Satisfied Environmental Impact Studies for each bridge and road Vila das Pombas‐Eito approved by the Environment General Directorate and homologated by the Minister of the Environment and the Agriculture. The contractor ‐Armando Cunha – has received the approval from the Ministry of Environment and Agriculture of his request for the waiver of the Environmental Impact Study for picking up stones on an exploited quarry. Program developed. HIV/AIDS Agent Urgimed selected. Quarterly performance report delivered. Conditions Precedent Report (Quarter 16) Quarter 16 (July‐ September 2009) Project/ Activity Condition Precedent Status Relevant Documentation Request for Deferral/Waiver and Justification Private Sector Development Project Private Sector Development Project Manager for MCA‐Cape Verde is selected and engaged, or in the event position is vacant, MCA‐Cape Verde is actively recruiting. Satisfied Contract Private Sector Development Project/All Private Sector Development Activities Satisfied Documents submitted with the th 16 Disbursement Request. Each component document of the Implementation Plan (including the Detailed Financial Plan, Fiscal Accountability Plan, Procurement Plan, Works Plans and M&E Plans) is current and updated. Implementing Entity selected by MCA‐Cape Verde and approved by MCC, engaged and remains in place through implementation. Satisfied IEA with MFAP signed Millennium Challenge Account – Cabo Verde CONSELHO COORDENADOR Attachment G Quarterly Financial Report Estamos a construir o futuro We are building the future Nu sta construi futuru SCHEDULE A MCC Quarterly Financial Report Country: Accountable Entity: Compact Number: Date Submitted: CAPE-VERDE MCA-CV COM04CPV06001 10-Jun-09 Schedule A. Multi-Year Financial Plan Adjustment Request Form Disbursement Period: July 1 to September 30, 2009 Amounts Expressed In US Dollars Out of Cycle Report: Yes [ ] | No [X] Original Program Multi-Year Current Approved MultiFinancial Plan in the Compact Year Financial Plan Project (Main) (Sub) Management and Agricultural 1.Activity Watershed Support 1 Increase (+) 3 2 10,848,630 11,001,130 1.1 Watershed Management 6,800,250 6,730,258 1.2 Agribusiness Development 3,598,380 3,820,872 450,000 78,760,208 53,740,208 25,020,000 7,200,000 5,000,000 2,200,000 4,889,036 4,889,036 8,380,614 5,852,120 976,024 1,052,470 500,000 110,078,488 450,000 83,160,208 55,004,114 28,156,094 2,081,223 600,000 1,481,223 3,619,668 3,619,668 10,216,259 7,687,765 1,443,257 752,636 332,601 110,078,488 1.3 Credit 2. Infrastructure 2.1 Port 2.2 Roads and Bridges 3. Private Sector Development 3.1 Partnership to Mobilize Investment 3.2 Financial Sector Reform 4. Monitoring and Evaluation 4.1 Monitoring and Evaluation 5. Program Administration and Audits 5.1 Program Administration 5.2 Fiscal and Procurement Agents 5.3 Enhanced Transparency Initiative 5.4 Audits Grand Total Proposed Adjusted MultiYear Financial Plan Proposed Adjustments (Display all #'s as positive) 336,000 Decrease (-) 4 336,000 11,001,130 336,000 6,394,258 336,000 4,156,872 - - - - - - - - 336,000 (2+3-4) 5 336,000 450,000 83,160,208 55,004,114 28,156,094 2,081,223 600,000 1,481,223 3,619,668 3,619,668 10,216,259 7,687,765 1,443,257 752,636 332,601 110,078,488 SCHEDULE B MCC Quarterly Financial Report Country: Accountable Entity: Compact Number: Date Submitted: CAPE-VERDE MCA-CV COM04CPV06001 10-Jun-09 Schedule B. Summary of Multi-Year Financial Plan Adjustments to Date Disbursement Period: July 1 to September 30, 2009 Amounts Expressed In US Dollars Out of Cycle Report: Yes [ ] | No [X] Original Program MultiAdjustment Year Financial Plan in Approved (10-MarchCompact 08) Project (Main) Activity (sub) 1 1. Watershed Management and Agricultural Support 1.1 Watershed Management 1.2 Agribusiness Development 1.3 Credit 2. Infrastructure 2.1 Port 2.2 Roads and Bridges 3. Private Sector Development 3.1 Partnership to Mobilize Investment 3.2 Financial Sector Reform 4. Monitoring and Evaluation 4.1 Monitoring and Evaluation 5. Program Administration and Audits 5.1 Program Administration 5.2 Fiscal and Procurement Agents 5.3 Enhanced Transparency Initiative 5.4 Audits Grand Total 10,848,630 6,800,250 3,598,380 450,000 78,760,208 53,740,208 25,020,000 7,200,000 5,000,000 2,200,000 4,889,036 4,889,036 8,380,614 5,852,120 976,024 1,052,470 500,000 110,078,488 2 Adjustment Approved (10-June-08) Adjustment Approved (10-June-08) Adjustment Approved (10-Setember-08) Adjustment Approved (10-March-09) 3 4 6 7 152,500 - 152,500 4,400,000 1,263,906 3,136,094 (4,400,000) (4,400,000) - - - - - - (152,500) (152,500) - - 467,233 (299,834) (167,399) - 250,008 (250,008) - (718,777) (718,777) (1,116,868) (1,116,868) 1,835,645 1,835,645 - Current Approved Multi-Year Financial Plan (to Schedule A, Column 2) 8 (320,000) 320,000 - - - - 11,001,130 6,730,258 3,820,872 450,000 83,160,208 55,004,114 28,156,094 2,081,223 600,000 1,481,223 3,619,668 3,619,668 10,216,259 7,687,765 1,443,257 752,636 332,601 110,078,488 SCHEDULE C MCC Quarterly Financial Report Country: CAPE-VERDE Accountable Entity:MCA-CV Compact Number: COM04CPV06001 Date Submitted: 10-Jun-09 Schedule C. Actual Expenditures Report Disbursement Period: July 1 to September 30, 2009 Amounts Expressed In US Dollars Out of Cycle Report: Yes [ ] | No [X] Prior Period Cumulative Project (Main) Activity (Sub) 1. Watershed Management and Agricultural Support 1.1 Watershed Management 1.2 Agribusiness Development 1.3 Credit 2. Infrastructure 2.1 Port 2.2 Roads and Bridges 3. Private Sector Development 3.1 Partnership to Mobilize Investment 3.2 Financial Sector Reform 4. Monitoring and Evaluation 4.1 Monitoring and Evaluation 5. Program Administration and Audits 5.1 Program Administration 5.2 Fiscal and Procurement Agents 5.3 Enhanced Transparency Initiative 5.4 Audits Grand Total Current Period Cumulative Projected Disbursements for the Current Period All other Payments Projected Cumulative Disbursement as of the End of the Current Period Actual Cumulative Cash Disbursements (before beginning of Prior Period) Actual use of Prior Period amounts originally coded NA/NA Prior Period Actual Disbursements All other Payments Dec 31, 2009 Jan 1, 2009 Mar 31, 2009 Jan 1, 2009 Mar 31, 2010 Mar 31, 2009 Apr 1, 2009 Jun 30, 2009 Apr 1, 2009 Jun 30, 2010 Jun 30, 2009 2b 3 (1 + 2a + 2b) 4a 4b 5 (3 + 4a +4b) 1 4,296,330 2,809,344 1,286,986 200,000 23,506,399 11,874,067 11,632,332 470,829 470,829 1,015,384 1,015,384 5,681,690 4,517,931 727,112 325,749 110,898 34,970,632 2a - - - - - 1,139,376 819,191 320,185 4,365,104 1,573,488 2,791,616 291,125 74,125 217,000 282,314 282,314 587,912 396,619 149,560 41,733 6,665,832 Cumulative Actual Disbursements at Beginning of Current Period Cumulative Projected Disbursements for the Current Period Only 'NA/NA' Payments 5,435,706 3,628,535 1,607,171 200,000 27,871,503 13,447,555 14,423,948 761,954 74,125 687,829 1,297,698 1,297,698 6,269,602 4,914,550 876,673 367,482 110,898 41,636,463 - 1,421,461 1,081,535 89,926 250,000 8,874,761 4,736,438 4,138,323 213,059 103,775 109,284 77,936 77,936 592,412 403,831 67,775 98,333 22,473 11,179,629 6,857,167 4,710,070 1,697,097 450,000 37,721,277 18,183,993 18,562,271 975,013 177,900 797,113 1,375,634 1,375,634 6,862,015 5,318,381 944,447 465,815 133,371 53,791,105 SCHEDULE F – Cash Reconciliation and Interest Summary MCC Quarterly Financial Report Country: Accountable Entity: Compact Number: Date Submitted: CAPE-VERDE MCA-CV COM04CPV06001 10-Jun-09 Disbursement Period: July 1 to September 30, 2009 Out of Cycle Report: Yes [ ] | No [X] Out of Cycle Report: Yes [ ] | No [X] 1. Cash Balance From Beginning of Current Period in Permitted Account(s) 2. a. Add: MCC Disbursement(s) Received in Permitted Account(s) 2. b. Interest Earned and Received 2. c. Amount and Source of Other Cash Received 3. Total Sources of Cash This Period, (Lines 2.a + 2.b + 2.c) 4. Total Cash Available Held in Permitted Account(s), (Lines 1 + 3) 5. a. Less: Projected Disbursements for the Current Period -Only 'NA/NA' Payments (Schedule C, Column 4a) 5. b. Interest Returned to the US Government (if applicable) 6. Total Uses of Cash This Period, (Lines 5.a + 5.b) 7. Cash Balance in Permitted Account(s) at End of the Current Period, (Lines 4 - 6) $ $ $ $ - $ 110.56 - $ - 110.56 - Interest Summary 1. 2. 3. 4. 5. 6. 7. Cumulative Interest Earned and Received as of Beginning of Current Period Interest Earned and Received During the Current Period Total Interest Earned as of End of the Current Period, (Lines 1 + 2) Cumulative Interest Returned to the US Government as of Beginning of the Current Period Interest Returned to the US Government During the Current Period Total Cumulative Interest Returned During the Current Period, (Lines 4 + 5) Interest Due to Be Returned to the US Government, (Lines 3 - 6) $ $ 427,990.34 - $ $ 427,990.34 - $ $ $ 427,990.34 - Millennium Challenge Account – Cabo Verde CONSELHO COORDENADOR Attachment H Procurement Plan Estamos a construir o futuro We are building the future Nu sta construi futuru MCA-CV PROCUREMENT PLAN SUMMARY July 2009 to December 2009 Goods / Works / Non-Consultant Services Procurement ID Project Code Project Title / Description Estimated Cost USD Procurement Method Agribusiness Services Developement Equipement of warehouse for packing, conservation & treatment ( S.Antão ) 186,667 CB - Goods National Support Small purchases under DGPE procedures to be done by IE/MAA for the project activities: topographical survey, office supplies and other small expenses 15,000 DGPE Procedures Agribusiness Services Developement Seed and Vegetative Plant Production 20,000 Shopping MCA-CV/196/PP Private Sector Software for the IMFs 125,000 CB - Goods MCA-CV/197/PP Private Sector ICT for Government Securi2es Transac2ons 200,000 CB - Goods Estimated Cost USD Procurement Method MCA-CV/195/PP MCA-CV/48/PP MCA-CV/157/PP CONSULTANT SERVICES Procurement ID MCA-CV/161/PP Project Title / Description Project Code Prog. Admin - Fiscal Agent SIGOF Mapping 90,000 CQS MCA-CV/81/PP Prog. Admin - Fiscal Agent Organization specialist 16,000 ICS - Individual consultant selection MCA-CV/83/PP Prog. Admin Procurement Agent Training on Procurement Procedures for Central Government, Autonomous Institutions and Municipalities 269,699 QCBS MCA-CV/84/PP M&E - Monitoring & Evaluation Training in M&E 110,000 QCBS ICS - Individual consultant selection ICS - Individual consultant selection ICS - Individual consultant selection ICS - Individual consultant selection MCA-CV/199/PP M&E - Monitoring & Evaluation TA to support sector M&E 80,000 MCA-CV/200/PP M&E - Monitoring & Evaluation TA to support sector M&E 80,000 MCA-CV/201/PP M&E - Monitoring & Evaluation TA to support sector M&E 80,000 MCA-CV/89/PP M&E - Monitoring & Evaluation Data Quality Review II 32,320 GIS database Phase I 200,000 GIS database Phase II 250,000 QBCS 10,974 ICS - Individual consultant selection MCA-CV/90/PP MCA-CV/198/PP MCA-CV/94/PP M&E - Institutional Strenght. & Consult. M&E - Institutional Strenght. & Consult. M&E - Institutional Strenght. & Consult. Training: ESRI QBCS Millennium Challenge Account – Cabo Verde CONSELHO COORDENADOR Attachment I M&E Plan - See file M&E Plan.pdf Estamos a construir o futuro We are building the future Nu sta construi futuru Millennium Challenge Account – Cabo Verde CONSELHO COORDENADOR ATTACHMENT B LIST OF SUPPLEMENTAL AGREEMENTS None Estamos a construir o futuro We are building the future Nu sta construi futuru Millennium Challenge Account – Cabo Verde CONSELHO COORDENADOR ATTACHMENT C LIST OF PERMITS Declaration of Dismissal of EIS for the Post harvest centers of Porto Novo and São Filipe Estamos a construir o futuro We are building the future Nu sta construi futuru Millennium Challenge Account – Cabo Verde CONSELHO COORDENADOR ATTACHMENT D Execution of the national budget expenditures Estamos a construir o futuro We are building the future Nu sta construi futuru I N D Í C E I - Relatório da Conjuntura e Síntese da Execução do Orçamento de Janeiro a Dezembro a 2008 I – 1. Contexto Internacional …….………………………………………………….....1 I – 2. Economia Nacional – Evolução Recente ..…………………………………….....6 I – 3. Sector Monetário …….…….………………………………………………….....7 I – 4. Sector Externo .…….…….…………………………………………………........8 I – 5. Finanças Públicas ……………………………………………………………......10 I – 5.1. Análise da Receita . ……………………………………………………………11 I – 5.2. Análise da Despesa …………………………………………………………….13 I – 6. Financiamento ……..…………………………………………………………….20 I – 6.1. Dívida Pública …………………………………………………………………21 I – 7. Quadro Estatístico anexo ao relatório.........…………………………….……......23 I – 7.1. Operações Financeiras do Estado..…………………………………….………24 I – 7.2. Receitas Orçamentais . .……..………………………………………………...25 I – 7.3. Despesas Públicas Correntes .…………………………………………….......26 II – Anexos II – 1. Mapa A – Fluxos Financeiros do Estado II – 1.2. Mapa A.1 – Bilhetes e Obrigações do Tesouro Emitidos II – 1.4. Mapa A.3 – Desembolsos Efectuados o Quarto Trimestre do ano 2008 II – 2. Mapa B – Fundos Saídos da Tesouraria do Estado para Pagamento das Despesas Orçamentais II – 3. Mapa I – Receitas Correntes do Estado, Segundo uma Classificação Económica II – 4. Mapa II – Despesas de Funcionamento do Estado, Especificada Segundo a Classificação Económica e Orgânica. II – 4.1. Mapa II.1 – Despesas Globais de Funcionamento do Estado Segundo a Classificação Económica II – 4.2 Mapa II.1.1 – Despesas Globais de Funcionamento de Encargos Gerais da Nação, Segundo a Classificação Económica II – 4.3. Mapa II.1.2 – Despesas Globais de Funcionamento do Governo e Chefia do Governo, segundo a Classificação Económica II – 4.4. Mapa II.1.3 – Despesas Globais de Funcionamento de Serviços e Fundos Autónomos, Segundo a Classificação Económica II – 4.5. Mapa II.1.4 – Adiantamento de Fundos por Regularizar II – 4.6. Mapa II.1.5 – Amortização de Empréstimos II – 5. Mapa IV – Receitas Globais de Serviços e Fundos Autónomos, Segundo a Classificação Económica e Orgânica II – 6. Mapa V – Despesas Globais de Serviços e Fundos Autónomos, Especificadas Segundo a Classificação Económica e Orgânica II – 1.5. Mapa A.5 – Pagamento de Programa Plurianual de Investimentos Públicos Directamente aos Projectos II – 7. Mapa X – Programa Plurianual de Investimentos Públicos Estruturados Por Programas e Sub-Programas II – 4.6. Mapa II.1.6 – Estoque da Dívida Interna Pública por credores e por Instrumentos de Financiamento II – 4.6. Mapa II.1.6 – Estoque da Dívida Externa Pública por credores e por Instrumentos de Financiamento I – RELATÓRIO DE CONJUNTURA E SÍNTESE DA EXECUÇÃO DO ORÇAMENTO DO ESTADO DE JANEIRO A DEZEMBRO 2008 Relatório de Conjuntura e Síntese da Execução Orçamental www.minfin.cv Contexto Internacional Os indicadores apresentados primas, mais além da própria desaceleração da procura mundial. recentes por para Perante diversas esse ambiente de instituições internacionais confirmam arrefecimento, o Fundo Monetário a severa desaceleração por que Internacional foi obrigado a rever passa económica em baixa as suas projecções para o mundial. A grande turbulência no crescimento da economia mundial sistema bancário teve como reflexos para 2009, para 0,5%, quando em imediatos fortes nas Novembro a previsão era de 1,75%. condições de rápida Esta taxa, a mais baixa verificada deterioração da confiança e quedas desde a segunda guerra mundial e acentuadas nas bolsas de valores. que é calculada através da paridade De acordo com o Banco Central do Europeu (BCE) no mês de Dezembro negativa o índice de gestores de compra termos da taxa de juro de mercado. (PMI), calculado sobre o cômputo Tendo global da actividade industrial, atingiu incrementos que vêem sendo feitos o seu nível mais baixo desde o início no sistema de crédito e as políticas de 1998. Para a acentuada queda monetárias e fiscais expansionistas que de adoptadas por diversos países, o crescimento da economia mundial no FMI prevê uma recuperação gradual final do ano de 2008, contribuiu da economia mundial a partir de essencialmente a deterioração no 2010, quando deverá atingir um sector crescimento de 3%. Não obstante, a se da actividade verificou restrições crédito, no manufactura, ritmo tendo a poder de compra, quando em torna-se calculada consideração os produção caído a rápida velocidade. permanecem O sector dos serviços, igualmente incertezas tendo em conta o tempo atingiu níveis historicamente baixos, e ainda que de forma mais moderada. adoptadas. Em simultâneo, verifica-se que as É neste cenário que se perspectiva pressões inflacionistas atenuaram-se para as economias avançadas uma a nível mundial em razão da queda contracção no produto em cerca de acentuada no preço das matérias- 2%, no ano de 2009. Esta será a a ainda em velocidade das algumas acções primeira contracção anual desde o Gabinete de Estudos e Estratégia Direcção Geral da Contabilidade Pública 1 Relatório de Conjuntura e Síntese da Execução Orçamental www.minfin.cv perdas momento melhor preparados para produto enfrentar as mudanças ocorridas a (relativamente ao nível potencial), nível global, em razão das políticas comparativamente aos períodos de macroeconómicas mais adequadas 1974-75 e 1980-82. Não obstante, no que pressuposto Todavia, o continente se encontra período pós-guerra, acumuladas com no de uma melhor vêem sendo coordenação das acções de política ainda financeira a comparativamente à outras regiões normalização gradual das condições tendo em conta os altos níveis de do mercado financeiro, assim como pobreza os estímulos fiscais adequados e os dependência das exportações de cortes nas taxas de juros em diversas matérias-primas. economias avançadas, prevê-se que A lenta evolução da actividade o produto comece a sua recuperação económica real nos finais de 2009, devendo assim acentuada dos atingir um crescimento de 1% em commodities têm amortecido as 2010. A estabilização do mercado pressões imobiliário dos Estados Unidos da economias avançadas a previsão é América é esperada para suportar tal de que dos 3.5% verificados em retoma 2008, a inflação caia para um nível que do suportarão crescimento nesse numa adoptadas. posição ainda de verificados e a preços inflacionistas. alerta e a queda das Nas período. recorde de 0.25% em 2009, para Para as economias emergentes e em depois atingir os 0.75% em 2010. desenvolvimento perspectiva-se que Aliás, a expectativa é de que dos 6.25% estimados para 2008, o algumas crescimento deverá cair para 3.25% experimentem períodos com taxas em 2009, na decorrência da queda negativas. acentuada na procura externa, da emergentes e em desenvolvimento redução dos preços das matérias- são esperadas taxas de inflação a primas e do aumento das limitações volta dos 5.75% em 2009 e 5% em das 2010, bem abaixo da verificada em condições de financiamento dessas Quanto economias aos países externo. Deve-se salientar que alguns 2008, de cerca de 9.5%. países em A queda acelerada na procura desenvolvimento, encontram-se neste global vem causando colapsos nos africanos, Gabinete de Estudos e Estratégia Direcção Geral da Contabilidade Pública 2 Relatório de Conjuntura e Síntese da Execução Orçamental www.minfin.cv preços das matérias-primas. Apesar recessão desde Dezembro de 2007. das tensões geopolíticas e dos cortes De na produção, o preço do petróleo já estimativas, o PIB contraiu a uma sofreu uma redução de cerca de 60% taxa anualizada de 0,5% no terceiro desde quando trimestre de 2008, comparado com alcançou o seu pico de USD 140 o os 2.8% verificados no período brent. Contudo ainda mantém-se em anterior. Para o quarto trimestre a níveis elevados, em termos reais, estimativa é de que a recessão seja quando comparado com o período intensificada na sequência da piora dos anos 90. A previsão do FMI para das o preço base do petróleo foi assim trabalho e do aumento das tensões revista para baixo, para USD 50 o no mercado financeiro devido as barril em 2009 e USD 60 em 2010 restrições ao crédito. O consumo (comparativamente aos USD 68 e privado USD 78 respectivamente, da sua negativamente afectado pelos altos anterior actualização de Novembro), níveis de desemprego, perda de havendo ainda riscos descendentes confiança sobre tais projecções. Os preços dos redução da riqueza das famílias. A metais estão manutenção das contracções no igualmente em queda, na sequência sector imobiliário e o arrefecimento dos desenvolvimentos mais recentes. da procura externa acarretem riscos Tais têm adicionais às perspectivas para a de economia. O déficit do orçamento Julho e de dos declínios retraído as crescimento 2008, alimentares nos preços projecções de vários os EUA em particular o continua dos mercado a de ser consumidores tem-se aumento resultado e deteriorado das das despesas, medidas em fiscais adoptadas para suportar o sistema da actividade económica, tendo o de do últimas redução das receitas de impostos e os para a manutenção do arrefecimento Nacional as rapidamente tendo em conta a indicadores mais recentes apontam Gabinete com condições federal países exportadores de commodities. Para acordo financeiro e a economia de uma Pesquisas forma geral. Na sequência dos Económicas anunciado em Dezembro desenvolvimentos nos preços, a de 2008 que a economia daquele inflação anual caiu para 1.1% em país tem estado a passar por uma Gabinete de Estudos e Estratégia Direcção Geral da Contabilidade Pública 3 Relatório de Conjuntura e Síntese da Execução Orçamental www.minfin.cv Novembro, bem abaixo da média de procura interna para o crescimento 4.2% para o ano. Tal desaceleração chegou a atingir o nível zero. O reflecte o declínio nos custos dos comércio líquido retraiu-se com a bens energéticos e o arrefecimento queda das exportações, ao mesmo na economia. A taxa da inflação core tempo em que se verificou uma anual abranda para os 2% no mesmo ligeira período. importações. Mercado Aberto da -0.6 de 0% à 0.25%. Com esta iniciativa a Reserva Federal está a dar sinais de de p.p. Os desenvolvimentos recentes no comércio a retalho, referência – de 1% para o intervalo medidas sua (p.p), devendo situar-se a volta dos para os fed funds – taxa de juros de à a em torno de 0.1 pontos percentuais Reserva Federal decidiu cortar a sua meta recurso Assim das contribuição foi revista para baixo, À 16 de Dezembro de 2008 o Comité de recuperação conjugados com confiança dos (patamar política não a perda de consumidores registrado desde 1985) apontam para a manutenção monetária não convencionais para do baixo nível das despesas com o promover a funcionalidade do sistema consumo, financeiro e estimular a economia. ao longo do último trimestre de 2008 até os primeiros Na zona euro, o ritmo da actividade económica meses de 2009. Os dados mais desacelerou recentes marcadamente na segunda metade do ano de 2008. Em enfraquecimento bases industrial trimestrais, o PIB cresceu apenas das para a manutenção da profunda investimentos privados compensados pelo a verificadas em da construção igualmente mantém a dos sua serem aumento reduções intermediários e de capital. O sector procura interna, estando a redução queda quarto do declínio da produção de bens cenário traduz o arrefecimento da a do Setembro e Outubro, em resultado contracção até o final do ano. Esse e longo actividade 1.6% em Novembro, valor acima informações mais recentes apontam consumo ao da forte trimestre. A produção mensal caiu 0.2% no terceiro trimestre, e as do sugerem tendência marcadamente das de redução observada em Setembro. Na decorrência desses despesas públicas. A contribuição da Gabinete de Estudos e Estratégia Direcção Geral da Contabilidade Pública 4 Relatório de Conjuntura e Síntese da Execução Orçamental www.minfin.cv de dos países da região sofreram desemprego aumentou desde o início fortes quedas devido a diminuição do ano de 2008 de 7.2% para 7.8% da procura mundial, o que contribuiu em rápida igualmente para a derrapagem da depreciação do US dólar verificada produção industrial. Percebe-se por em Outubro, seguida de uma quase outro lado um arrefecimento na estabilização em Novembro, o Euro demanda interna, apesar da inflação recupera-se Dezembro se situar em níveis moderados em espelhando assim a deterioração das resultado da redução dos preços do expectativas mercado petróleo e das outras matérias- relativamente ao crescimento das primas. A economia chinesa tem economias dos EUA e da zona euro. experimentado ao longo dos últimos Já no inicio de Janeiro de 2009, o meses claras desacelerações, com Euro deprecia-se novamente face ao a queda da procura externa a USD, possivelmente em razão das provocar fortes cortes na produção implicações das expectativas sobre industrial, que se situou a volta dos os resultados dos pacotes fiscais 5.4% em Novembro. Adicionalmente anunciados para a economia norte- as americana, enquanto que a produção fortemente nos dois últimos meses industrial e a inflação na zona euro do ano, quando comparados com os são anunciados abaixo dos níveis valores dos períodos anteriores. Em esperados do Novembro de 2008 a inflação caiu mercado. Assim, à 14 de Janeiro o rapidamente para 2.4% quando em câmbio Outubro acontecimentos a Novembro. taxa Após em do pelos Euro/USD a agentes situava-se em exportações reduziram-se registava os 4.0%. O 1.32, valor este abaixo em cerca de Banco do Povo da China continua a 8% em comparação com o verificado afrouxar em finais de Setembro e 10.5% monetárias, tendo em Dezembro relativamente a média do ano de efectuado cortes nas taxas de juro 2008. pela 5ª vez, consecutiva desde desacelerar. económica Em continua particular suas políticas Setembro de 2008. A taxa de juro Nos países emergentes da Ásia, a actividade as anual a de referência para empréstimos foi reduzida dos 7.47% as observados em Setembro para os exportações provenientes da maioria Gabinete de Estudos e Estratégia Direcção Geral da Contabilidade Pública 5 Relatório de Conjuntura e Síntese da Execução Orçamental www.minfin.cv 5.31% e a taxa de juro anual para Indicadores Mundiais depósitos dos 4.14% para os 2.25%, (Taxas de Crescimento) no mesmo período. Projecções Estimativas Na região da América Latina os sinais 2008 de alguma desaceleração 2009 2010 3,4 0,5 3,0 1,0 -2,0 1,1 EUA 1,1 -1,6 1,6 Zona Euro 1,0 -2,0 0,2 Japão -0,3 -2,6 0,6 Outras Economias Avançadas 1,9 -2,4 2,2 6,3 3,3 5,0 China 9,0 6,7 8,0 Índia 7,3 5,1 6,5 Brasil 5,8 1,8 3,5 África 5,2 3,4 4,9 5,4 3,5 5,0 Economias Avançadas 3,5 0,3 0,8 Mercados Emerg. Econ. Em Desen. 9,2 5,8 5,0 PIB REAL são Economia Mundial evidentes, enquanto que a inflação mantém-se em níveis quando comparada regiões do globo. elevados com No Economias Avançadas Economias Emerg. Econ. Em Desen. outras Brasil a Sub-Sahariana produção Industrial contraiu-se a uma taxa anualizada de 6.2% INFLAÇÃO em Novembro, tendo crescido apenas 1.1% em Outubro, depois Fonte: Actualizações das Perspectivas Económicas Mundiais/Janeiro 2009 - FMI do excepcional aumento verificado em Setembro de cerca de 9.7%. A taxa Economia Nacional – Evolução de inflação homóloga em Novembro Recente situou-se a volta dos 6.4%, igual valor observado no mês anterior. As perspectivas para o crescimento Na da Argentina a actividade económica economia cabo-verdiana ao longo do ano de 2008, a situar-se deteriorou-se ao longo do mês de no intervalo de [6%,7%], estão Novembro com a produção industrial assentes a crescer em torno de 2.6% nesse nos bons resultados esperados para a procura interna e período, que se compara aos 5.8% para do mês de Setembro. A inflação os Pese igualmente permaneceu em níveis investimentos embora internacional elevados, tendo passado dos 9% de a públicos. conjuntura desfavorável, com diversas economias a passarem por Agosto para 7.2% em Novembro. períodos de recessão, a economia cabo-verdiana sustentada mantém-se essencialmente firme, por políticas macroeconómicas sólidas, não obstante a forte dependência externa. Os económica Gabinete de Estudos e Estratégia efeitos mundial da crise têm sido Direcção Geral da Contabilidade Pública 6 Relatório de Conjuntura e Síntese da Execução Orçamental www.minfin.cv minimizados, contudo, deve-se ter em Esses valores poderão estar a atenção as consequências futuras espelhar a tendência de redução do para a balança de pagamentos, tendo preço das matérias-primas que se em das começa a evidenciar em diversas e de economias. Contudo, em termos face aos anuais, a taxa de variação do IPC conta a volatilidade actividades turísticas investimento externo, nacional em 2008 foi de 6.8%, valor choques exógenos. este acima do observado no ano De acordo com os dados do Boletim transacto em cerca de 2.4 p.p.. de Conjuntura do quarto trimestre de 2008 do Instituto Nacional Considerando-se de dos produtos alimentares e bebidas favorável não obstante o indicador de não alcoólicas, dos transportes e clima ter evoluído desfavoravelmente das rendas de habitação, água, relativamente ao período homólogo electricidade, de 2007, o que denota um certo no ritmo sua representação no cabaz, as classes Estatística, a conjuntura económica é abrandamento a gás e outros combustíveis contribuíram em torno de dos 72% para a formação da crescimento económico. Os sectores referida taxa. da indústria transformadora e dos transportes apresentam uma conjuntura favorável, contrariamente Sector Monetário 1 ao verificado nos sectores do turismo Com base nos dados provisórios - cujo indicador de confiança registou relativos ao sector monetário e o valor mais baixo dos últimos 12 trimestres –, estabelecimento do e comércio da cambial, em recuperação construção manteve igualmente das internacionais onde se constata que o indicador de confiança constata-se líquidas uma reservas que cresceram em torno de 4.79% no a último trimestre do ano e cerca de tendência descendente dos últimos 7.91% face ao período homólogo. trimestres. Relativamente à inflação, o IPC registou em Dezembro uma O crédito interno manteve a sua taxa de variação mensal negativa, - tendência 0.6% , contudo, acima da verificada atingido um crescimento de 18.76% no mês anterior em torno de 1.3 p.p. 1 Gabinete de Estudos e Estratégia expansionista, tendo Com base nos dados do Banco de Cabo Verde Direcção Geral da Contabilidade Pública 7 Relatório de Conjuntura e Síntese da Execução Orçamental www.minfin.cv em termos homólogos e de 3.57% no principalmente pelo aumento dos trimestre. Essa evolução é justificada depósitos a ordem em cerca de essencialmente 4.75% no mesmo período. Durante pelo desempenho principal o último trimestre do ano percebeu- componente, o crédito a economia se um crescimento da moeda em que circulação em torno dos 14.70%, bastante positivo registou da um crescimento homólogo de cerca de 28.71% e de justificado 5.46% em termos propícia a maiores dispêndios em crédito ao trimestrais. sector O compras público pela época pelas festiva, famílias, e administrativo, por sua vez, manteve consequentemente uso de maiores a sua trajectória de redução, ao quantidades de moeda. registar crescimentos negativos de 8.19% e de 3.06% respectivamente Sector Externo face ao período homólogo e ao Os dados provisórios das contas trimestre. Esses resultados espelham os desenvolvimentos observados no externas crédito ao governo central, item de trimestre sugerem um aumento do mais peso nesta rubrica, referentes ao quarto que défice da conta corrente em cerca apresentou decréscimos de 16.54% face ao mesmo período do ano de 17.5% no período homólogo. transacto e de 9.46% ao longo do Esse comportamento é justificado último trimestre do ano, em linha com os objectivos de redução pela redução ocorrida na balança de das necessidades de financiamento do serviços em cerca de 10,0%, no Governo. mesmo período, em razão da queda Por seu turno, a massa monetária das exportações de serviços em registou um acréscimo de 7.91% em torno de 5.1%, na decorrência do termos homólogos, tendo acumulado um total de 102.088,9 milhões de decréscimo das viagens por motivo ECV em Dezembro de 2008. Da sua de turismo em cerca de 7.7%. Tais decomposição destaque-se o resultados crescimento homólogo do M1 em torno 4.54%, reflectem o actual cenário de arrefecimento que muitas impulsionado Gabinete de Estudos e Estratégia Direcção Geral da Contabilidade Pública 8 Relatório de Conjuntura e Síntese da Execução Orçamental www.minfin.cv economias vêem enfrentado, contrariando o cenário de reduzindo assim o fluxo de turistas decréscimo que visitam Cabo Verde. Deve-se verificado. realçar igualmente o aumento do Relativamente a balança financeira, défice da balança de bens em torno os dados mais recentes apontam de 6.8%, tendo-se verificado por para uma queda do investimento conseguinte das directo estrangeiro (IDE) em cerca importações em cerca de 5.8% contra de 35.4% em comparação com o uma queda das exportações a volta período de 1.9%. Por seu turno a balança de anuais estima-se um crescimento rendimentos uma do IDE de apenas 3.8% em 2008. acentuada redução, em torno de Recorda-se que o IDE em Cabo 31.3%, na sequência particularmente Verde tem sido maioritariamente da direccionado um aumento apresentou diminuição dos rendimentos anteriormente homólogo. para Em o termos sector da provenientes do investimento directo imobiliária, em as financeiro. Assim, considerando-se transferências oficiais cresceram em a actual conjuntura internacional de cerca influenciadas crise, já era de se esperar alguns aumento reflexos negativos que agora se ocorrido nas remessas de emigrantes fazem sentir sobre o investimento a externo no país. torno de de 2.4%, essencialmente volta 53.2%. de pelo 8.4% em Já termos seguido do sector homólogos. De notar que desde o terceiro trimestre que essa variável vem apresentado resultados positivos Gabinete de Estudos e Estratégia Direcção Geral da Contabilidade Pública 9 Relatório de Conjuntura e Síntese da Execução Orçamental www.minfin.cv Finanças Públicas ajuda ao projecto no período em análise. Em 2008 a execução orçamental provisória apresentou um défice de 0,9% do PIB, face a 1,2% conseguido no período homólogo. G. 1.1. Oper. Financeiras do Estado O 12200 M ilhões de CVE comportamento das contas públicas, no período, resulta de um aumento das receitas públicas na ordem de 7200 2200 -2800 -7800 -12800 3,8% em termos homólogos, -17800 4º T/07 enquanto que aumentaram a as um despesas ritmo 4º T/08 Saldo orçamental 2007 (exec.) 2008 (orc.) S. global s/donat. Saldo global mais acelerado, 11%, tendo contribuído para este valor principalmente a taxa de crescimento do programa de G. 1.2. Financiamento do Estado M ilhões de CVE investimento público (16,5%) e um crescimento menos acentuado das despesas de funcionamento (7,7%). Excluindo os encargos com os juros 5000 4000 3000 2000 1000 0 -1000 -2000 -3000 -4000 -5000 4º T/07 da dívida, o saldo das contas públicas Externo 4º T/08 2007 Interno (sistema bancário) 2008 (orc.) exec) (orç.) Interno (outros) Discrepância (saldo primário) regista um excedente de 0,6% do PIB. A receita total (incluído a ajuda alimentar e donativos) atingiu 31,5% G. 1.3. Op. Financeiras do Estado 45000 40000 35000 30000 25000 20000 15000 10000 5000 0 -5000 -10000 -15000 -20000 -25000 -30000 -35000 -40000 -45000 M ilhões de C V E do PIB (33,4% do PIB no período homólogo), ou seja, uma redução de 1,9 p.p do PIB face ao ano anterior, reflectindo uma variação homóloga positiva de 3,8%. comportamento é 4º T/07 Este Donativos 4º T/08 Transf. OFN 2007 R.Orç. D.Corr. 2008 D. de Invest. D. extraord. explicado principalmente pela evolução positiva das receitas fiscais e As donativos despesas públicas atingiram 32,5% do PIB (32,2 % do PIB no entrados via ajuda orçamental e período homólogo), reflectindo um Gabinete de Estudos e Estratégia Direcção Geral da Contabilidade Pública 10 Relatório de Conjuntura e Síntese da Execução Orçamental www.minfin.cv crescimento ainda que moderado das Análise da receita despesas A receita orçamental correntes (7,7%), em em 2008 função sobretudo dos aumentos das (excluindo donativos e outras fontes outras despesas correntes (21,3%), nacionais) atingiu 33.218 milhões de transferência (18,7%), CVE, correspondendo a um grau de despesa com o pessoal (3,4%) e execução de 98%, valor esse que principalmente de subsídios (em 595 representa um decréscimo de 0,2% milhões de CVE). As despesas de face ao período homólogo. Este investimentos, comportamento é explicado cresceram significativamente (16,5%, principalmente pelo resultado em alcançado nas receitas de capital e corrente por seu termos correspondendo, gastos com turno, homólogos), principalmente, projectos estruturação de em a receitas infracurso, não fiscais, apresentaram uma execução 38,3% de que taxa de e 82% desenvolvimento do capital humano e respectivamente. Por sua vez, as promoção receitas da boa governação, fiscais, registaram um representando uma taxa de execução acréscimo de 12,8% em relação ao de período cerca de execução 92,5%, conseguida acima no da mesmo homólogo, corresponde período do ano anterior que foi de a uma a que taxa de execução de 105,4%. 85,5%. A boa contribuição das receitas O saldo corrente apresenta um fiscais, em 2008, deve-se superavit de 7.165 milhões de CVE, sobretudo, espelhando um crescimento face ao cobrança de IUR, que cresceu período homólogo, em torno dos 11,4% 26,5% e confirmando a evolução impostos indirectos, que cresceram bastante 13,3% face ao período homólogo. positiva das receitas correntes relativamente às despesas Do correntes, promovendo canalização recursos de para lado a do desempenho arrecadação imposto na dos sobre assim, a rendimento, a incidência especial do fatia de bom desempenho alcançado no investimentos período em análise ficou a cargo do maior os e ao públicos. IUR – Pessoas Colectivas que cresceu 17,5% e pelo crescimento Gabinete de Estudos e Estratégia Direcção Geral da Contabilidade Pública 11 Relatório de Conjuntura e Síntese da Execução Orçamental www.minfin.cv menos acentuado de 7,1% do IUR – arrecadação efectuada pela DGCI, Pessoas Singulares, resultado de registou-se um acréscimo de 24,7% maior rendimento registado em 2007 comparativamente pelos grandes contribuintes e por homólogo, uma arrecadação essencialmente de maior controlo traduzida pela contínua melhoria da efectuado no acompanhamento dos fiscalização. Todavia, em termos da maiores contribuintes em sede do previsão inicial, a execução do IUR- IVA. Em relação a arrecadação do PC ficou ligeiramente abaixo da IVA pela DGA, registou-se um previsão acréscimo melhoria na inicial, devido ao período resultado de 14,1%, o que essencialmente aos processos de representa uma desaceleração em reclamações relação a 2007 de 4,4 p.p, derivado apresentados pelos contribuintes, que neste momento, do aumento das correm os seus trâmites normais concedidas e da diminuição da junto da administração fiscal. importação de isenções alguns produtos, nomeadamente 35000 33000 31000 29000 27000 25000 23000 21000 19000 17000 15000 13000 11000 9000 7000 5000 3000 1000 -1000 (Milhões de produtos alimentares G. 1.4. Receitas Correntes primários e transformados, gasóleo e gás. Em relação aos restantes impostos indirectos, destacam-se desempenho 4º T/07 Não-fiscais 2007p 4º T/08 Impostos sobre o rendimento Impostos 2008p IVA o bom principalmente sobre dos Transacções Outros Impostos Internacionais e Imposto Sobre Bens e Serviços, onde registaram Quanto ao imposto sobre o valor um acréscimo de 9,5% e 8,7% acrescentado dos respectivamente quando comparado um ao período homólogo, resultado em reembolsos, não deduzido verificou-se acréscimo de 18,2% comparado com parte o período homólogo, sendo 58% do internacionais total arrecadado pela Direcção Geral aumento de importação de produtos das Alfândegas (DGA) e 41% pela para construção, máquinas, meios Direcção Geral das Contribuições e de transportes e outros bens de Impostos (DGCI). Relativamente a consumo. Gabinete de Estudos e Estratégia do aumento e dos preços também do Direcção Geral da Contabilidade Pública 12 Relatório de Conjuntura e Síntese da Execução Orçamental www.minfin.cv Em relação ao imposto de selo, a Quanto taxa de variação homóloga registou registou-se uma variação negativa uma ligeira diminuição de 0,9%, de 76,9% no período, devido em quando comparada com o período parte à situação atípica ocorrida em homólogo. A evolução negativa deste 2007 imposto é justificada essencialmente algumas empresas do Estado e à pelo encontro de contas realizado em baixa taxa de execução (38,3%) de 2007, algumas onde foram contabilizadas Cotizações “Vendas para de correntes” bens e rubricas de “ das de subrubricas “ terrenos” principalmente previdência”, e privatização vendas de baixa taxa de realização de “vendas impulsionado pelas a capital, maquinarias e equipamentos”. A registou um decréscimo de 2,5% em principalmente com de terreno”, “ vendas de edifícios” e “ Por sua vez, a receita não fiscal homólogos, receita nomeadamente dívidas referentes a anos anteriores. termos à das serviços é justificada pela manutenção contracções no sector imobiliário externo que influenciam “Transferências directamente o referido sector ao correntes. nível nacional. Por sua vez, a rubrica “Cotizações para previdência social”, registou uma taxa de variação negativa de 41,2%, encontrando-se influenciada Análise da despesa em Despesas de Funcionamento grande medida pelo aumento da transferência efectuados dos pelos descontos funcionários No período de Janeiro a Dezembro, públicos ao INPS, conforme a política as adoptada pelo Governo de incluir os funcionários no Sistema despesas de funcionamento atingiram 25.040 milhões de CVE, de cerca de 93,6% da previsão revista, Providência Social. representando um acréscimo em Em relação às restantes rubricas, as termos homólogos de 7,7%. execuções, poderão alterar-se com a apresentação de dados definitivos Este aumento das despesas de dos institutos, fundos e serviços funcionamento decorreu sobretudo autónomos. Gabinete de Estudos e Estratégia Direcção Geral da Contabilidade Pública 13 Relatório de Conjuntura e Síntese da Execução Orçamental www.minfin.cv do acréscimo verificado nas outras A evolução despesas (21,3%), Correntes”, de cerca de 18,7% face (18,7%), ao correntes transferências despesa correntes com o encargos da principalmente pessoal dívida de (3,4%), (0,8%) subsídios. período e variação comparativamente Por • 26000 24000 Transferências para o exterior (470%), justificada em período grande medida transferência homólogo. pela efectuada à CEDEAO referente a taxa G. 1.5. Despesas Correntes 28000 foi subrubricas: negativa ao homólogo, aumento ocorrido nas seguintes capital e aquisição de bens e serviços uma “Transferências impulsionada na sua maioria pelo outro lado, a rubrica despesa de registarou das (Milhões ECV)de (Milhões CVE) comunitária cobrada pela Direcção Geral das Alfândegas, de Janeiro a 22000 Julho 2008; 20000 18000 16000 • 14000 12000 No que se refere às privadas o 10000 transferências 8000 6000 4000 aumento verificado de 139%, 2000 0 4º T/07 Salários 2007p.r. Bens e serv. Juros int. 4º T/08 Juros ext. Juros ext. 2008p.r. Transf. é justificado essencialmente Outras pelo pagamento subvenções Nas “ Outras Despesas Correntes” o acréscimo de comparativamente homólogo, relativos 21,3% ao autárquicas período do as de Estado eleições ocorridas em 2008. decorre, • fundamentalmente, dos pagamentos No que tange a transferência dos atrasados do Estado assumidos às famílias, registou-se um em 2005 com a Emprofac, o INPS, a acréscimo de 13,6%, para o Telecom, a Electra, a ASA, o BCA e a qual Câmara Municipal e pelo pagamento essencialmente o aumento das restituições do IUR e IVA no verificado na Pensão de período em análise. Sobrevivência, Pensão de concorreu, Aposentação e na Pensão do Gabinete de Estudos e Estratégia Direcção Geral da Contabilidade Pública 14 Relatório de Conjuntura e Síntese da Execução Orçamental www.minfin.cv Regime não destinado ao do Fundo de contributivo, representando 32,8%, 15,6% e Equilíbrio 12,8% Municipal. respectivamente. crescimento é O Financeiro explicado, essencialmente, pela O acréscimo verificado na despesa regularização dos processos com de essencialmente da conjugação dos fixação de pensão de pessoal de 3,4%, resulta sobrevivência em atraso, pela seguintes factores: entrada de novos agentes e 1) Recrutamento de novos médicos actualização da pensão ao pelo abrigo não pagamento contributivo e pelo aumento isolamento salarial ocorrido no ano em referente a Outubro de 2007; 3) curso. inclusão de alguns aposentados no de regime Também comparticiparam neste Ministério INPS, da do subsídio aos cuja Saúde; 2) de professores entrada estava aumento as verbas destinadas condicionada à entrega de alguns à evacuação de doentes e as documentos e; 4) pelo aumento novas salarial de 2,5% atribuído em 2008. bolsas de estudos atribuídas nos finais do ano Relativamente aos Encargos da anterior; Dívida” verificou-se um acréscimo Em relação à transferência a em termos homólogos de 0,8% administração devido pública essencialmente ao (+13,5%), o acréscimo pagamento dos juros da dívida verificado é justificado externa em mais 5,3% e da dívida essencialmente pela interna em menos 0,9%. O aumento regularidade observada em dos juros da dívida externa ao período 2008, na transferência da taxa comparativamente ecológica cobrada pelo Estado homólogo é no principalmente pela ano em curso aos justificado entrada de municípios e pelo crescimento novos empréstimos no ano anterior. das do Quanto aos juros da divida interna o Estado seu decréscimo está directamente transferências Orçamento do relacionado com a diminuição dos Gabinete de Estudos e Estratégia Direcção Geral da Contabilidade Pública 15 Relatório de Conjuntura e Síntese da Execução Orçamental www.minfin.cv títulos do tesouro em circulação e utensílios e com a manutenção das taxas juros equipamentos. maquinaria e durante o ano, libertando assim, o montante orçamentado para cobrir a É de referir que a execução dos sub possível flutuação das taxas. – agrupamentos económicos da O aumento ocorrido na despesa de funcionamento poderá rubrica alterar com a afectação de valores subsídio corrente (em 595 milhões de CVE, em justificado termos pelo homólogos) pagamento que se encontram por regularizar. é da segunda prestação da dívida para Despesas de Investimentos com a Shell referente ao diferencial De dos combustíveis acumulado até Abril de 2006, cujo protocolo Geral do Tesouro com os dados preliminares de 2008, as despesas de de investimentos, cresceram 16,5% assumpção foi celebrado com a Direcção acordo em termos homólogos atingindo em 16.263,5 milhões de CVE, cerca de meados de Junho de 2007 e pelo 92,5% do orçado. O programa de défice tarifário referente ao ano 2008 investimento público no período em pago à Electra. análise foi financiado na sua maioria com recursos externos, cerca de Por sua vez, a despesa com a 71,9% “aquisição serviços “Empréstimos Externos” 35,4% e correntes” registou uma taxa de “Fundos de contrapartida da Ajuda variação homóloga negativa de 5,3%, Alimentar” 0,9% – e 28,1% com justificada recursos internos. de bens e principalmente, pela – “Donativos” 35,6%, diminuição verificada na aquisição de medicamentos para os hospitais, deslocações, consumo de secretaria, Numa análise dos grandes eixos de água e rendas e alugueres. desenvolvimento definidos na Estratégia de Crescimento e da de Redução da Pobreza, a criação de capital, a diminuição ocorrida de 8,8% infra-estruturas económicas e sector no período em análise, é justificada social pelas prioridades traçadas no OE de Relativamente às rubricas despesas ferramentas e Gabinete de Estudos e Estratégia foram as principais Direcção Geral da Contabilidade Pública 16 Relatório de Conjuntura e Síntese da Execução Orçamental www.minfin.cv 2008, destacando-se de seguida a Domingos execução a Estradas Janela Porto Novo”, “Duas natureza e custos dos investimentos, variantes Ribeirão Chiqueiro São essencialmente, Domingos”, alcançada segundo nos principais “, “Construção de “Ampliação do grandes eixos, nomeadamente, Infra- Aeroporto de Boavista – I Fase”, estruturas, do “Fase I do Porto da Praia” e Capital Humano, Boa Governação e “Estrada Norte Baia Calhau”; 10,7% Promoção do total, ou seja, cerca de 976,4 Desenvolvimento da Competitividade no milhões de CVE, para o programa período em análise: O eixo Infra – estruturas, cujo o objectivo principal é a consolidação e Picos análise, uma execução de 9.122,9 gestão representando Engenhos” e “Criação participativa das direccionados valor ao Desenvolvimento orçamentado para o respectivo eixo, Energético no OE 2008. do “, “Desenvolvimentos estruturas de principalmente projectos (reabilitação das 7,8% do Transportes” “Asfaltagem do vias da a apoiar Potência Suplementar para a Praia; Infra- direccionados destinado, Dessalinizadora e o aumento de programa das Sector ilha de Santiago, Aquisição de uma seja, 5.970,4 milhões de CVE foram o “ projectos de electrificação rural da estruturas cerca de 65,4% do total, ou para áreas programa fundamentalmente, Do valor executado no eixo das Infra- canalizados e cerca de 749,6 milhões de CVE, e correspondendo a um grau de do maiores protegidas”; 8,2% do total, ou seja, 56,1% do total executado no período 107,2% os valorização das bacias hidrográficas e renovável, atingiu no ano em de onde desastres naturais, “Ordenamento e distribuição de energia convencional execução Ambiente”, do municipais, “Programa ambiental e rodoviária e o aumento da produção e CVE, Conservação aos projectos “Planos ambientais e aeroportos, densificação da rede de e recursos foram alocados sobretudo internacionalização da rede de portos milhões “Protecção total, ou seja, 708,7 milhões de CVE, canalizados para o aos programa “Promoção e Reforço do Plateau Saneamento Praia), Básico”, destinados essencialmente aos projectos de “Reabilitação da Estrada de São Gabinete de Estudos e Estratégia Direcção Geral da Contabilidade Pública 17 Relatório de Conjuntura e Síntese da Execução Orçamental www.minfin.cv e referido eixo, saneamento; 7% dirigidos sobretudo milhões de aos projectos do apoio ao sector principalmente aos projectos de rodoviário e ao Fundo Autónomo de centros de saúde, luta contra sida, Manutenção os policlínica do Sal e saúde Santiago executados norte; 29,4% do total, ou seja, 875,9 estão enquadrados nos programas milhões de CVE, direccionados ao “Desenvolvimento programa abastecimento restantes de água Rodoviário, montantes do e Sistema de ou seja, CVE, 1.079,7 alocados “Consolidação, Transporte” e “ Ordenamento do Modernização e Expansão Território e Planeamento Urbanístico” Sistema com respectivamente 0,4% do total essencialmente aos projectos de executado. construções e equipamentos de Educativo”, do destinados escolas secundárias, alimentação para cantinas escolares e bolsas de No que tange ao eixo estudos; Desenvolvimento do Capital Humano, apresenta como os recursos fundamentais programa “Reduzir a Pobreza e Promover a Inclusão Social dos do país – os investimentos nesta área Grupos totalizaram 18,3% do total executado período, representando total, milhões de CVE, destinado ao o desenvolvimento económico e social no do correspondendo ao valor de 609,8 humanos para 20,5% Desfavorecidos”, enquadrados, uma fundamentalmente nos projectos de micro realizações – execução de 2.974,6 milhões de nomeadamente CVE, o que corresponde a um grau infra-estruturas rurais e calcetamento de estradas – de execução de 77,1% do total do e programa de luta contra a pobreza valor orçamento no respectivo eixo no meio rural; 5,4% do total, ou em 2008. seja, 159,6 milhões de CVE, destinados ao programa” Promoção Da execução conseguida no eixo – do Emprego, Formação Profissional Desenvolvimento do Capital Humano, e Qualificação”, alocados sobretudo cabe destacar o programa “ Reformar aos o Sistema para Reformar a Saúde “ profissional, programa de estágio com 36,3% do valor executado no profissional e promoção das micro- Gabinete de Estudos e Estratégia projectos de formação Direcção Geral da Contabilidade Pública 18 Relatório de Conjuntura e Síntese da Execução Orçamental www.minfin.cv empresas; e os restantes programas 21,5% do total direccionado ao com a execução global a volta de programa 249,5 milhões de CVE. Funcionamento da Justiça”, cujo o “ Melhoramento do valor global executado é de 375,9 milhões No diz respeito ao eixo – Boa ampliação transparência na gestão da coisa a segurança – cadeia casas de de São direito e construção do palácio de justiça de a Santa Cruz; 9,2% do total, ou seja, representação política, a reforma da e da Martinho, pública, a liberdade económica, o justiça alocados administração do cofre da justiça, objectivo principal abrange a ética e regional, CVE, essencialmente aos projectos da Governação/Reforma do Estado – o desenvolvimento de 160 milhões de CVE, canalizados o ao investimento nesta área alcançou programa Modernização 10,7% do total executado no período “Reforma das e Forças Armadas”, destinado sobretudo aos em análise, representando 1.744,7 projectos de construção de novos milhões de CVE, o que corresponde a comandos, centrais de munições e um grau de execução de 79,7% do explosivos e reparação de navio; valor orçamento no referido eixo em 7% do total, ou seja, 122,8 milhões 2008. de CVE canalizado ao programa Do investimento canalizado no eixo – ”Combate Boa Governação/Reforma do Estado, Droga importa referenciar o programa com Segurança”, maiores pesos: com 59,5% do total aos projectos de combate ao tráfico executado, ou seja, 1.037,3 milhões ilícito e a criminalidade organizada e de CVE ficou reservado ao programa a beneficiação da sede da Polícia “ da Judiciária; e os restantes programas destinado, alcançaram uma execução de cerca Reforma Administração e Modernização Pública”, fundamentalmente, aos projectos de modernização de a e Criminalidade Preservação destinado e a da sobretudo de 48,6 milhões de CVE. Administração pública, nomeadamente planificação Relativamente e consolidação do Nosi, unidade de orçamental; eixo – Competitividade, – este atravessa gestão do MCA, casa do cidadão e desconcentração ao os principais sectores de produção, com Gabinete de Estudos e Estratégia Direcção Geral da Contabilidade Pública 19 Relatório de Conjuntura e Síntese da Execução Orçamental www.minfin.cv com ênfase no sector terciário como competitividade, assistência técnica sector gerador de serviços e de às instituições de micro – finanças e emprego e destaca o turismo e o crédito agrícola; com 13,2% do total, papel ou seja, 228,9 milhões de CVE, do sector privado dinamização da investimento neste eixo, totalizou milhões de CVE, 1.728,2 representando economia na 10,6% do – absorvidos o pelo programa “Reorganização e Desenvolvimento das Pescas” essencialmente total destinados ao projecto executado, o que corresponde a um extensão do complexo da pesca, grau de execução de 76,1% do valor com 11,3% do total, ou seja, 195,9 orçamentado no referido eixo em milhões de CVE, direccionado ao 2008. programa Do investimento conseguido neste eixo, cabe salientar 54,2% do total “Promoção/Desenvolvimento do Turismo”, ao dirigido sobretudo projecto escola de hotelaria para executado, ou seja, cerca de 935,9 formação de futuros técnicos na milhões de CVE, absorvidos pelo área do turismo. programa “Modernização do Sector Agrário e Desenvolvimento Rural”, destinados essencialmente aos Financiamento projectos de construção de diques e reservatórios, ordenamento De Janeiro a Dezembro 2008, o e saldo global apresentou um deficit manutenção de perímetro florestais, projecto integrado de 1.175 milhões de CVE. Sendo de desenvolvimento assim, agro- 2.003 milhões de CVE, derivado e diversidade de cultura; com 14,6% essencialmente da entrada de um do total, ou seja, 252 milhões de ao grande volume de desembolsos programa para financiamento de projectos “Reforço da Capacidade de Gestão e do Desempenho alocados projectos da de estruturantes Económica”, principalmente crescimento do análise foi positivo em cerca de desenvolvimento do negócio agrícola canalizado financiamento Orçamento do Estado no ano em silvopastoricia, assistência técnica ao CVE, o desenvolvimento aos para do o país. A evolução dos depósitos do Governo e Central no sistema bancário, vem Gabinete de Estudos e Estratégia Direcção Geral da Contabilidade Pública 20 Relatório de Conjuntura e Síntese da Execução Orçamental www.minfin.cv permitindo à DGT resgatar alguns (em milhões de CVE) PRINCIPAIS INDICADORES DA DÍVIDA PÚBLICA títulos do mercado e contrariar a Dezembro pressão do mercado para a subida das taxas de juros, demonstrando uma posição de relativo conforto da 2008 Estoque Global 76.265,8 76.983,7 0,9% Dívida Interna 27.602,0 25.103,5 -9,1% Dívida Externa 48.663,8 51.880,2 6,6% Variação em valores absolutos -2.498,5 Dívida Externa 3.216,4 Estoque Global em % do PIB redução do crédito líquido ao 65,9% Variação Pontos percentuais Governo Central em torno de 16,5% % 717,9 Divida Interna Tesouraria e contribuindo para a Txa.cres. 2007 60,5% -5,4% Fonte: DGT-MF em termos homólogos. Numa análise desagregada, o stock da dívida interna, em finais de Dívida Pública Dezembro de 2008, situou-se em torno de 25.103,5 milhões de CVE, O stock da dívida pública totalizou uma diminuição de cerca de 2.498,5 76.983,7 milhões de CVE contra 76.265,8 milhões de CVE milhões de CVE face ao período em homólogo, justificada em parte pela Dezembro de 2007, uma taxa de meta de redução da dívida interna crescimento de 0,9%. O rácio da dívida pública/PIB registou em percentagem do PIB e por outro uma lado, diminuição de 5,4 p.p., isto é, de refinanciamento 65,9% para 60,5%, justificado na sua títulos que títulos de curto prazo ficassem Quanto ao rácio dívida interna/PIB a dos de levando a que alguns leilões de global primário e do PIB nominal. com política oneram o serviço da dívida interna, maioria pelas evoluções do saldo prosseguiu-se pela desertos. trajectória A estrutura da dívida interna em decrescente ancorada no instrumento Dezembro 2008 era composta em de Apoio à Política Económica e 80,4% por Obrigações do Tesouro, Financeira (Policy Support Instrument 12% por Bilhetes do Tesouro, outros – PSI) firmado com o FMI em Julho créditos 4% e 3,6% por Protocolos. de 2006. No que respeita ao stock da dívida externa, em 2008, este tem evidenciado uma evolução bastante Gabinete de Estudos e Estratégia Direcção Geral da Contabilidade Pública 21 Relatório de Conjuntura e Síntese da Execução Orçamental www.minfin.cv a apresso, o stock da dívida externa entrada de desembolsos assinados atingiu 51.880,2 milhões de CVE, em 2005, 2006 e 2007, para financiar um aumento de cerca de 3.216,4 projectos em áreas estruturantes para milhões de CVE, representando o uma taxa de crescimento de 6,6%, positiva essencialmente desenvolvimento nomeadamente, devido do país, reflectido infra-estruturas, numa estrutura predominantemente multilateral. transporte, saúde, energia e sector das reformas. No final do período em Gabinete de Estudos e Estratégia Direcção Geral da Contabilidade Pública 22 Relatório de Conjuntura e Síntese da Execução Orçamental www.minfin.cv QUADRO ESTATÍSTICO ANEXO AO RELATÓRIO Gabinete de Estudos e Estratégia Direcção Geral da Contabilidade Pública 23 II-QUADROS ANEXOS A CONTA PROVISÓRIA OPERAÇÕES FINANCEIRAS DO ESTADO Milhões de CVE 2007 2007 4º Trim prog.rev 1. RECEITAS TOTAIS prog. Exec. Taxa Var prog.rev Homologo 37.513 38.653 37.513 40.129 41.164 3,8% 29.182 26.731 24.178 2.553 2.450 8.332 8.332 33.289 28.908 26.220 2.689 4.381 5.312 3.749 1.563 52 29.182 26.731 24.178 2.553 2.450 8.332 8.332 33.218 32.205 29.585 2.620 1.013 6.430 4.790 1.640 481 33.899 31.254 28.059 3.196 2.645 7.265 7.265 -0,2% 11,4% 12,8% -2,5% -76,9% 21,0% 27,7% 4,9% 825,8% 40.154 37.208 40.382 41.304 44.322 11,0% 23.814 1.352 531 0 24.041 1.360 523 0 25.040 1.347 548 0 26.741 1.347 555 0 7,7% -0,9% 5,3% 16.340 23.245 1.360 520 0 655 13.963 16.340 16.264 17.581 -2.641 -2.641 -2,3 -2,3 -10.973 -13.423 5.368 2.917 -11.540 1.445 1.445 1,2 1,2 -3.867 -8.300 10.044 5.663 -6.368 -2.868 -2.868 -2,5 -2,5 -11.200 -13.651 5.140 2.690 -11.768 -1.175 -1.175 -0,9 -0,9 -7.604 -9.099 8.178 7.165 -6.722 -3.158 -3.158 -2,5 -2,5 -10.423 -13.068 7.158 4.513 -11.166 2.641 -1.304 2.868 2.003 3.158 3.243 5.156 200 -2.113 3.010 4.536 293 -1.819 3.470 5.156 200 -1.885 3.566 5.381 70 -1.886 3.277 5.204 23 -1.951 -602 398 -4.314 -6.415 -602 398 -1.563 -2.008 -119 1.1. Receitas orçamentais 1.1.1. Receitas correntes Receitas fiscais1 2 Receitas não fiscais 1.1.2. Receitas de capital 1.2. Donativos 1.2.1. A projectos de investimento 1.2.2. A. OE 1.3. Transferências de OFN3 2. DESPESAS TOTAIS 2 2.1. Despesas correntes das quais: Juros da dívida interna programados Juros da dívida externa programados Combustíveis Atrasados de Despesas de Funcionamento 2.2. Despesas de investimento 2.3. Despesas extraordinárias 2.3.1. Programa de Urgência4 das quais: Atrasados da despesa de Investimento 2.4. Resto por pagar 3. SALDO GLOBAL (base caixa; 1 - 2) 3. SALDO GLOBAL ( base compromisso) Saldo global em percentagem do PIB base caixa Saldo global em percentagem do PIB base compromisso Saldo global excluindo Donativos (3 - 1.2) Saldo global, excl. Donativos e Transf. de OFN (1.1 - 2) Saldo orçamental (1.1 - 2.1) Saldo corrente (1.1.1 - 2.1) Saldo primário (1.1 + 1.3 - 2 + Juros) Exec. 2008 4º Trim 4. FINANCIAMENTO 4.1. Externo (líquido) Desembolsos Reembolso de Empréstimo de Retrocessão Amortizações programadas Variação de atrasados (aumento: +) dos quais: Novos atrasados Atrasados anteriores Alívio da dívida 4.2. Interno (líquido) Sistema bancário Empréstimos correntes Amortizações programadas Resto por pagar que transita p/ o ano seguinte Pagamento de atrasados Emprestimos concedidos Variação de atrasados (aumento: +) Sistema não bancario Novos empréstimos Amortizações programadas -100,0% 16,5% 2.198 -50 2.101 -1.000 496 -1.000 -2.317 Receitas das privatizações Encargos com a reestruturação de empresas públicas5 5. DIFERENCIAL DE FINANCIAMENTO / DISCREPÂNCIA (3 + 4) 0 141 0 828 0 para memória: DÍVIDA PÚBLICA (em % do PIB) Interna da qual: TCMF 7 Externa ----- ----- ----- Fonte: MF, BCV 24 RECEITAS ORÇAMENTAIS Milhões de CVE exec. 1. Receitas Fiscais 2007 - 4º Trim. 2008 - 4º Trim. grau ex.(%) grau ex.(%) 1ºT.05e/05pr prog ini prog. revist. exec. 1ºT.05e/05pr prog ini Variaçao Homologo prog. revist. 26.220 108,4 24.178 24.178 29.585 105,4 28.059 28.059 12,8% 26.083 7.655 7.655 4.505 3.150 108,4 102,1 102,1 115,1 87,9 24.064 7.497 7.497 3.914 3.583 24.064 7.497 7.497 3.914 3.583 29.400 8.525 8.525 4.824 3.701 105,3 100,7 100,7 102,6 98,5 27.913 8.462 8.462 4.703 3.759 27.913 8.462 8.462 4.703 3.759 12,7% 11,4% 11,4% 7,1% 17,5% 18.427 111,2 16.567 16.567 20.876 107,3 19.450 19.450 13,3% 9.917 1.654 5.376 5.376 1.479 63 63 74,1 115,2 108,1 98,5 98,5 152,6 55,5 55,5 8.610 1.530 5.458 5.458 969 114 114 8.610 1.530 5.458 5.458 969 114 114 11.723 1.798 5.888 5.888 1.466 184 184 0 103,2 99,0 105,5 105,5 212,2 174,2 174,2 11.360 1817 5.583 5.583 691 106 106 40 11.360 1817 5.583 5.583 691 106 106 40 2.689 105,3 2.553 2.553 2.620 82,0 3.196 3.196 18,2% 8,7% 9,5% 9,5% -0,9% 192,7% 192,7% -2,5% Taxas e Preços Públicos, Multas e Outras Penalidades1.863 Rendimentos de Propriedade/Rendimentos Financeiros 550 Cotização para Fundo de Previdência 87 Transferências correntes 54 Venda de bens e serviços correntes 46 Receitas autónomas 3 Outras receitas correntes 90 1197 633 151 333 43 1197 633 151 333 43 1.820 522 51 44 36 1950 423 151 154 58 -2,3% -5,1% -41,2% -17,1% -22,6% 195 195 148 460 460 64,1% 26.731 26.731 32.205 93,3 123,4 33,7 28,7 61,4 32,1 103,0 1950 423 151 154 58 28.908 155,5 86,9 57,2 16,1 106,3 46,1 108,1 31.254 31.254 11,4% 4.381 4.381 178,8 178,8 2.450 2.450 2.450 2.450 1.013 1.013 38,3 38,3 2.645 2.645 2.645 2.645 -76,9% -76,9% 33.289 114,1 29.181 29.181 33.218 98,0 33.899 33.899 -0,2% 82,9 25,7 0,0 29,5 8,7 82,9 25,7 0,0 29,5 8,7 89,1 25,7 0,0 35,3 7,9 82,8 25,0 0,0 33,5 9,4 82,8 25,0 0,0 33,5 9,4 91,6 8,4 100,0 91,6 8,4 100,0 97,0 3,0 100,0 92,2 7,8 100,0 92,2 7,8 100,0 Impostos Impostos sobre o rendimento Imposto único sobre rendimentos IUR-Pessoas Singulares IUR-Pessoas Colectivas Outros impostos sobre os rendimentos Impostos Indirectos Impostos sobre a despesa Imposto sobre o valor acrescentado Imposto sobre bens e serviços Impostos sobre transacções internacionais Direitos de importação Imposto de selo Outras receitas fiscais Taxas, Multas e Outras Penalidades Outras receitas fiscais 2. Receitas não Fiscais RECEITAS CORRENTES TOTAIS 3. Receitas de capital Outras receitas de capital Privatizações Terrenos RECEITAS ORÇAMENTAIS TOTAIS Decomposição percentual Receitas Fiscais Impostos sobre o rendimento Impostos sobre a despesa Imposto sobre o valor acrescentado Receitas não Fiscais Receitas correntes totais Receitas de capital Receitas orçamentais totais 78,8 23,0 0,0 29,8 8,1 86,8 13,2 100,0 -------- -------- Fonte: MF( DGCI e DGT) 25 DESPESAS PÚBLICAS CORRENTES Milhões de CVE 2007 - 4º Trim. Despesas com Pessoal Remunerações Certas e Permanente Remunerações Variaveis Segurança Social Outras Despesas c/pessoal Aquisição de bens e serviços Juros correntes Dívida interna Dívida externa Outros Encargos Transferências correntes Transfeência administração Pública Transferência Privada Transferência as familias dos quais: Bolsas de estudo Transferência ao Exterior Subsidios dos quais: Combustíveis Outras despesas correntes Despesas de capital Valor a regularizar2 Pagamento de atrasados DESPESAS CORRENTES TOTAIS Variaçao Homologo prog. Ini prog. rev. 96,4 98,2 94,2 74,2 6,2 102,4 99,2 100,0 99,5 6,7 92,6 88,7 104,0 82,1 83,8 90,9 100,0 11.324 9.896 677 328 422 2.127 1.896 1.352 531 13 5.479 3.070 110 2.267 500 32 263 11.314 10.168 705 329 113 2.113 1.896 1.360 523 13 5.599 3.043 109 2.409 425 38 337 11.273 10.305 645 317 6 2.048 1.896 1.347 548 1 6.154 3.065 270 2.247 375 198 932 92,4 96,2 88,5 75,1 1,7 80,6 99,6 100,0 98,8 54,3 93,9 91,8 94,7 99,9 78,9 96,8 100,0 12.262 10.430 681 373 778 2.334 2.074 1.487 566 20 6.394 3.351 304 2.111 475 153 707 12.195 10.713 729 422 330 2.541 1.904 1.347 555 2 6.551 3.338 285 2.248 475 205 932 73,7 100,3 96,6 2.513 211 2.614 196 2.337 179 220 3.100 143 0 2.378 240 0 23.814 24.068 25.040 98,3 74,6 93,6 27.014 26.741 Exec grau ex.(%) 10.902 9.987 664 244 7 2.163 1.881 1.360 520 1 5.183 2.701 113 1.979 356 35 337 0 1.927 196 655 23.245 2008 - 4º Trim. Exec grau ex.(%) prog. Iniprog. rev. 3,4 3,2 -2,9 29,9 -5,3 0,8 -0,9 5,3 34,8 18,7 13,5 139,3 13,6 5,2 470,2 176,6 21,3 -8,8 7,7 Decomposição percentual Despesas com Pessoal Bens e serviços Juros correntes programados Dívida interna Dívida externa Outros Encargos Transferências correntes Despesas autónomas Outras despesas correntes Valor a regularizar Despesas correntes totais 46,9 9,3 8,1 5,8 2,2 ------ 47,6 8,9 8,0 5,7 2,2 47,0 8,8 7,9 5,7 2,2 45,0 8,2 7,6 5,4 2,2 ------ 45,4 8,6 7,7 5,5 2,1 45,6 9,5 7,1 5,0 2,1 22,3 1,4 8,3 ---- 23,0 0,0 10,6 23,3 0,0 10,9 24,6 0,0 9,3 ---- 23,7 0,0 11,5 24,5 0,0 8,9 100,0 -- 100,0 100,0 100,0 -- 100,0 100,0 26 ANO:2008 Periodo:4º Trimestre MAPA A - FLUXOS FINANCEIROS NO TESOURO Em ECV Cod Entradas Saldo de ano anterior De Conta Orçamento do Estado Receitas Orçamentais: Receitas Correntes Receitas de Capital: AAL OFN AOR DON Outras Receitas de Capitais Operações Financeiras Emissão de BT e OT Emprestimos Externo Importancia Parcial Total 7.198.300.000 7.198.300.000 40.129.173.126 32.205.080.396 7.924.092.730 216.858.490 481.408.888 1.640.191.875 4.572.651.789 1.012.981.688 Cod Despesas Orçamentais: Despesas Correntes Mapa I Despesa Capital Despesas PPIP Mapa I Anexo Mapa I 14.906.743.622 Mapa A.1 Mapa A.3 70.488.712 645.055.442 Operações Financeiras Pagamentos BT e OT Amortização Emprestimos Emprestimos Interno Outras Operações Outras Operações por pagar Saldo para o periodo seguinte Na Conta Orçamento do Estado (2) Valor a reconciliar entre DGCI e o Tesouro (1) TOTAL (1) Receitas contabilizados por reconciliar entre DGCI e Tesouro (2) Saldo Final da Conta Orçamento do Estado é Provisório -828.304.461 Cod 41.303.964.232 24.861.410.599 178.973.998 16.263.579.635 Mapa II Mapa II Mapa A.4 0 Mapa A.2 8.809.910.004 5.381.289.464 Reembolso Empr. Retrocessão Outras Operações Saidas Importancia Parcial Total 13.487.148.055 10.906.157.643 1.885.934.970 50.000.000 578.106.366 66.949.076 Mapa A.1 6.614.800.000 6.614.800.000 -828.304.461 61.405.912.287 TOTAL 61.405.912.287 MAPA A.1_BILHETES DO TESOURO E OBRIGAÇÕES DO TESOURO EMITIDOS 4º TRIMESTRE 2008 Class.Econom2 Ec - Despesas Internas Económica2 Descrição Ec_Bilhetes do Tesouro Ec_Obrigações do Tesouro Ec_Receitas Interna Ec_Bilhetes do Tesouro Ec_Obrigações do Tesouro Total Geral Em ECV DESPESAS RECEITAS 7.650.902.426 925.100.000 8.576.002.426 6.438.310.004 2.205.000.000 8.643.310.004 8.576.002.426 8.643.310.004 MAPA A.3 - DESEMBOLSOS EFECTUADOS DURANTE O 4º TRIMESTRE ANO 2008 (EM ESCUDOS) DESEMBOLSOS EFECTUADOS DURANTE O ANO 2008 (EM ESCUDOS) Credor N.R. Nºchav Nºacordo Dia Mês Moeda de Desembolso Cambio Valor em Escudos Moeda do Empréstimo BADEA 134 2003002 347 12 2 28.124,97 EURO 110,265 3.101.199,82 41.501,52 USD BADEA 134 2003002 347 15 2 11.082,09 EURO 110,265 1.221.966,65 16.506,83 USD BADEA 134 2003002 347 7 3 9.162,56 EURO 110,265 1.010.309,68 14.193,56 USD BADEA 134 2003002 347 18 4 432.989,70 CVE 1,000 432.989,70 6.232,63 USD BADEA 134 2003002 347 18 4 432.989,70 CVE 1,000 432.989,70 6.232,63 USD BADEA 134 2003002 347 18 4 1.329.085,75 CVE 1,000 1.329.085,75 19.131,41 USD BADEA 134 2003002 347 18 4 523.699,00 CVE 1,000 523.699,00 7.538,34 USD BADEA 134 2003002 347 25 4 432.989,70 CVE 1,000 432.989,70 6.153,00 USD BADEA 134 2003002 347 28 4 9.162,56 EURO 110,265 1.010.309,68 14.619,87 USD BADEA 134 2003002 347 1 5 USD 70,657 2.156,45 30,52 USD BADEA 134 2003002 347 7 5 16.276,22 EURO 110,265 1.794.697,40 25.338,69 USD BADEA 134 2003002 347 10 6 1.794.697,00 CVE 1,000 1.794.697,00 25.386,74 USD BADEA 134 2003002 347 3 7 24,00 USD 69,862 1.676,69 24,00 USD BADEA 134 2003002 347 14 7 16,12 USD 69,735 1.124,13 16,12 USD BADEA 134 2003002 347 21 7 71,00 USD 69,818 4.957,08 71,00 USD BADEA 134 2003002 347 23 7 10.515,50 EURO 110,265 1.159.491,61 16.740,68 USD BADEA 134 2003002 347 23 7 11.277,00 EURO 110,265 1.243.458,41 17.952,98 USD BADEA 134 2003002 347 23 7 29.162,39 EURO 110,265 3.215.590,93 46.426,52 USD BADEA 134 2003002 347 23 7 6.597,34 EURO 110,265 727.455,70 10.573,97 USD 30,52 BADEA 134 2003002 347 28 7 39,58 USD 70,182 2.777,80 39,58 USD BADEA 134 2003002 347 6 8 532.911,00 CVE 1,000 532.911,00 7.860,48 USD BADEA 134 2003002 347 6 8 496.927,00 CVE 1,000 496.927,00 7.285,89 USD BADEA 134 2003002 347 6 8 311.767,00 CVE 1,000 311.767,00 4.571,10 USD BADEA 134 2003002 347 6 8 3.215.591,00 CVE 1,000 3.215.591,00 47.394,32 USD BADEA 134 2003002 347 12 8 22,31 USD 73,552 1.640,95 22,31 USD BADEA 134 2003002 347 10 9 35,38 USD 78,060 2.761,76 35,38 USD BADEA 134 2003002 347 6 11 121.054,76 EURO 110,265 13.348.103,11 155.918,54 USD BADEA 134 2003002 347 6 11 22.722,58 EURO 110,265 2.505.505,28 29.266,68 USD BADEA 134 2003002 347 6 11 78.562,58 EURO 110,265 8.662.702,88 101.246,56 USD BADEA 134 2003002 347 18 11 13.348.104,00 CVE 1,000 13.348.104,00 157.652,29 USD BADEA 134 2003002 347 18 11 2.505.505,00 CVE 1,000 2.505.505,00 29.592,11 USD BADEA 134 2003002 347 18 11 8.662.703,00 CVE 1,000 8.662.703,00 102.629,05 USD BADEA 134 2003002 347 15 12 28,19 USD 82,758 2.332,95 28,19 USD BADEA 134 2003002 347 31 12 42,29 USD 78,314 3.311,90 42,29 USD Sub Total 73.043.489,70 BADEA 139 20000003 279 3 1 162.694,63 EURO 110,265 17.939.523,38 240.498,93 USD BADEA 139 20000003 279 13 2 236.579,73 EURO 110,265 26.086.463,93 345.757,62 USD BADEA 139 20000003 279 13 2 21.252,07 EURO 110,265 2.343.359,50 31.077,78 USD BADEA 139 20000003 279 22 2 249.967,33 EURO 110,265 27.562.647,64 371.521,45 USD BADEA 139 20000003 279 26 3 230.703,33 EURO 110,265 25.438.502,68 363.516,17 USD BADEA 139 20000003 279 26 3 16.878,00 EURO 110,265 1.861.052,67 26.612,98 USD BADEA 139 20000003 279 17 4 372.819,71 CVE 1,000 372.819,71 5.386,52 USD BADEA 139 20000003 279 18 4 3.010.334,77 CVE 1,000 3.010.334,77 43.332,00 USD BADEA 139 20000003 279 18 4 2.306.510,21 CVE 1,000 2.306.510,21 33.200,86 USD BADEA 139 20000003 279 18 4 3.353.973,96 CVE 1,000 3.353.973,96 48.278,48 USD BADEA 139 20000003 279 18 4 485.410,20 CVE 1,000 485.410,20 6.987,19 USD BADEA 139 20000003 279 18 4 385.503,86 CVE 1,000 385.503,86 5.549,10 USD BADEA 139 20000003 279 18 4 3.270.664,69 CVE 1,000 3.270.664,69 47.079,30 USD BADEA 139 20000003 279 18 4 3.543.768,99 CVE BADEA 139 20000003 279 13 5 BADEA 139 20000003 279 13 5 BADEA 139 20000003 279 5 6 BADEA 139 20000003 279 3 6 BADEA 139 20000003 279 17 BADEA 139 20000003 279 BADEA 139 20000003 BADEA 139 BADEA 582.831,84 EURO 3.543.768,99 51.010,47 USD 64.265.952,84 907.197,76 USD 1,000 8.262.765,35 116.151,63 USD 110,265 1.654.826,25 23.542,07 USD 342.785,45 CVE 1,000 342.785,45 4.831,02 USD 6 15,77 USD 71,428 1.126,42 15,77 USD 17 6 15,77 USD 71,428 1.126,42 15,77 USD 279 1 7 15,99 USD 70,048 1.120,07 15,99 USD 20000003 279 14 7 9,67 USD 69,735 674,34 9,67 USD 139 20000003 279 12 8 346.652,35 CVE 1,000 346.652,35 5.019,80 USD BADEA 139 20000003 279 12 8 110,265 1.666.878,21 23.105,89 USD BADEA 139 20000003 279 25 8 74,564 1.737,34 23,30 USD BADEA 139 20000003 279 3 9 110,265 63.457.761,11 845.192,13 USD BADEA 139 20000003 279 5 9 8.158.854,94 CVE 1,000 8.158.854,94 111.367,22 USD BADEA 139 20000003 279 8 10 34,27 USD 80,988 2.775,46 34,27 USD BADEA 139 20000003 279 14 10 31,20 USD 80,946 2.525,52 31,20 USD BADEA 139 20000003 279 28 10 37,82 USD 88,596 3.350,70 37,82 USD BADEA 139 20000003 279 20 11 110,265 9.152.857,27 105.295,42 USD Sub Total 8.262.765,35 CVE 1,000 110,265 15.007,72 EURO 15.117,02 EURO 23,30 USD 575.502,30 EURO 83.007,82 EURO 275.284.306,21 MAPA A.3 - DESEMBOLSOS EFECTUADOS DURANTE O 4º TRIMESTRE ANO 2008 (EM ESCUDOS) Credor N.R. Nºchav Nºacordo Dia Mês Moeda de Desembolso BADEA 142 2004003 383 1 4 BADEA 142 2004003 383 18 4 BADEA 142 2004003 383 18 BADEA 142 2004003 383 18 BADEA 142 2004003 383 BADEA 142 2004003 383 BADEA 142 2004003 383 BADEA 142 2004003 383 9 7 BADEA 142 2004003 383 16 7 BADEA 142 2004003 383 6 BADEA 142 2004003 383 BADEA 142 2004003 383 BADEA 142 2004003 BADEA 142 BADEA 142 71.342,35 EURO Cambio Valor em Escudos Moeda do Empréstimo 110,265 7.866.564,22 113.220,12 USD 20.958.817,00 CVE 1,000 20.958.817,00 301.689,86 USD 4 9.690.911,00 CVE 1,000 9.690.911,00 139.494,97 USD 4 10.253.603,00 CVE 1,000 10.253.603,00 147.594,59 USD 22 5 31,85 USD 70,097 2.232,59 31,85 USD 2 7 47,50 USD 70,000 3.325,00 47,50 USD 3 7 110,265 31.466.256,89 451.525,39 USD 57.810.821,00 CVE 1,000 57.810.821,00 818.290,64 USD 62.750,00 USD 69,060 4.333.515,00 62.750,00 USD 8 17.134.931,00 CVE 1,000 17.134.931,00 246.688,45 USD 11 8 39,43 USD 73,250 2.888,25 39,43 USD 28 8 29,61 USD 74,771 2.213,97 29,61 USD 383 5 9 18,12 USD 76,209 1.380,91 18,12 USD 2004003 383 10 9 43,00 USD 78,060 3.356,58 43,00 USD 2004003 383 5 11 39,43 USD 86,111 3.395,36 39,43 USD 285.369,40 EURO Sub Total 159.534.211,76 BM/IDA 133 2003001 37550 28 2 142.573,59 USD 73,396 10.464.331,21 89.653,70 DTS BM/IDA 133 2003001 37550 3 3 359.923,83 USD 72,802 26.203.174,67 224.591,64 DTS BM/IDA 133 2003001 37550 18 6 413.361,85 USD BM/IDA 133 2003001 37550 30 6 42.015,00 EURO BM/IDA 133 2003001 37550 28 7 BM/IDA 133 2003001 37550 14 BM/IDA 133 2003001 37550 BM/IDA 133 2003001 37550 71,345 29.491.301,19 256.202,26 DTS 110,265 4.632.783,98 40.600,67 DTS 44.702,33 USD 70,182 3.137.298,92 27.511,16 DTS 8 15.583,23 USD 74,089 1.154.545,93 9.854,63 DTS 20 10 69.519,71 USD 82,364 5.725.921,39 45.648,06 DTS 4 12 20.811,70 USD 87,453 1.820.045,60 14.048,20 DTS Sub Total 82.629.402,89 BM/IDA 152 2005003 4064 13 3 865.409,75 USD 71,345 61.742.658,61 531.278,24 DTS BM/IDA 152 2005003 4064 13 5 896.941,98 USD 71,562 64.186.961,97 548.843,49 DTS BM/IDA 152 2005003 4064 1 7 33.404.820,00 CVE 1,000 33.404.820,00 294.886,83 DTS BM/IDA 152 2005003 4064 1 7 110,265 33.404.821,45 292.703,51 DTS BM/IDA 152 2005003 4064 5 8 1,000 8.107.956,00 71.122,56 DTS BM/IDA 152 2005003 4064 5 8 110,265 8.107.954,16 70.680,00 DTS BM/IDA 152 2005003 4064 22 9 700.000,00 USD 77,556 54.289.200,00 446.813,26 DTS BM/IDA 152 2005003 4064 29 12 10.000,00 USD 78,986 789.860,00 6.478,28 DTS 302.950,36 EURO 8.107.956,00 CVE 73.531,53 EURO Sub Total 264.034.232,19 BM/IDA 158 20070001 3629-1 15 1 294.348,15 USD 74,129 21.819.734,01 185.873,96 DTS BM/IDA 158 20070001 3629-1 25 1 40.785,14 USD 75,300 3.071.121,04 25.815,67 DTS BM/IDA 158 20070001 3629-1 21 2 120.174,19 USD 75,336 9.053.442,78 75.869,46 DTS BM/IDA 158 20070001 3629-1 25 2 402.574,25 USD 74,364 29.937.031,53 254.532,85 DTS BM/IDA 158 20070001 3629-1 16 4 283.494,40 USD 69,766 19.778.270,31 172.629,81 DTS BM/IDA 158 20070001 3629-1 16 4 168.752,73 USD 69,766 11.773.202,96 102.759,53 DTS BM/IDA 158 20070001 3629-1 5 6 180.675,04 USD 71,396 12.899.475,16 111.144,29 DTS BM/IDA 158 20070001 3629-1 18 7 103.468,71 USD 69,673 7.208.975,43 62.952,11 DTS BM/IDA 158 20070001 3629-1 8 8 159.847,20 USD 71,373 11.408.774,21 99.155,26 DTS BM/IDA 158 20070001 3629-1 6 10 189.303,95 USD 74,079 14.023.447,31 123.342,73 DTS BM/IDA 158 20070001 3629-1 20 10 140.637,16 USD 82,364 11.583.439,05 92.345,22 DTS BM/IDA 158 20070001 3629-1 10 12 53.102,69 USD 85,991 4.566.353,42 35.612,14 DTS BM/IDA 158 20070001 3629-1 15 12 230.100,13 USD 82,758 19.042.626,56 152.623,74 DTS BM/IDA 160 20070003 3755-1 30 1 400.000,00 USD 74,741 29.896.400,00 BM/IDA 160 20070003 3755-1 31 7 72.856,94 USD 70,834 5.160.748,49 44.766,17 DTS BM/IDA 160 20070003 3755-1 14 8 220.987,01 USD 74,089 16.372.706,58 139.749,33 DTS BM/IDA 160 20070003 3755-1 20 10 202.568,93 USD 82,364 16.684.387,35 133.010,89 DTS BM/IDA 160 20070003 3755-1 10 12 93.056,71 USD 85,991 8.002.039,55 62.406,42 DTS Sub Total 176.165.893,76 Sub Total BM/IDA 251.952,63 DTS 76.116.281,97 171 20080006 44340 CV 14 10 9.461.696,00 USD 80,744 Sub Total 763.975.181,82 6.200.000,00 DTS 763.975.181,82 BM/IDA 170 20080005 44880 CV 22 9 1.935.771,34 USD 77,556 150.130.682,05 1.235.611,87 DTS BM/IDA 170 20080005 44880 CV 29 12 1.303.976,48 USD 78,986 102.995.886,25 844.752,26 DTS Sub Total 253.126.568,29 CEDEAO 145 2004004 5 17 3 240.208.136,00 FCFA- XOF0,168 CEDEAO 145 2004004 5 31 5 CEDEAO 145 2004004 5 9 7 CEDEAO 145 2004004 5 9 CEDEAO 145 2004004 5 9 Sub Total 2.820.554,60 CVE 40.378.987,66 349.906,00 UC 1,000 2.820.554,60 24.595,00 UC 20.528,05 EURO 110,265 2.263.525,43 19.843,00 UC 7 61.397,40 EURO 110,265 6.769.984,31 59.349,00 UC 7 24.204,66 EURO 110,265 2.668.926,83 23.397,00 UC 54.901.978,84 MAPA A.3 - DESEMBOLSOS EFECTUADOS DURANTE O 4º TRIMESTRE ANO 2008 (EM ESCUDOS) Credor N.R. Nºchav Nºacordo Dia Mês Moeda de Desembolso CEDEAO 147 2004008 6 25 2 CEDEAO 147 2004008 6 18 3 47.560,00 UC Cambio Valor em Escudos Moeda do Empréstimo 131,964 6.276.197,61 47.560 UC 11.677.578,00 FCFA- XOF0,168 1.963.000,86 17.004 UC CEDEAO 147 2004008 6 18 3 1.935.147,00 FCFA- XOF0,168 325.298,21 2.817 UC CEDEAO 147 2004008 6 27 3 36.242.577,00 FCFA- XOF0,168 6.092.377,19 52.968 UC CEDEAO 147 2004008 6 27 3 219.098.843,00 FCFA- XOF0,168 36.830.515,51 320.213 UC CEDEAO 147 2004008 6 21 4 8.934.215,00 FCFA- XOF0,168 1.501.841,54 13.196 UC CEDEAO 147 2004008 6 5 5 7.323,27 EURO 110,265 807.500,37 6.989 UC CEDEAO 147 2004008 6 20 5 7.323,27 EURO 110,265 807.500,37 7.035 UC CEDEAO 147 2004008 6 20 5 19.507,79 EURO 110,265 2.151.026,46 18.740 UC CEDEAO 147 2004008 6 21 5 6.502,60 EURO 110,265 717.009,19 6.247 UC CEDEAO 147 2004008 6 30 5 2.989,08 EURO 110,265 329.590,91 2.860 UC CEDEAO 147 2004008 6 30 5 56.091,61 EURO 110,265 6.184.941,38 53.673 UC CEDEAO 147 2004008 6 30 5 2.000,26 EURO 110,265 220.558,67 1.914 UC CEDEAO 147 2004008 6 30 5 666,76 EURO 110,265 73.520,29 638 UC CEDEAO 147 2004008 6 30 5 15.033,31 EURO 110,265 1.657.647,93 14.385 UC CEDEAO 147 2004008 6 30 5 5.011,11 EURO 110,265 552.550,04 4.795 UC CEDEAO 147 2004008 6 17 9 27.619,12 EURO 110,265 3.045.422,27 25.362 UC CEDEAO 147 2004008 6 30 9 92.781,01 EURO 110,265 10.230.498,07 85.218 UC CEDEAO 147 2004008 6 3 10 6.054.012,00 FCFA- XOF0,168 1.017.074,02 8.315 UC CEDEAO 147 2004008 6 7 11 36.817,71 EURO 110,265 4.059.704,79 31.601 UC CEDEAO 147 2004008 6 27 11 4.020,68 EURO 110,265 Sub Total 443.340,28 85.287.115,96 FAD 132 2002003 2100150006944 16 1 24.874,96 EURO 110,265 FAD 132 2002003 2100150006944 18 1 25.060,18 EURO 110,265 2.763.260,75 FAD 132 2002003 2100150006944 21 2 93.312,97 EURO 110,265 10.289.154,64 FAD 132 2002003 2100150006944 29 2 18.690,00 EURO 110,265 2.060.852,85 FAD 132 2002003 2100150006944 3 3 18.837,87 EURO 110,265 2.077.157,74 FAD 132 2002003 2100150006944 29 4 70,657 11.021.564,98 FAD 132 2002003 2100150006944 9 7 74.396,61 EURO 110,265 8.203.342,20 FAD 132 2002003 2100150006944 10 7 76.487,94 EURO 110,265 8.433.942,70 FAD 132 2002003 2100150006944 29 7 11.794,86 EURO 110,265 1.300.560,24 FAD 132 2002003 2100150006944 7 8 40.245,50 EURO 110,265 4.437.670,06 FAD 132 2002003 2100150006944 1 9 29.577.884,00 JPY 0,689 20.374.429,61 FAD 132 2002003 2100150006944 5 9 6.489.196,00 JPY 0,704 155.986,88 USD Sub Total 3.474 UC 725.004,00 2.742.837,46 4.568.653,55 78.273.426,78 FIDA 113 1999006 510-CV 31 1 381.598,97 USD 74,554 28.449.729,61 239.206,50 DTS FIDA 113 1999006 510-CV 21 4 468.307,03 USD 69,977 32.770.721,04 285.408,62 DTS Sub Total 61.220.450,65 ICO 154 2005103 6 3 152.096,36 EURO 110,265 16.770.905,14 ICO 154 2005103 4 4 32.795,92 EURO 110,265 3.616.242,12 32.795,92 EURO ICO 154 2005103 6 6 60.367,00 EURO 110,265 6.656.367,26 60.367,00 EURO ICO 154 2005103 23 7 33.576,71 EURO 110,265 3.702.335,93 33.576,71 EURO ICO 154 2005103 29 10 190.167,30 EURO 110,265 20.968.797,33 190.167,30 EURO ICO 154 2005103 3 11 258.156,99 EURO 110,265 28.465.680,50 258.156,99 EURO ICO 154 2005103 30 12 446.469,22 EURO 110,265 49.229.928,54 446.469,22 EURO Sub Total 152.096,36 EURO 129.410.256,82 OPEC 112 1999005 764P 8 10 25.560.000,00 CVE 1,000 25.560.000,00 321.239,43 USD OPEC 112 1999005 764P 6 11 328.020,00 CVE 1,000 328.020,00 3.849,67 USD OPEC 112 1999005 764P 18 12 396.180,00 CVE 1,000 396.180,00 5.174,99 USD Sub Total 26.284.200,00 OPEC 138 2004001 965P 17 1 830.598,30 CVE 1,000 830.598,30 OPEC 138 2004001 965P 17 1 413.440,00 CVE 1,000 413.440,00 5.679,74 USD OPEC 138 2004001 965P 18 1 2.632.746,30 CVE 1,000 2.632.746,30 36.082,80 USD OPEC 138 2004001 965P 29 1 7.642.996,50 CVE 1,000 7.642.996,50 104.396,58 USD OPEC 138 2004001 965P 29 2 13.157.501,00 CVE 1,000 13.157.501,00 183.129,16 USD OPEC 138 2004001 965P 26 3 34.409.964,00 CVE 1,000 34.409.964,00 491.153,77 USD OPEC 138 2004001 965P 22 4 9.990.029,00 CVE 1,000 9.990.029,00 145.561,21 USD OPEC 138 2004001 965P 30 5 10.360.905,00 CVE 1,000 10.360.905,00 151.108,94 USD OPEC 138 2004001 965P 18 7 19.892.695,00 CVE 1,000 19.892.695,00 292.647,65 USD OPEC 138 2004001 965P 18 7 12.921.262,10 CVE 1,000 12.921.262,10 190.097,35 USD OPEC 138 2004001 965P 18 7 206.720,00 CVE 1,000 206.720,00 3.040,17 USD OPEC 138 2004001 965P 18 7 118.656,90 CVE 1,000 118.656,90 1.745,06 USD OPEC 138 2004001 965P 6 8 16.530.919,10 CVE 1,000 16.530.919,10 242.835,34 USD OPEC 138 2004001 965P 6 8 9.956.276,00 CVE 1,000 9.956.276,00 146.390,08 USD OPEC 138 2004001 965P 14 10 1.879.643,00 CVE 1,000 1.879.643,00 23.691,30 USD OPEC 138 2004001 965P 1 12 110,265 3.165.917,65 37.101,52 USD 28.711,90 EURO Sub Total 11.410,58 USD 144.110.269,85 OPEC 140 2004005 973P 18 1 13.947.259,76 CVE 1,000 13.947.259,76 191.152,59 USD OPEC 140 2004005 973P 5 2 5.652.232,00 CVE 1,000 5.652.232,00 77.806,02 USD Sub Total 19.599.491,76 MAPA A.3 - DESEMBOLSOS EFECTUADOS DURANTE O 4º TRIMESTRE ANO 2008 (EM ESCUDOS) Credor N.R. Nºchav Nºacordo Dia Mês Moeda de Desembolso Cambio Valor em Escudos Moeda do Empréstimo OPEC 155 2005004 1054 7 3 292.901,90 CVE 1,000 292.901,90 4.101,08 USD OPEC 155 2005004 1054 11 3 4.469.713,97 CVE 1,000 4.469.713,97 63.699,60 USD OPEC 155 2005004 1054 11 3 60.804,16 EURO 110,265 6.704.570,70 93.760,01 USD OPEC 155 2005004 1054 17 3 33.497,08 EURO 110,265 3.693.555,53 52.265,49 USD OPEC 155 2005004 1054 25 3 1,000 651.803,98 9.347,01 USD OPEC 155 2005004 1054 20 5 30.639,67 EURO 110,265 3.378.483,21 47.497,62 USD OPEC 155 2005004 1054 29 5 8.607,67 EURO 110,265 949.124,73 13.578,60 USD OPEC 155 2005004 1054 30 5 763.695,31 CVE 1,000 763.695,31 11.081,60 USD OPEC 155 2005004 1054 9 6 18.224.810,80 CVE 1,000 18.224.810,80 259.863,65 USD OPEC 155 2005004 1054 9 6 110.184,49 EURO 110,265 12.149.492,79 170.819,01 USD OPEC 155 2005004 1054 22 7 15.144,17 EURO 110,265 1.669.871,91 24.136,78 USD OPEC 155 2005004 1054 24 7 1,000 294.683,22 4.287,45 USD OPEC 155 2005004 1054 28 8 110,265 7.431.755,15 98.901,35 USD OPEC 155 2005004 1054 29 8 OPEC 155 2005004 1054 7 10 OPEC 155 2005004 1054 8 10 OPEC 155 2005004 1054 28 10 OPEC 155 2005004 1054 31 10 651.803,98 CVE 294.683,22 CVE 67.399,04 EURO 11.147.684,64 CVE 14.433,00 EURO 280.844,96 CVE 12.636,67 EURO 245.890,95 CVE 1,000 11.147.684,64 151.751,66 USD 110,265 1.591.454,75 20.121,05 USD 1,000 280.844,96 3.515,64 USD 110,265 1.393.382,42 16.065,00 USD 245.890,95 2.995,25 USD 1,000 Sub Total 75.333.720,91 KUWAIT 92 1996100 514 20 1 8.440,00 USD 75,244 635.059,36 2.303,276 KD KUWAIT 92 1996100 514 21 2 8.440,00 USD 75,336 635.835,84 2.309,184 KD KUWAIT 92 1996100 514 17 3 8.440,00 USD 70,961 598.910,84 2.272,048 KD KUWAIT 92 1996100 514 18 6 21.955,50 USD 71,345 1.566.415,15 5.842,359 KD KUWAIT 92 1996100 514 3 7 15.106,00 USD 69,862 1.055.335,37 4.003,694 KD KUWAIT 92 1996100 514 19 11 15.648,00 USD 87,246 1.365.225,41 4.251,562 KD KUWAIT 92 1996100 514 24 11 5.860,686 KD Sub Total 5.856.781,97 KUWAIT 137 2004006 671 7 1 353.368,53 EURO 110,265 38.964.180,96 142.760,886 KD KUWAIT 137 2004006 671 23 1 115.264,09 EURO 110,265 12.709.594,88 46.059,530 KD KUWAIT 137 2004006 671 10 7 114.472,83 EURO 110,265 12.622.346,60 47.964,116 KD KUWAIT 137 2004006 671 10 7 69.372,74 EURO 110,265 7.649.385,18 29.067,178 KD KUWAIT 137 2004006 671 24 8 0,00 35.157,860 KD 149 2005100 31 7 Sub Total Portugal 71.945.507,62 380.049,86 EURO 110,265 Sub Total 41.906.197,81 380.049,86 EURO 41.906.197,81 380.049,86 Portugal 150 2005101 12 2 217.650,98 EURO 110,265 23.999.285,31 217.650,98 EURO Portugal 150 2005101 29 2 13.050,88 EURO 110,265 1.439.055,28 13.050,88 EURO Portugal 150 2005101 29 2 23.975,64 EURO 110,265 2.643.673,94 23.975,64 EURO Portugal 150 2005101 29 2 270.799,08 EURO 110,265 29.859.660,56 270.799,08 EURO Portugal 150 2005101 7 4 23.975,64 EURO 110,265 2.643.673,94 23.975,64 EURO Portugal 150 2005101 7 4 265.317,93 EURO 110,265 29.255.281,55 265.317,93 EURO Portugal 150 2005101 22 4 460.435,56 EURO 110,265 50.769.927,02 460.435,56 EURO Portugal 150 2005101 22 4 28.726,01 EURO 110,265 3.167.473,49 28.726,01 EURO Portugal 150 2005101 14 5 26.301,85 EURO 110,265 2.900.173,49 26.301,85 EURO Portugal 150 2005101 3 7 633.796,49 EURO 110,265 69.885.569,97 633.796,49 EURO Portugal 150 2005101 3 7 629.337,68 EURO 110,265 69.393.919,29 629.337,68 EURO Portugal 150 2005101 23 7 26.277,37 EURO 110,265 2.897.474,20 26.277,37 EURO Portugal 150 2005101 31 7 20.203,37 EURO 110,265 2.227.724,59 20.203,37 EURO Portugal 150 2005101 31 7 1.389.649,62 EURO 110,265 153.229.715,35 1.389.649,62 EURO Portugal 150 2005101 27 8 20.203,37 EURO 110,265 2.227.724,59 20.203,37 EURO Portugal 150 2005101 11 9 767.355,14 EURO 110,265 84.612.414,51 767.355,14 EURO Portugal 150 2005101 12 9 20.203,37 EURO 110,265 2.227.724,59 20.203,37 EURO Portugal 150 2005101 15 10 595.425,51 EURO 110,265 65.654.593,86 595.425,51 EURO Portugal 150 2005101 30 10 421.961,87 EURO 110,265 46.527.625,60 421.961,87 EURO Portugal 150 2005101 30 10 20.203,37 EURO 110,265 2.227.724,59 20.203,37 EURO Portugal 150 2005101 30 10 20.203,37 EURO 110,265 2.227.724,59 20.203,37 EURO Portugal 150 2005101 15 12 462.722,12 EURO 110,265 51.022.054,56 462.722,12 EURO Portugal 150 2005101 15 12 20.203,37 EURO 110,265 2.227.724,59 20.203,37 EURO Portugal 150 2005101 29 12 20.203,37 EURO 110,265 2.227.724,59 20.203,37 EURO Sub Total 705.495.644,08 MAPA A.3 - DESEMBOLSOS EFECTUADOS DURANTE O 4º TRIMESTRE ANO 2008 (EM ESCUDOS) Credor N.R. Nºchav Nºacordo Dia Mês Moeda de Desembolso Cambio Valor em Escudos Moeda do Empréstimo Portugal 161 2007100 25 6 1.196.195,00 EURO 110,265 131.898.441,68 1.196.195,00 EURO Portugal 161 2007100 25 6 218.731,97 EURO 110,265 24.118.480,67 218.731,97 EURO Portugal 161 2007100 25 6 319.580,66 EURO 110,265 35.238.561,47 319.580,66 EURO Portugal 161 2007100 22 7 270.640,62 EURO 110,265 29.842.187,96 270.640,62 EURO Portugal 161 2007100 22 7 18.682,27 EURO 110,265 2.060.000,50 18.682,27 EURO Portugal 161 2007100 22 7 18.682,27 EURO 110,265 2.060.000,50 18.682,27 EURO Portugal 161 2007100 22 7 18.682,27 EURO 110,265 2.060.000,50 18.682,27 EURO Portugal 161 2007100 23 7 18.682,27 EURO 110,265 2.060.000,50 18.682,27 EURO Portugal 161 2007100 21 8 606.990,23 EURO 110,265 66.929.777,71 606.990,23 EURO Portugal 161 2007100 11 9 497.466,97 EURO 110,265 54.853.195,45 497.466,97 EURO Portugal 161 2007100 11 9 18.682,27 EURO 110,265 2.060.000,50 18.682,27 EURO Portugal 161 2007100 24 9 18.682,27 EURO 110,265 2.060.000,50 18.682,27 EURO Portugal 161 2007100 24 9 18.682,27 EURO 110,265 2.060.000,50 18.682,27 EURO Portugal 161 2007100 15 10 330.458,80 EURO 110,265 36.438.039,58 330.458,80 EURO Portugal 161 2007100 30 10 396.757,18 EURO 110,265 43.748.430,45 396.757,18 EURO Portugal 161 2007100 15 12 310.268,34 EURO 110,265 34.211.738,51 310.268,34 EURO Portugal 161 2007100 15 12 18.682,27 EURO 110,265 2.060.000,50 18.682,27 EURO Portugal 161 2007100 15 12 18.682,27 EURO 110,265 2.060.000,50 18.682,27 EURO Portugal 161 2007100 23 12 420.612,34 EURO 110,265 46.378.819,67 420.612,34 EURO 173 2008103 12 9 5.521.944,71 EURO 110,265 Sub Total Portugal 522.197.677,67 Portugal Portugal 608.877.233,45 5.521.944,71 EURO 258.898.223,93 173 2008103 Sub Total Montante Desembolsado durante o Ano 2008 12 9 3.335.434,79 EURO 110,265 367.781.717,12 1.235.557.174,50 5.381.289.463,82 3.335.434,79 EURO CONTAS PROVISÓRIAS 4º TRIMESTRE 2008 Mapa B - Fundos saídos da tesouraria do Estado para pagamento de despesas públicas orçamentais Dotações Orçamento Descrição Encargos Gerais da Nação Orçamentais Corrigido Presidência Da República 120.914.143 124.769.974 Assembleia Nacional 607.527.565 607.527.565 Supremo Tribunal De Justiça 43.718.893 43.718.893 Procuradoria Geral Da Répública 28.375.968 28.375.968 Tribunal De Contas 74.193.867 74.193.867 Comissão Nacional De Eleições 0 42.682.683 Adiantamentos por regularizar Total Encargos Gerais da Nação 874.730.436 921.268.950 Descrição Governo Descrição e Chefia Governo do e Governo Chefia do Governo 10.02.02 Ministério Das Infraestruturas Transportes E Mar 109.786.944 109.786.944 10.02.03 Ministério Da Saúde 1.733.753.652 1.743.753.652 10.02.04 Ministério Da Defesa Nacional 31.479.174 31.479.174 10.02.05 Ministério Dos Negócios Estrangeiros, Cooperação 767.954.725 e Comunidades767.954.725 10.02.06 Ministério Da Administração Interna 147.133.236 129.395.482 10.02.07 Ministério Das Finanças e Administração Pública 12.167.949.346 11.818.049.406 10.02.08 Ministério Da Justiça 522.999.264 522.999.264 10.02.09 Ministério Do Ambiente e Agricultura 219.366.026 219.366.026 10.02.10 Ministério Da Educação e Ensino Superior 5.599.639.500 5.601.877.361 10.02.11 Ministério Do Trabalho, Familia E Solidariedade 167.207.202 167.207.202 10.02.12 Ministério Da Economia, Crescimento E Competitividade 121.666.914 121.666.914 10.02.13 Ministério Da Cultura 49.943.006 49.943.006 10.02.14 Ministerio Da Descent., Habi.E Ordenamento Do Territorio 47.426.331 47.426.331 10.03.01 Gabinete Do Primeiro Ministro 151.659.212 174.650.831 10.03.02 Ministro Da Presidencia Conselho Ministro E Reforma 93.439.130 Do Estado 91.386.849 10.03.03 Ministro Adjunto do Primeiro Ministro e da Qualificação 36.795.661 e Emprego 53.537.430 10.03.04 Secretário De Estado De Juventude E Desportos 124.575.823 111.102.831 10.03.05 Gabinete Do Ministro Da Reforma Do Estado 0 11.241.457 Adiantamentos por regularizar Total Governo e Chefia do Governo 22.092.775.146 21.772.824.885 Dsecrição Fundos Dsecrição e Serviços FundosAutónomos e Serviços Autónomos 10.02.02.13 Instituto De Estradas 20.389.880 20.389.880 10.02.02.14 Laboratório De Engenharia Civil 20.554.300 20.554.300 10.02.02.15 Instituto Maritimo Portuario 91.977.504 91.977.504 10.02.02.16 Instituto Nacional De Desenvolvimento Das Pescas42.166.070 42.166.070 10.02.03.07 Hospital Central Agostinho Neto 246.684.485 246.684.485 10.02.03.08 Hospital Central Baptista De Sousa 194.946.509 194.946.509 10.02.03.09 Centro Nacional De Desenvolvimento Sanitário 9.355.080 9.355.080 10.02.03.10 Regiao Sanitária Santiago Norte 11.313.409 11.313.409 10.02.04.06 Estado Maior Das Forças Armadas 631.461.716 631.461.716 10.02.05.12 Instituto Das Comunidades 47.190.421 47.190.421 10.02.06.07 Polícia Nacional 1.412.597.149 1.412.597.149 10.02.07.17 Instituto Nacional De Estatística 111.489.542 111.489.542 10.02.07.18 Instituto Nacional De Administração E Gestão 13.196.656 13.196.656 10.02.08.11 Polícia Judiciária 147.960.271 147.960.271 10.02.08.13 Comissão De Coordenação E Combate À Droga 13.804.540 13.804.540 10.02.09.06 Instituto Nacional De Investigação E Des. Agrário 55.967.954 55.967.954 10.02.09.07 Instituto Nacional De Gestão De Recursos Hídricos87.806.818 87.806.818 10.02.09.08 Instituto Nacional De Meteorologia E Geofísica 124.110.949 124.110.949 10.02.10.12 Instituto Caboverdiano De Acção Social Escolar 41.669.596 41.669.596 10.02.10.13 Instituto Superior De Engenharia E Ciências Do Mar 120.460.029 120.460.029 10.02.10.14 Instituto Superior De Educação 130.488.364 160.488.364 10.02.10.15 Instituto Pedagógico 91.594.253 91.594.253 10.02.10.18 Universidade De Cabo Verde 87.003.132 57.003.132 10.02.11.10 Instituto Caboverdiano Da Criança e do Adolescente 28.828.874 28.828.874 10.02.12.13 Agência Caboverdiana De Investimentos 85.016.776 85.016.776 10.02.13.06 Arquivo Histórico Nacional 28.961.884 28.961.884 10.02.13.07 Instituto De Investigação E Património Cultural 39.773.096 39.773.096 10.02.13.08 Instituto Da Biblioteca Nacional E Do Livro 23.534.836 23.534.836 10.03.01.02 Instituto Caboverdiano para Igualdede e Equidade do 9.544.141 Género 9.675.888 10.03.03.03 Instituto Do Emprego E Da Formação Profissional 49.652.833 49.652.833 10.03.04.04 Centro De Juventude 27.188.763 27.188.763 Adiantamentos por regularizar Total Fundos e Serviços Autónomos 4.046.689.830 4.046.821.577 FUNCIONAMENTO Total 27.014.195.412 26.740.915.412 Descrição Despesas PPIP 4.379.328.518 4.396.076.942 Governo/Tesouro 732.000.000 1.084.378.869 OFN 214.500.000 267.321.947 AAL 7.271.282.654 8.952.325.606 Donativos 4.983.920.516 8.420.843.039 Empréstimos Total Despesas PPIP 17.581.031.688 23.120.946.403 TOTAL GERAL 44.595.227.100 49.861.861.815 Clas.Org. 10.01.01 10.01.02 10.01.03 10.01.04 10.01.05 10.01.06 Cabimentado Liquidado Por pagar Pagamentos Jan. a Dezemb Jan. a Dezemb 106.559.579 493.875.849 27.381.262 26.951.164 46.824.809 18.952.998 106.559.579 493.875.849 27.381.262 26.951.164 46.824.809 18.952.998 6.679.264 0 0 0 11.873 4.422.021 720.545.661 720.545.661 11.113.158 93.055.183 93.055.183 1.577.160.928 1.577.160.928 29.995.904 29.995.904 683.285.605 683.285.605 91.019.889 91.019.889 11.284.262.153 11.284.262.153 486.005.801 486.005.801 195.680.166 195.680.166 5.437.322.751 5.437.322.751 153.756.445 153.756.445 94.648.317 94.648.317 44.667.560 44.667.560 39.526.550 39.526.550 147.631.239 147.631.239 77.158.885 77.158.885 41.855.566 41.855.566 104.065.526 104.065.526 2.342.232 2.342.232 20.583.440.700 20.583.440.700 15.854.149 13.729.633 66.663.717 24.255.819 165.733.899 204.563.847 7.279.905 311.248 592.167.330 41.867.076 1.271.870.524 102.264.544 10.103.320 124.640.466 11.491.507 27.530.594 75.221.740 123.727.125 39.370.666 91.858.057 152.585.146 80.024.540 49.602.022 25.429.004 72.487.575 28.057.035 33.278.754 22.075.433 8.084.409 46.916.990 23.174.558 15.854.149 13.729.633 66.663.717 24.255.819 165.733.899 204.563.847 7.279.905 311.248 592.167.330 41.867.076 1.271.870.524 102.264.544 10.103.320 124.640.466 11.491.507 27.530.594 75.221.740 123.727.125 39.370.666 91.858.057 152.585.146 80.024.540 49.602.022 25.429.004 72.487.575 28.057.035 33.278.754 22.075.433 8.084.409 46.916.990 23.174.558 3.552.220.632 3.552.220.632 24.856.206.993 24.856.206.993 4.083.900.111 478.508.888 147.714.722 5.796.547.085 5.757.457.144 4.083.900.111 478.508.888 147.714.722 5.796.547.085 5.757.457.144 16.264.127.950 16.264.127.950 41.120.334.943 41.120.334.943 99.880.315 493.875.849 27.381.262 26.951.164 46.812.936 14.530.977 90.273.790 799.706.293 Total Geral Executado 106.559.579 493.875.849 27.381.262 26.951.164 46.824.809 18.952.998 90.273.790 810.819.451 0 93.055.183 1.577.160.928 29.995.904 683.285.605 91.019.889 11.284.262.153 486.005.801 195.680.166 5.437.322.751 153.756.445 94.648.317 44.667.560 39.526.550 147.631.239 77.158.885 41.855.566 0 93.055.183 0 1.577.160.928 0 29.995.904 0 683.285.605 0 91.019.889 0 11.284.262.153 25.494 485.980.307 0 195.680.166 0 5.437.322.751 0 153.756.445 0 94.648.317 0 44.667.560 0 39.526.550 0 147.631.239 0 77.158.885 0 41.855.566 0 104.065.526 0 2.342.232 2.342.232 0 0 25.494 20.583.415.206 20.583.440.700 0 0 15.854.149 15.854.149 0 13.729.633 13.729.633 0 66.663.717 66.663.717 0 24.255.819 24.255.819 0 165.733.899 165.733.899 0 204.563.847 204.563.847 0 7.279.905 7.279.905 0 311.248 311.248 0 592.167.330 592.167.330 0 41.867.076 41.867.076 20.815.883 1.251.054.641 1.271.870.524 0 102.264.544 102.264.544 0 10.103.320 10.103.320 4.067.914 120.572.552 124.640.466 0 11.491.507 11.491.507 0 27.530.594 27.530.594 0 75.221.740 75.221.740 0 123.727.125 123.727.125 0 39.370.666 39.370.666 0 91.858.057 91.858.057 0 152.585.146 152.585.146 0 80.024.540 80.024.540 0 49.602.022 49.602.022 0 25.429.004 25.429.004 0 72.487.575 72.487.575 0 28.057.035 28.057.035 0 33.278.754 33.278.754 0 22.075.433 22.075.433 0 8.084.409 8.084.409 0 46.916.990 46.916.990 0 23.174.558 23.174.558 129.926.263 129.926.263 24.883.797 3.657.263.098 3.682.146.895 36.022.449 25.040.384.597 25.076.407.046 0 13.457.928 4.083.611.887 4.097.069.815 0 478.508.888 478.508.888 0 147.714.722 147.714.722 17.469.996 5.796.286.994 5.813.756.990 1.989.200 5.757.457.144 5.759.446.344 32.917.124 16.263.579.635 16.296.496.759 68.939.573 41.303.964.232 41.372.903.805 %_1 12,5% 61,8% 3,4% 3,4% 5,9% 1,8% 11,3% 100,0% Exe % 85,4% 81,3% 62,6% 95,0% 63,1% 44,4% 88,0% 0,5% 7,7% 0,1% 3,3% 0,4% 54,8% 2,4% 1,0% 26,4% 0,7% 0,5% 0,2% 0,2% 0,7% 0,4% 0,2% 84,8% 90,4% 95,3% 89,0% 70,3% 95,5% 92,9% 89,2% 97,1% 92,0% 77,8% 89,4% 83,3% 84,5% 84,4% 78,2% 0,0% 0,0% 100,0% 20,8% 94,5% 0,4% 77,8% 0,4% 66,8% 1,8% 72,5% 0,7% 57,5% 4,5% 67,2% 5,6% 104,9% 0,2% 77,8% 0,0% 2,8% 16,2% 93,8% 1,1% 88,7% 34,2% 90,0% 2,8% 91,7% 0,3% 76,6% 3,3% 84,2% 0,3% 83,2% 0,8% 49,2% 2,1% 85,7% 3,4% 99,7% 1,1% 94,5% 2,5% 76,3% 4,2% 95,1% 2,2% 87,4% 1,4% 87,0% 0,7% 88,2% 2,0% 85,3% 0,8% 96,9% 0,9% 83,7% 0,6% 93,8% 0,2% 83,6% 1,3% 94,5% 0,6% 85,2% 3,6% 100,0% 91,0% 684,7% 93,8% 25,1% 2,9% 0,9% 35,6% 35,4% 100,0% 100,0% 93,2% 44,1% 55,3% 64,9% 68,4% 70,5% 83,0% MAPA I - Receitas Correntes e de Capital do Estado segundo a classificação económica 4º Trimestre 2008 Clas.Econ. Designação Administração Central Investimento Total Geral 1.00.00.00 Receitas Correntes 32.205.080.396 0 1.01.00.00 1.01.01.00 1.01.01.01 1. 01.01.01.01 1. 01.01.01.02 1.01.01.02 1.01.01.03 1.01.01.03.01 1.01.01.03.02 1.01.01.03.03 1.01.01.04 1.01.01.04.01 1.01.01.05 1.01.01.05.01 1.01.01.05.02 1.01.01.05.03 1.01.01.05.90 1.01.02.00 1.01.02.01 1.01.02.02 1.01.02.03 1.01.02.90 Receitas Ficais Impostos Impostos sobre rendimento Imp.unico s/rendimentos - pessoas singulares Imp.unico s/rendimentos - pessoas colectivas Imposto sobre o valor acrescentado Imposto sobre bens e serviços Imposto de Consumo especial Taxa Comunitária - CEDEAO Taxa Ecologica Imposto sobre transações internacionais Direitos de Importacao Imposto de Selo Estampilhas Fiscais Selo de Verba Selos especiais Selos diversos Outras Receitas Fiscais Juros de Mora Taxa de Relaxe Multas por Infracções Fiscais Outras receitas Receitas não Fiscais Multas e Outras Penalidades Juros de mora Multas por Infracções ao Código de Estradas Outras multas e penalidades Taxas e Preços Públicos Taxas de serviços Taxas de Serviços de Passaportes Taxa de serviços agrícolas e pecuários Taxas de serviços de sanidade Taxas de Serviços policiais Taxas de Serviços de Viação Taxas de Serviços de Comércio Taxas de exploração de àguas Taxas de Serviços diversos Emolumentos e Custas Emolumentos dos portos e Capitanias Emolumentos Judicias Emolumentos dos Registos e Notariados Emol Judiciais do Contenciosos Fiscal -Aduaneiro Custas Judiciais do Contenciosos Fiscal -Aduaneiro Emolumentos de Secretaria Outros emolumentos e Custas Emolumentos Pessoais Serviços de Portos e Capitanias Serviços de Justiça Serviços dos Registos e Notariados Serviços Judiciais do Contencioso fiscal -aduaneiro Custas Judiciais - Contenciosos Fiscal -Aduaneiro Serviços Aduaneiros e da Guarda Fiscal Serviços da polícia de Fronteira Serviços de Polícia de Ordem Pública Serviços Agrícolas e pecuários Serviços diversos Bens e serviços não patrimoniais Serviços de Vistorias Serviços de Farmácias Serviço Médico-Hospitalares Serviços de Oficinas do Estado Serviços de Recursos Agro-Florestais Serviços de água Serviços diversos Rendimentos de Propriedades 29.584.890.954 29.400.488.151 8.524.842.314 4.823.634.167 3.701.208.147 11.723.490.827 1.798.286.129 1.340.399.279 236.183.603 221.703.247 5.888.183.012 5.888.183.012 1.465.685.869 21.793.895 1.325.519.593 0 0 0 1.02.01.00 1.02.01.01 1.02.01.03 1.02.01.90 1.02.02.00 1.02.02.01 1.02.02.01.01 1.02.02.01.02 1.02.02.01.03 1.02.02.01.04 1.02.02.01.05 1.02.02.01.06 1.02.02.01.07 1.02.02.01.90 1.02.02.02 1.02.02.02.01 1.02.02.02.02 1.02.02.02.03 1.02.02.02.04 1.02.02.02.05 1.02.02.02.06 1.02.02.02.90 1.02.02.03 1.02.02.03.01 1.02.02.03.02 1.02.02.03.03 1.02.02.03.04 1.02.02.03.05 1.02.02.03.06 1.02.02.03.08 1.02.02.03.09 1.02.02.03.10 1.02.02.03.90 1.02.02.04 1.02.02.04.01 1.02.02.04.02 1.02.02.04.03 1.02.02.04.04 1.02.02.04.05 1.02.02.04.06 1.02.02.04.90 1.02.03.00 118.372.381 184.402.803 102.814.543 27.683.301 40.920.999 12.983.960 2.620.189.442 124.984.420 307.034 39.760.801 84.916.585 1.694.572.429 855.746.301 126.876.678 17.972.659 0 32.000 53.909.663 13.874.020 39.715.479 603.365.802 366.985.037 29.206.387 44.805 129.322.985 0 0 141.146.908 67.263.952 266.169.894 23.488.685 217.572 0 0 0 176.027.613 56.887.630 0 2.780.296 6.768.098 205.671.197 880.600 98.287 192.721.273 2.713.585 9.257.452 157.041.456 0 0 0 0 0 0 0 0 0 0 0 0 32.205.080.396 0 29.584.890.954 29.400.488.151 8.524.842.314 4.823.634.167 3.701.208.147 11.723.490.827 1.798.286.129 1.340.399.279 236.183.603 221.703.247 5.888.183.012 5.888.183.012 1.465.685.869 21.793.895 1.325.519.593 0 118.372.381 184.402.803 102.814.543 27.683.301 40.920.999 12.983.960 2.620.189.442 124.984.420 307.034 39.760.801 84.916.585 1.694.572.429 855.746.301 126.876.678 17.972.659 0 32.000 53.909.663 13.874.020 39.715.479 603.365.802 366.985.037 29.206.387 44.805 129.322.985 0 0 141.146.908 67.263.952 266.169.894 23.488.685 217.572 0 0 176.027.613 56.887.630 0 2.780.296 6.768.098 205.671.197 880.600 98.287 192.721.273 0 0 2.713.585 9.257.452 157.041.456 MAPA I - Receitas Correntes e de Capital do Estado segundo a classificação económica 4º Trimestre 2008 Clas.Econ. 1.02.03.01 1.02.03.03 1.02.03.04 1.02.03.05 1.02.03.06 1.02.03.07 1.02.03.08 1.02.03.09 1.02.03.90 1.02.04.00 1.02.04.01 1.02.04.02 1.02.04.03 1.02.04.90 1.02.05.00 1.02.05.01 1.02.05.04 1.02.05.90 1.02.06.00 1.02.06.01 1.02.06.01.90 1.02.06.02 1.02.06.02.03 1.02.06.03 1.02.06.03.90 1.02.07.00 1.02.07.01 1.02.07.02 1.02.07.03 1.02.07.90 1.02.08.00 1.02.08.01 1.02.08.02 1.02.08.90 1.02.08.99 9.99.99.99 2.00.00.00 2.01.00.00 2.01.02.00 2.02.00.00 2.02.01.00 2.02.02.00 2.02.03.00 2.02.04.00 2.02.05.00 2.02.06.00 2.02.90.00 2.04.00.01 2.04.00.01 2.04.00.01.90 2.04.00.03 2.04.00.03.01 2.04.00.03.90 2.05.00.00 Total Geral Designação Rendas de Concessões Aeroportuárias Outras rendas e Concessões Rendas de Terrenos Rendas de Habitação do Estado Rendas de edificios do Estado Rendas diversas Alugueres de equipamentos Alugueres diversos Outros Rendimentos de Propriedade Cotização para fundo de previdência Taxa Social Única Caixa de aposentação e pensão Montepio dos Servidores do Estado Cotizações diversas para a segurança social Rendimentos Financeiros Juros de Créditos Internos Concedidos Participação nos lucros das Empresas Outros Rendimentos Financeiros Transferências Correntes Transferências das administrações públicas Outras Transferências Transferências das administrações e sector privado Totoloto Nacional Transferências do Exterior Transferências diversas Vendas Mercadorias Produtos acabados e Semi-Acabados Publicações e Impressos Outros Outras Receitas Correntes Reposições de Fundos Serviços Consulares Outras Receitas Correntes Outras receitas extraordinárias Recebimentos não identificado Receitas de Capital Imobilizações Financeiras Outros Imobilizações Corpórias Terrenos Habitações Edifícios Maquinaria e equipamentos básicos Ferramentas e utensílios Equipamentos administrativos Outras imobilizações corpóreas Transferências de Capital Transferências das administrações públicas Outras Transferências Transferências exterior Ajuda alimentar Outras Transferências( Donativos) Outras Receitas de Capital( Ajuda Orçamental) Ajuda alimentar entrado no Tesouro Ajuda Austrica MCA Ajuda Orçamental Hollanda - Livre Banco Mundial - livre Hollanda -PANA União Europeia - Livre Austria Espanha Portugal United kingdom- reembolso de Divida BAD Empréstimo de Retrocessão Janeiro a Dezembro Administração Central Investimento Total Geral 3.568.592 0 141.376.873 0 12.095.991 50.831.038 20.557.149 8.592.335 21.681.554 365.099.138 14.526.916 330.940.505 19.631.717 44.377.158 400.000 400.000 43.977.158 43.977.158 0 0 0 0 0 0 0 35.588.288 1.434.978 4.905.000 29.248.310 0 147.695.515 2.074.186 2.329.320 143.175.564 116.445 0 1.012.981.688 30.000.043 30.000.043 982.981.645 947.959.841 6.911.111.042 0 0 33.597.802 1.424.002 0 0 0 33.218.062.084 216.858.490 1.632.750.853 826.987.500 763.974.213 231.556.500 44.106.000 372.144.375 165.397.500 70.488.712 5.270.919.167 481.408.888 481.408.888 4.789.510.279 216.858.490 4.572.651.789 1.640.191.875 6.911.111.042 0 0 0 3.568.592 0 141.376.873 0 12.095.991 0 50.831.038 20.557.149 8.592.335 0 21.681.554 365.099.138 14.526.916 330.940.505 19.631.717 44.377.158 400.000 400.000 43.977.158 43.977.158 0 0 35.588.288 1.434.978 4.905.000 29.248.310 0 147.695.515 2.074.186 2.329.320 143.175.564 116.445 0 7.924.092.730 30.000.043 30.000.043 982.981.645 947.959.841 0 0 33.597.802 0 0 1.424.002 5.270.919.167 481.408.888 481.408.888 4.789.510.279 216.858.490 4.572.651.789 1.640.191.875 40.129.173.126 216.858.490 0 1.632.750.853 0 826.987.500 763.974.213 0 231.556.500 44.106.000 372.144.375 165.397.500 0 0 0 70.488.712 CONTAS PROVISÓRIAS 4º TRIMESTRE 2008 Mapa II - Despesas de funcionamento Estado segundo classificação económica e orgânica(Em ECV) Natureza FUN Class. Econom1 Class. Econom2 Económica2 Descrição 03-Despesas 03.01-Despesa Correntes 03.01.01.01-Pessoal Com Pessoal Do Quadro Especial 03.01.01.02-Pessoal Do Quadro 03.01.01.03-Pessoal Contratado 03.01.01.04-Gratificações Permanentes 03.01.01.05-Subsídios Permanentes 03.01.01.06-Despesas De Representação 03.01.02.01-Gratificações Eventuais 03.01.02.02-Horas Extraordinárias 03.01.02.03-Alimentação E Alojamento 03.01.02.04-Subsídio De Instalação 03.01.02.90-Remunerações Diversas 03.01.03.01-Encargos Com A Saúde 03.01.03.02-Abono De Família 03.01.03.03-Contribuições Para A Segurança Social 03.01.03.04-Seguros Acidentes Trabalho 03.01.03.90-Encargos Diversos 03.01.04.01-Aumento Salarial 03.01.04.02-Recrutamentos E Nomeações 03.01.04.03-Progressões 03.01.04.04-Reclassificações 03.01.04.05-Reingressos 03.01.04.06-Promoções 03.01.04.90-Outras Dotações 03.01.90-Outras Despesas Com Pessoal 03.01-Despesa Com Pessoal Total 03.02-Aquisição 03.02.02-Matérias De Bens E Serviços Primas 03.02.03.01-Medicamentos 03.02.03.02-Produtos Alimentares Para Não Funcionários 03.02.03.03-Roupa E Calçado 03.02.03.04-Pequenos Equipamentos 03.02.03.90-Produtos Diversos 03.02.04-Outros Aprovisionamentos 03.02.05.02-Munições E Explosivos 03.02.05.90-Material Diverso 03.02.90-Trabalhos Realizados Por Outrem 03.02-Aquisição De Bens E Serviços Total 03.03-Fornecimentos 03.03.01-Água E Serviços Externos 03.03.02-Electricidade 03.03.03-Combustíveis E Lubrificantes 03.03.04-Conservação E Manutenção 03.03.05-Equipamentos De Desgaste Rápido 03.03.06-Consumo De Secretaria 03.03.07-Rendas E Alugueres 03.03.08-Representação 03.03.09-Comunicações 03.03.10-Seguros 03.03.11-Vigilância E Segurança 03.03.12.01-Ass. Tec. - Residente 03.03.12.02-Ass. Tec. - Não Residente 03.03.13-Deslocações E Estadias 03.03.14-Limpeza, Higiéne E Conforto 03.03.15-Formação 03.03.90-Outros Fornecimentos 03.03-Fornecimentos E Serviços Externos Total 03.04-Encargos 03.04.01-Juros Da Dívida Da Dívida Interna 03.04.02-Juros Da Dívida Externa 03.04.90-Outros Encargos 03.04-Encargos Da Dívida Total Presidência Da República 23.624.658 10.968.763 867.791 787.709 610.539 27.522 917.608 32.591 102.937 0 Assembleia Nacional 152.616.520 76.841.554 20.580.454 60.000 15.933.180 1.351.580 30.000 3.545.297 909.556 1.588.000 0 6.551.236 513.600 5.712.406 0 0 0 0 Supremo Tribunal De Justiça Procuradoria Geral Da Répública 18.147.746 16.078.368 20.396 346.800 749.871 0 578.616 606.789 77.176 0 49.400 0 Comissão Tribunal De Nacional De Contas Eleições 1.367.677 2.146.952 32.920.423 124.518 1.136.954 470.454 0 2.346.228 2.373.263 317.899 54.000 44.250 71.068 16.000 67.596 1.002.629 116.381 0 0 0 Ministério Das Infraestrutura Ministério Da s Transportes Ministério Da Defesa E Mar Saúde Nacional 7.459.818 5.173.008 7.657.224 40.983.375 827.268.047 4.711.697 5.493.229 35.732.784 77.229 0 16.079.036 194.232 903.672 791.614 260.100 260.100 130.050 1.537.467 302.838.868 800 343.416 85.021 57.000.674 0 0 0 42.242.726 372.000 2.290.400 19.200 0 0 0 0 0 Ministério Dos Negócios Ministério Das Finanças e Estrangeiros, Ministério Da Cooperação e Administraçã Administração Comunidades o Interna Pública 14.134.573 10.595.673 20.764.909 111.848.829 20.954.024 398.953.144 1.301.148 6.775.924 22.416.362 6.585.840 158.760 192.182.522 1.258.839 5.354.313 382.500 260.100 574.940 2.795.868 88.063.225 0 4.619 439.700 3.444.289 431.550 0 167.000 130.050 206.600 0 198.382 1.482.200 145.486.278 0 0 0 0 0 0 0 0 0 323.590.911 49.635.869 0 684.125.381 0 0 37.940.118 0 286.233.383 19.341.989 17.313.173 1.029.684 2.810.989 288.599 38.825.755 6.039.136 56.301.021 1.290.132.731 92.737.505 85.445 0 8.983.072 581.823 20.282 0 0 801.740 2.415.437 3.546.385 3.138.148 0 945.557 290.197 6.898.825 3.339.336 186.584 1.542.150 402.870 3.840.673 7.414.088 19.804.289 12.915.352 4.893.775 965.777 7.957.704 4.866.013 643.245 24.653.334 2.382.533 5.656.200 0 0 22.569.841 1.794.687 0 4.039.684 51.911.441 43.430.536 10.443.319 3.316.668 15.782.890 165.125.723 2.800.000 68.960 3.300.000 188.286 1.043.769 7.868.071 0 0 0 1.230.352 123.811 230.031 394.638 432.000 331.908 860.763 351.839 0 0 777.652 1.150.000 744.854 78.544 599.321 115.063 0 1.905.183 3.496.748 1.403.093 1.122.199 394.706 693.710 1.680.000 159.500 1.973.180 475.171 4.334.400 800.750 102.387.845 7.915.881 10.396.298 3.397.752 0 0 1.280.021 720.000 93.415 350.000 700.000 981.398 337.859 17.866 695.343 7.521.639 1.242.796 0 0 543.459 42.428 10.425.510 1.047.443 95.458 1.205.066 121.790 4.938.491 292.063 19.733.941 0 800.000 9.637.991 815.422 7.820.340 2.142.702 7.059.687 948.136 24.617.330 0 0 0 0 196.377 4.260.000 0 280.326 44.716 0 944.970 51.743 93.415 0 10.412 452.454 181.362 181.164 32.960 164.115 1.402.289 105.000 531.340 60.972 0 468.061 799.760 600.000 599.574 0 20.282 70.070 387.064 400.000 223.464 13.472.035 0 0 3.721.763 1.810.873 876.636 524.560 1.419.790 10.560.000 1.342.177 6.966.077 721.315 2.384.640 115.063 131.446 1.034.898 3.088.145 3.470.906 710.749 1.030.126 36.000 1.283.715 423.763 25.454.977 4.331.472 888.377 53.096.705 629.113 16.430.454 6.325.538 66.439.818 9.230.051 478.950 214.500 7.630.417 34.791.428 0 0 0 0 3.977.947 569.312 1.534.600 1.653.381 0 996.713 8.797.026 101.858.146 8.625.329 27.149.476 988.982 11.041.431 3.452.570 143.032.008 1.215.431 15.236.282 861.501 9.372.525 22.821.954 9.880.195 28.886.841 393.219.697 1.347.222.901 548.030.008 1.155.263 1.896.408.172 CONTAS PROVISÓRIAS 4º TRIMESTRE 2008 Mapa II - Despesas de funcionamento Estado segundo classificação económica e orgânica(Em ECV) Natureza Class. Econom1 Class. Econom2 Económica2 Descrição 03.05-Transferências 03.05.01.01-Fundos Correntes E Serviços Autónomos 03.05.01.02-Municípios 03.05.01.03-Embaixadas E Serviços Consulares 03.05.01.90-Outras Transferências 03.05.02.01-Partidos Políticos 03.05.02.02-Organismos Não-Governamentais 03.05.02.90-Outras Transferências 03.05.03.01.01-Pensões De Aposentação 03.05.03.01.02-Pensões De Sobrevivência 03.05.03.01.03-Pensões De Regime Não Contributivo 03.05.03.01.04-Pensões De Reserva 03.05.03.01.90-Pensões De Ex_Presidentes 03.05.03.02-Bolsas De Estudo 03.05.03.03-Evacuação De Doentes 03.05.03.90-Outras Transferências 03.05.04.01-Quotas A Organismos Internacionais 03.05.04.02-Outras Transferências 03.05-Transferências Correntes Total 03.06-Subsídios 03.06.01-Empresas Públicas 03.06.02-Empresas Privadas 03.06.90-Subsídios Diversos 03.06-Subsídios Total 03.07-Outras 03.07.01-Restituições Despesas Correntes 03.07.02-Impostos E Taxas 03.07.03-Indemnizações 03.07.88-Dotação Provisional 03.07.89-Despesas Extraordinárias 03.07.90-Outras Despesas Correntes 03.07-Outras Despesas Correntes Total 03-Despesas Correntes Total 04-Despesas 04.01-Imobilizações De Capital 04.01.03-Habitações Corpóreas 04.01.04-Edifícios 04.01.05-Maquinaria E Equipamentos Basicos 04.01.06-Ferramentas E Utensílios 04.01.07-Equipamentos De Carga E Transporte 04.01.08-Equipamentos Administrativos 04.01.90-Outras Imobilizações Corpóreas 04.01-Imobilizações Corpóreas Total 04-Despesas De Capital Total FUN Total ADIANTAMENTOS POR REGULARIZAR Total Total Geral Presidência Da República Assembleia Nacional Supremo Tribunal De Justiça Procuradoria Geral Da Répública Tribunal De Contas Ministério Das Comissão Infraestrutura Ministério Da Nacional De s Transportes Ministério Da Defesa Eleições E Mar Saúde Nacional 7.533.541 Ministério Dos Negócios Ministério Das Finanças e Estrangeiros, Ministério Da Cooperação e Administraçã Administração Comunidades o Interna Pública 2.443.637.631 293.254.876 451.800 1.396.146 13.000.000 53.640.010 35.000.000 0 159.607.700 1.408.396.422 121.428.400 539.701.028 4.500.000 3.126.140 116.043.647 2.500.000 3.577.940 637.450 0 2.033.596 171.202 0 133.259 0 12.033.541 131.543.647 0 293.254.876 0 0 0 0 0 0 0 0 0 0 0 0 0 93.429.499 583.840 0 3.715.961 2.151.015 6.450.816 6.450.816 99.880.315 7.003.701 106.884.016 3.218.306 3.218.306 460.451.681 1.020.000 7.068.304 12.760.238 10.000.000 2.575.626 0 33.424.168 33.424.168 493.875.849 39.154.744 533.030.593 171.202 0 27.381.262 133.259 0 26.951.164 0 46.799.636 1.211.059 1.211.059 14.309.882 13.300 221.095 0 0 13.300 13.300 46.812.936 15.776.866 62.589.802 221.095 221.095 14.530.977 20.325.876 34.856.853 0 0 92.951.892 1.577.160.928 0 29.995.904 0 683.285.605 62.391.125 131.627.983 4.955.430.299 83.512.000 359.631.259 488.784.504 931.927.763 783.176.640 127.918.975 0 1.316.987.595 675.394 79.924.830 675.394 2.308.008.040 85.217.754 11.170.116.065 0 103.848.598 760.950 6.280.000 0 0 27.381.262 6.587.799 33.969.061 0 0 26.951.164 1.424.804 28.375.968 103.291 5.041.185 103.291 0 103.291 0 93.055.183 1.577.160.928 0 0 29.995.904 0 0 683.285.605 4.017.490 5.802.135 114.146.088 5.802.135 114.146.088 91.019.889 11.284.262.153 93.055.183 1.577.160.928 29.995.904 683.285.605 91.019.889 11.284.262.153 CONTAS PROVISÓRIAS 4º TRIMESTRE 2008 Mapa II - Despesas de funcionamento Estado segundo classificação económica e orgânica(Em ECV) Natureza FUN Class. Econom1 Class. Econom2 Económica2 Descrição 03-Despesas 03.01-Despesa Correntes 03.01.01.01-Pessoal Com Pessoal Do Quadro Especial 03.01.01.02-Pessoal Do Quadro 03.01.01.03-Pessoal Contratado 03.01.01.04-Gratificações Permanentes 03.01.01.05-Subsídios Permanentes 03.01.01.06-Despesas De Representação 03.01.02.01-Gratificações Eventuais 03.01.02.02-Horas Extraordinárias 03.01.02.03-Alimentação E Alojamento 03.01.02.04-Subsídio De Instalação 03.01.02.90-Remunerações Diversas 03.01.03.01-Encargos Com A Saúde 03.01.03.02-Abono De Família 03.01.03.03-Contribuições Para A Segurança Social 03.01.03.04-Seguros Acidentes Trabalho 03.01.03.90-Encargos Diversos 03.01.04.01-Aumento Salarial 03.01.04.02-Recrutamentos E Nomeações 03.01.04.03-Progressões 03.01.04.04-Reclassificações 03.01.04.05-Reingressos 03.01.04.06-Promoções 03.01.04.90-Outras Dotações 03.01.90-Outras Despesas Com Pessoal 03.01-Despesa Com Pessoal Total 03.02-Aquisição 03.02.02-Matérias De Bens E Serviços Primas 03.02.03.01-Medicamentos 03.02.03.02-Produtos Alimentares Para Não Funcionários 03.02.03.03-Roupa E Calçado 03.02.03.04-Pequenos Equipamentos 03.02.03.90-Produtos Diversos 03.02.04-Outros Aprovisionamentos 03.02.05.02-Munições E Explosivos 03.02.05.90-Material Diverso 03.02.90-Trabalhos Realizados Por Outrem 03.02-Aquisição De Bens E Serviços Total 03.03-Fornecimentos 03.03.01-Água E Serviços Externos 03.03.02-Electricidade 03.03.03-Combustíveis E Lubrificantes 03.03.04-Conservação E Manutenção 03.03.05-Equipamentos De Desgaste Rápido 03.03.06-Consumo De Secretaria 03.03.07-Rendas E Alugueres 03.03.08-Representação 03.03.09-Comunicações 03.03.10-Seguros 03.03.11-Vigilância E Segurança 03.03.12.01-Ass. Tec. - Residente 03.03.12.02-Ass. Tec. - Não Residente 03.03.13-Deslocações E Estadias 03.03.14-Limpeza, Higiéne E Conforto 03.03.15-Formação 03.03.90-Outros Fornecimentos 03.03-Fornecimentos E Serviços Externos Total 03.04-Encargos 03.04.01-Juros Da Dívida Da Dívida Interna 03.04.02-Juros Da Dívida Externa 03.04.90-Outros Encargos 03.04-Encargos Da Dívida Total Ministério Da Justiça 8.944.447 353.305.799 3.225.693 Ministério Da Ministério Do Ministério Do Educação e Trabalho, Ambiente e Ensino Familia E Agricultura Superior Solidariedade 8.971.404 13.543.430 8.158.402 126.389.173 4.570.428.725 58.320.763 22.522.850 109.698.812 368.364 374.280 281.775 476.384 260.100 0 0 180.792.912 504.900 16.509.365 1.924.796 260.100 165.000 995.184 Ministério Da Ministro Da Ministro Economia, Ministerio Da Presidencia Adjunto do Descent., Secretário De Gabinete Do Crescimento Conselho Primeiro Habi.E Ministro Da E Gabinete Do Ministro E Ministro e da Estado De Competitivida Ministério Da Ordenamento Primeiro Reforma Do Qualificação Juventude E Reforma Do de Cultura Do Territorio Ministro Estado e Emprego Desportos Estado 16.266.343 8.130.708 8.965.060 26.248.159 7.241.149 9.087.760 2.603.953 0 30.070.701 9.378.657 18.528.432 3.360.310 15.806.659 2.825.547 13.000.983 0 219.085 2.506.776 699.752 2.742.105 5.297.548 652.432 165.576 0 801.074 847.000 872.424 802.902 2.578.062 1.036.604 998.730 273.900 0 504.900 260.100 260.100 290.700 260.100 260.100 70.040 0 113.988 83.453 14.144 18.266 8.880 21.459 0 0 0 111.892 0 1.865.720 0 0 0 482.200 0 11.526.200 366.598 79.400 0 4.800 0 0 0 0 0 0 0 0 69.564.023 48.871.956 127.400 55.200 0 76.400 0 3.200 0 0 0 0 35.283.416 29.739.919 13.827.769 49.200 0 0 16.275.544 0 0 0 0 367.997.714 0 0 0 0 0 159.102.111 4.903.999.528 70.210 0 0 21.167.609 29.515.900 946.872 49.533.347 190.598 0 0 62.377 0 0 1.320.496 20.805 51.821.520 5.007.157 6.182.186 3.010.979 393.164 976.553 803.088 23.820.000 0 929.607 4.230.232 5.771.702 438.323 1.247.330 1.470.142 70.210 18.527.804 23.781.063 3.216.645 2.179.509 2.305.203 4.250.616 12.294.700 0 267.824 1.323.400 1.887.991 847.302 854.926 1.170.000 4.980.000 10.130.643 948.279 1.939.284 6.167.885 3.191.795 6.240.000 11.603.308 1.257.967 5.084.400 3.313.138 279.614 1.696.800 2.004.390 4.312.914 5.112.712 0 458.471 1.476.363 1.095.123 976.207 555.478 1.038.497 9.057.500 209.609 3.333.390 363.764 1.740.629 45.000 0 93.098 595.340 537.300 291.509 357.658 374.948 0 0 243.145 802.144 267.170 14.800 604.063 223.987 164.962 116.620 657.009 100.338 690.000 289.317 7.768.325 12.470.508 5.254.801 7.822.762 2.838.139 2.798.286 190.000 2.987.395 57.354 190.598 324.734 864.206 2.927.350 1.896.108 2.437.485 3.000.000 5.000.000 0 0 991.968 2.422.557 2.281.979 931.795 0 1.777.019 62.377 200.000 513.009 720.500 226.446 69.291 736.802 7.062.289 4.829.000 860.087 5.105.500 276.669 0 0 189.979 374.689 654.042 179.719 516.626 2.160.000 737.320 88.724 0 0 0 0 13.915 0 222.528 143.413 0 0 30.231.933 4.632.436 64.161.073 361.500 1.361.927 36.523.155 3.923.852 108.663.900 3.643.610 25.519.406 1.748.429 32.759.361 1.034.635 7.351.723 1.371.295 7.510.650 0 12.380.657 59.062.473 2.311.360 3.165.000 50.000 14.010.902 45.799.456 0 0 0 0 0 0 0 0 0 1.313.363 803.264 169.579 45.000 1.212.963 5.314.043 498.248 6.372.190 298.728 199.663 0 584.818 1.463.065 0 0 0 CONTAS PROVISÓRIAS 4º TRIMESTRE 2008 Mapa II - Despesas de funcionamento Estado segundo classificação económica e orgânica(Em ECV) Natureza Class. Econom1 Class. Econom2 Económica2 Descrição 03.05-Transferências 03.05.01.01-Fundos Correntes E Serviços Autónomos 03.05.01.02-Municípios 03.05.01.03-Embaixadas E Serviços Consulares 03.05.01.90-Outras Transferências 03.05.02.01-Partidos Políticos 03.05.02.02-Organismos Não-Governamentais 03.05.02.90-Outras Transferências 03.05.03.01.01-Pensões De Aposentação 03.05.03.01.02-Pensões De Sobrevivência 03.05.03.01.03-Pensões De Regime Não Contributivo 03.05.03.01.04-Pensões De Reserva 03.05.03.01.90-Pensões De Ex_Presidentes 03.05.03.02-Bolsas De Estudo 03.05.03.03-Evacuação De Doentes 03.05.03.90-Outras Transferências 03.05.04.01-Quotas A Organismos Internacionais 03.05.04.02-Outras Transferências 03.05-Transferências Correntes Total 03.06-Subsídios 03.06.01-Empresas Públicas 03.06.02-Empresas Privadas 03.06.90-Subsídios Diversos 03.06-Subsídios Total 03.07-Outras 03.07.01-Restituições Despesas Correntes 03.07.02-Impostos E Taxas 03.07.03-Indemnizações 03.07.88-Dotação Provisional 03.07.89-Despesas Extraordinárias 03.07.90-Outras Despesas Correntes 03.07-Outras Despesas Correntes Total 03-Despesas Correntes Total 04-Despesas 04.01-Imobilizações De Capital 04.01.03-Habitações Corpóreas 04.01.04-Edifícios 04.01.05-Maquinaria E Equipamentos Basicos 04.01.06-Ferramentas E Utensílios 04.01.07-Equipamentos De Carga E Transporte 04.01.08-Equipamentos Administrativos 04.01.90-Outras Imobilizações Corpóreas 04.01-Imobilizações Corpóreas Total 04-Despesas De Capital Total FUN Total ADIANTAMENTOS POR REGULARIZAR Total Total Geral Ministério Da Economia, Ministerio Da Ministério Da Ministério Do Crescimento Descent., Habi.E Ministério Do Educação e Trabalho, E Gabinete Do Ministério Da Ambiente e Ensino Familia E Competitivida Ministério Da Ordenamento Primeiro Justiça Agricultura Superior Solidariedade de Cultura Do Territorio Ministro 6.457.526 0 31.700.000 27.055.270 2.000.000 10.500.000 13.803.478 16.473.016 30.000.000 Ministro Da Presidencia Conselho Ministro E Reforma Do Estado 427.100 2.500.000 16.377.664 955.000 Ministro Adjunto do Secretário De Gabinete Do Primeiro Ministro Da Ministro e da Estado De Qualificação Juventude E Reforma Do e Emprego Desportos Estado 21.044.426 67.800.000 1.606.951 0 13.617.792 14.271.841 290.101 3.446.640 374.698.653 13.017.000 1.389.750 2.000.000 0 424.589.113 58.673.016 13.017.000 16.148.228 2.500.000 47.718.481 427.100 22.651.377 81.417.792 290.101 0 0 0 0 0 0 0 0 0 0 0 0 0 0 195.625.266 5.437.322.751 0 153.756.445 0 94.648.317 0 44.667.560 0 39.526.550 0 142.254.968 899.686 899.686 76.866.161 0 41.855.566 0 104.065.526 589.066 589.066 2.342.232 3.600.000 1.776.271 292.724 0 485.980.307 54.900 0 0 485.980.307 54.900 0 54.900 0 195.680.166 5.437.322.751 0 0 153.756.445 0 0 94.648.317 0 0 44.667.560 0 0 39.526.550 5.376.271 5.376.271 147.631.239 292.724 292.724 77.158.885 0 0 41.855.566 0 0 104.065.526 0 0 2.342.232 485.980.307 195.680.166 5.437.322.751 153.756.445 94.648.317 44.667.560 39.526.550 147.631.239 77.158.885 41.855.566 104.065.526 2.342.232 CONTAS PROVISÓRIAS 4º TRIMESTRE 2008 Mapa II - Despesas de funcionamento Estado segundo classificação económica e orgânica(Em ECV) Natureza FUN Class. Econom1 Class. Econom2 Económica2 Descrição 03-Despesas 03.01-Despesa Correntes 03.01.01.01-Pessoal Com Pessoal Do Quadro Especial 03.01.01.02-Pessoal Do Quadro 03.01.01.03-Pessoal Contratado 03.01.01.04-Gratificações Permanentes 03.01.01.05-Subsídios Permanentes 03.01.01.06-Despesas De Representação 03.01.02.01-Gratificações Eventuais 03.01.02.02-Horas Extraordinárias 03.01.02.03-Alimentação E Alojamento 03.01.02.04-Subsídio De Instalação 03.01.02.90-Remunerações Diversas 03.01.03.01-Encargos Com A Saúde 03.01.03.02-Abono De Família 03.01.03.03-Contribuições Para A Segurança Social 03.01.03.04-Seguros Acidentes Trabalho 03.01.03.90-Encargos Diversos 03.01.04.01-Aumento Salarial 03.01.04.02-Recrutamentos E Nomeações 03.01.04.03-Progressões 03.01.04.04-Reclassificações 03.01.04.05-Reingressos 03.01.04.06-Promoções 03.01.04.90-Outras Dotações 03.01.90-Outras Despesas Com Pessoal 03.01-Despesa Com Pessoal Total 03.02-Aquisição 03.02.02-Matérias De Bens E Serviços Primas 03.02.03.01-Medicamentos 03.02.03.02-Produtos Alimentares Para Não Funcionários 03.02.03.03-Roupa E Calçado 03.02.03.04-Pequenos Equipamentos 03.02.03.90-Produtos Diversos 03.02.04-Outros Aprovisionamentos 03.02.05.02-Munições E Explosivos 03.02.05.90-Material Diverso 03.02.90-Trabalhos Realizados Por Outrem 03.02-Aquisição De Bens E Serviços Total 03.03-Fornecimentos 03.03.01-Água E Serviços Externos 03.03.02-Electricidade 03.03.03-Combustíveis E Lubrificantes 03.03.04-Conservação E Manutenção 03.03.05-Equipamentos De Desgaste Rápido 03.03.06-Consumo De Secretaria 03.03.07-Rendas E Alugueres 03.03.08-Representação 03.03.09-Comunicações 03.03.10-Seguros 03.03.11-Vigilância E Segurança 03.03.12.01-Ass. Tec. - Residente 03.03.12.02-Ass. Tec. - Não Residente 03.03.13-Deslocações E Estadias 03.03.14-Limpeza, Higiéne E Conforto 03.03.15-Formação 03.03.90-Outros Fornecimentos 03.03-Fornecimentos E Serviços Externos Total 03.04-Encargos 03.04.01-Juros Da Dívida Da Dívida Interna 03.04.02-Juros Da Dívida Externa 03.04.90-Outros Encargos 03.04-Encargos Da Dívida Total Total Serviços Simples Fundos e Serviços Autónomos Total Geral do Ano 363.701.827 18.768.520 382.470.347 6.761.216.237 1.855.531.423 8.616.747.660 241.613.077 436.655.871 678.268.948 25.022.955 9.813.851 34.836.806 413.123.962 170.137.891 583.261.853 8.286.139 1.236.736 9.522.875 413.326.963 17.877.526 431.204.489 5.762.981 19.756.332 25.519.313 59.033.306 119.665.310 178.698.616 5.463.839 123.500 5.587.339 0 3.931.274 3.931.274 48.826.553 1.913.900 50.740.453 19.984.427 7.965.452 27.949.879 152.447.744 73.341.376 225.789.120 198.382 12.340.458 12.538.840 0 267.403 267.403 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 288.599 5.462.818 5.751.417 8.518.296.991 2.754.789.641 11.273.086.632 70.210 0 70.210 93.874.975 110.585.550 204.460.525 49.618.792 28.488.807 78.107.599 1.165.029 61.924.057 63.089.086 11.856.438 7.846.285 19.702.723 1.620.208 384.499 2.004.707 51.743 7.119.999 7.171.742 1.320.496 0 1.320.496 20.805 1.123.847 1.144.652 0 0 159.598.696 217.473.044 377.071.740 54.386.488 16.849.383 71.235.871 187.050.939 55.118.477 242.169.416 61.635.796 66.113.885 127.749.681 50.903.459 28.434.032 79.337.491 10.325.414 8.013.035 18.338.449 41.819.947 21.796.474 63.616.421 83.011.269 29.223.985 112.235.254 17.668.933 1.724.272 19.393.205 240.695.171 42.509.490 283.204.661 15.148.201 15.569.872 30.718.073 52.494.885 15.674.656 68.169.541 15.636.390 10.911.104 26.547.494 9.372.525 455.741 9.828.266 226.523.334 38.685.431 265.208.765 51.522.100 17.720.920 69.243.020 3.987.668 26.713.445 30.701.113 116.336.661 37.117.020 153.453.681 1.238.519.180 432.631.222 1.671.150.402 1.347.222.901 1.347.222.901 548.030.008 548.030.008 1.155.263 1.155.263 1.896.408.172 0 1.896.408.172 CONTAS PROVISÓRIAS 4º TRIMESTRE 2008 Mapa II - Despesas de funcionamento Estado segundo classificação económica e orgânica(Em ECV) Natureza Class. Econom1 Class. Econom2 Económica2 Descrição 03.05-Transferências 03.05.01.01-Fundos Correntes E Serviços Autónomos 03.05.01.02-Municípios 03.05.01.03-Embaixadas E Serviços Consulares 03.05.01.90-Outras Transferências 03.05.02.01-Partidos Políticos 03.05.02.02-Organismos Não-Governamentais 03.05.02.90-Outras Transferências 03.05.03.01.01-Pensões De Aposentação 03.05.03.01.02-Pensões De Sobrevivência 03.05.03.01.03-Pensões De Regime Não Contributivo 03.05.03.01.04-Pensões De Reserva 03.05.03.01.90-Pensões De Ex_Presidentes 03.05.03.02-Bolsas De Estudo 03.05.03.03-Evacuação De Doentes 03.05.03.90-Outras Transferências 03.05.04.01-Quotas A Organismos Internacionais 03.05.04.02-Outras Transferências 03.05-Transferências Correntes Total 03.06-Subsídios 03.06.01-Empresas Públicas 03.06.02-Empresas Privadas 03.06.90-Subsídios Diversos 03.06-Subsídios Total 03.07-Outras 03.07.01-Restituições Despesas Correntes 03.07.02-Impostos E Taxas 03.07.03-Indemnizações 03.07.88-Dotação Provisional 03.07.89-Despesas Extraordinárias 03.07.90-Outras Despesas Correntes 03.07-Outras Despesas Correntes Total 03-Despesas Correntes Total 04-Despesas 04.01-Imobilizações De Capital 04.01.03-Habitações Corpóreas 04.01.04-Edifícios 04.01.05-Maquinaria E Equipamentos Basicos 04.01.06-Ferramentas E Utensílios 04.01.07-Equipamentos De Carga E Transporte 04.01.08-Equipamentos Administrativos 04.01.90-Outras Imobilizações Corpóreas 04.01-Imobilizações Corpóreas Total 04-Despesas De Capital Total FUN Total ADIANTAMENTOS POR REGULARIZAR Total Total Geral Total Serviços Simples 13.991.067 2.475.337.631 293.254.876 239.408.331 35.000.000 27.079.967 207.956.137 1.408.396.422 121.428.400 539.701.028 Fundos e Serviços Autónomos Total Geral do Ano 19.152.000 23.445.859 40.939.319 3.446.640 374.698.653 116.043.647 16.906.750 63.333.036 131.627.983 6.067.610.568 83.512.000 359.631.259 488.784.504 931.927.763 783.176.640 501.927 2.699.740 86.738.845 0 609.719 127.918.975 0 1.316.987.595 86.518.341 22.005.154 2.314.601.551 22.614.873 21.126.962.921 3.514.247.625 1.020.000 242.200 111.500.742 2.636.776 13.755.583 6.539.380 0 138.866 23.595.961 0 11.995.012 3.531.988 4.017.490 165.884.788 13.089.210 165.884.788 13.089.210 21.292.847.709 3.527.336.835 90.273.790 129.926.263 21.383.121.499 3.657.263.098 33.143.067 2.475.337.631 293.254.876 262.854.190 35.000.000 27.079.967 207.956.137 1.408.396.422 121.428.400 539.701.028 40.939.319 3.446.640 374.698.653 116.043.647 16.906.750 63.834.963 134.327.723 6.154.349.413 83.512.000 359.631.259 488.784.504 931.927.763 783.176.640 609.719 127.918.975 0 1.316.987.595 108.523.495 2.337.216.424 24.641.210.546 1.262.200 114.137.518 20.294.963 138.866 23.595.961 15.527.000 4.017.490 178.973.998 178.973.998 24.820.184.544 220.200.053 25.040.384.597 CONTAS PROVISÓRIAS 4º TRIMESTRE 2008 Mapa II-1 Despesas Globais de funcionamento Estado segundo classificação económica Natureza FUN Class. Class. Dotações Orçamento Cabimentado Liquidado Econom1 Econom2 Económica2 Descrição Orçamentais Corrigido 03-Despesas 03.01-Despesa Correntes 03.01.01.01-Pessoal Com Pessoal Do Quadro Especial 410.378.143 425.714.113 383.751.481 383.751.481 03.01.01.02-Pessoal Do Quadro 8.594.896.624 8.837.652.627 8.630.966.211 8.630.966.211 03.01.01.03-Pessoal Contratado 705.750.990 725.317.985 678.994.844 678.994.844 03.01.01.04-Gratificações Permanentes 52.086.289 61.373.624 34.862.353 34.862.353 03.01.01.05-Subsídios Permanentes656.500.232 652.388.202 588.385.928 588.385.928 03.01.01.06-Despesas De Representação 10.516.851 10.711.201 9.524.336 9.524.336 03.01.02.01-Gratificações Eventuais 431.360.828 471.552.024 431.976.922 431.976.922 03.01.02.02-Horas Extraordinárias 25.730.208 25.890.724 25.525.129 25.525.129 03.01.02.03-Alimentação E Alojamento 197.083.052 201.199.052 179.042.856 179.042.856 03.01.02.04-Subsídio De Instalação 13.846.250 14.934.250 5.587.339 5.587.339 03.01.02.90-Remunerações Diversas 13.143.174 15.238.613 3.931.274 3.931.274 03.01.03.01-Encargos Com A Saúde 62.416.920 63.416.920 50.740.453 50.740.453 03.01.03.02-Abono De Família 34.129.374 34.210.774 28.057.113 28.057.113 03.01.03.03-Contribuições Para A Segurança 254.877.550 Social 303.578.225 225.791.497 225.791.497 03.01.03.04-Seguros Acidentes Trabalho 20.694.507 20.414.692 12.538.840 12.538.840 03.01.03.90-Encargos Diversos 934.532 594.532 267.403 267.403 03.01.04.01-Aumento Salarial 212.567.747 39.871.603 0 0 03.01.04.02-Recrutamentos E Nomeações 224.408.797 99.401.124 0 0 03.01.04.03-Progressões 1.064.284 1.064.284 0 0 03.01.04.04-Reclassificações 78.728.759 6.672.499 0 0 03.01.04.05-Reingressos 49.039.724 34.568.404 0 0 03.01.04.06-Promoções 1.170.342 1.170.342 0 0 03.01.04.90-Outras Dotações 83.791.092 32.275.182 0 0 03.01.90-Outras Despesas Com Pessoal 126.947.512 115.435.282 5.751.417 5.751.417 03.01-Despesa Com Pessoal Total 12.262.063.781 12.194.646.278 11.295.695.396 11.295.695.396 03.02-Aquisição 03.02.02-Matérias De Bens E Serviços Primas 1.208.000 108.000 70.210 70.210 03.02.03.01-Medicamentos 311.275.000 305.515.000 204.460.525 204.460.525 03.02.03.02-Produtos Alimentares Para 85.011.100 Não Funcionários 84.111.100 78.113.999 78.113.999 03.02.03.03-Roupa E Calçado 80.557.127 81.615.936 63.089.086 63.089.086 03.02.03.04-Pequenos Equipamentos21.063.040 20.312.058 19.702.723 19.702.723 03.02.03.90-Produtos Diversos 6.576.540 4.930.621 2.004.707 2.004.707 03.02.04-Outros Aprovisionamentos 7.875.000 7.543.250 7.171.742 7.171.742 03.02.05.02-Munições E Explosivos 2.260.000 2.970.000 1.320.496 1.320.496 03.02.05.90-Material Diverso 5.050.000 3.580.000 1.144.652 1.144.652 03.02.90-Trabalhos Realizados Por Outrem 150.000 150.000 0 0 03.02-Aquisição De Bens E Serviços Total 521.025.807 510.835.965 377.078.140 377.078.140 03.03-Fornecimentos 03.03.01-Água E Serviços Externos 93.452.531 95.909.746 71.354.975 71.354.975 03.03.02-Electricidade 185.372.475 276.657.851 242.791.399 242.791.399 03.03.03-Combustíveis E Lubrificantes 157.559.038 162.364.158 129.134.191 129.134.191 03.03.04-Conservação E Manutenção88.537.484 91.687.732 79.529.552 79.529.552 03.03.05-Equipamentos De Desgaste 38.732.465 Rápido 33.453.511 18.338.449 18.338.449 03.03.06-Consumo De Secretaria 79.711.001 80.189.338 63.996.094 63.996.094 03.03.07-Rendas E Alugueres 132.879.919 137.237.419 114.028.647 114.028.647 03.03.08-Representação 24.994.346 25.388.446 20.511.880 20.511.880 03.03.09-Comunicações 206.032.862 318.508.644 283.566.598 283.566.598 03.03.10-Seguros 64.779.807 51.180.098 32.671.795 32.671.795 03.03.11-Vigilância E Segurança 96.252.928 87.492.099 68.399.541 68.399.541 03.03.12.01-Ass. Tec. - Residente 38.080.550 36.956.551 26.583.642 26.583.642 03.03.12.02-Ass. Tec. - Não Residente 5.100.000 10.352.525 9.828.266 9.828.266 03.03.13-Deslocações E Estadias 295.264.081 319.407.080 266.514.084 266.514.084 03.03.14-Limpeza, Higiéne E Conforto90.971.378 81.045.898 69.353.242 69.353.242 03.03.15-Formação 41.423.225 40.395.680 30.968.357 30.968.357 03.03.90-Outros Fornecimentos 174.020.167 181.714.790 155.227.339 155.227.339 03.03-Fornecimentos E Serviços Externos Total 1.813.164.257 2.029.941.566 1.682.798.051 1.682.798.051 03.04-Encargos 03.04.01-Juros Da Dívida Da Dívida Interna 1.487.479.855 1.347.223.081 1.347.222.901 1.347.222.901 03.04.02-Juros Da Dívida Externa 566.206.328 554.606.328 548.030.008 548.030.008 03.04.90-Outros Encargos 20.126.709 2.126.709 1.155.263 1.155.263 03.04-Encargos Da Dívida Total 2.073.812.892 1.903.956.118 1.896.408.172 1.896.408.172 03.05-Transferências 03.05.01.01-Fundos Correntes E Serviços Autónomos 40.105.857 33.988.127 33.143.067 33.143.067 03.05.01.02-Municípios 2.804.453.631 2.736.603.861 2.475.337.631 2.475.337.631 03.05.01.03-Embaixadas E Serviços 293.884.000 Consulares 293.884.000 293.254.876 293.254.876 03.05.01.90-Outras Transferências 212.540.000 273.464.722 262.854.190 262.854.190 03.05.02.01-Partidos Políticos 35.000.000 35.000.000 35.000.000 35.000.000 03.05.02.02-Organismos Não-Governamentais 29.734.000 28.076.232 27.079.967 27.079.967 03.05.02.90-Outras Transferências 239.097.000 222.122.708 208.607.073 208.607.073 03.05.03.01.01-Pensões De Aposentação 1.326.278.430 1.409.018.738 1.408.396.422 1.408.396.422 03.05.03.01.02-Pensões De Sobrevivência 95.139.847 121.975.003 121.428.400 121.428.400 03.05.03.01.03-Pensões De Regime 521.714.478 Não Contributivo539.703.411 539.701.028 539.701.028 03.05.03.01.04-Pensões De Reserva 41.034.770 41.034.770 40.939.319 40.939.319 03.05.03.01.90-Pensões De Ex_Presidentes 3.446.640 3.446.640 3.446.640 3.446.640 03.05.03.02-Bolsas De Estudo 475.000.000 475.000.000 374.698.653 374.698.653 03.05.03.03-Evacuação De Doentes 106.366.689 116.366.689 116.043.647 116.043.647 03.05.03.90-Outras Transferências 16.906.750 16.906.750 16.906.750 16.906.750 03.05.04.01-Quotas A Organismos Internacionais 71.450.200 69.782.259 63.834.963 63.834.963 03.05.04.02-Outras Transferências 82.000.000 134.927.983 134.327.723 134.327.723 03.05-Transferências Correntes Total 6.394.152.292 6.551.301.893 6.155.000.349 6.155.000.349 03.06-Subsídios 03.06.01-Empresas Públicas 83.512.000 83.512.000 83.512.000 83.512.000 03.06.02-Empresas Privadas 359.631.259 359.631.259 359.631.259 359.631.259 03.06.90-Subsídios Diversos 263.486.200 488.786.417 488.784.504 488.784.504 03.06-Subsídios Total 706.629.459 931.929.676 931.927.763 931.927.763 03.07-Outras 03.07.01-Restituições Despesas Correntes 500.000.000 783.978.457 783.176.640 783.176.640 03.07.02-Impostos E Taxas 893.651 893.651 609.719 609.719 03.07.03-Indemnizações 638.500.000 127.978.689 127.918.975 127.918.975 03.07.88-Dotação Provisional 150.000.000 0 0 0 03.07.89-Despesas Extraordinárias1.272.368.701 1.316.988.211 1.316.987.595 1.316.987.595 03.07.90-Outras Despesas Correntes538.389.922 148.549.221 108.523.495 108.523.495 03.07-Outras Despesas Correntes Total 3.100.152.274 2.378.388.229 2.337.216.424 2.337.216.424 03-Despesas Correntes Total 26.871.000.762 26.500.999.725 24.676.124.295 24.676.124.295 04-Despesas 04.01-Imobilizações De Capital 04.01.03-Habitações Corpóreas 8.000.000 2.100.000 1.262.200 1.262.200 04.01.04-Edifícios 47.340.000 135.967.475 115.218.518 115.218.518 04.01.05-Maquinaria E Equipamentos26.431.290 Basicos 31.851.290 20.294.963 20.294.963 04.01.06-Ferramentas E Utensílios 150.000 150.000 138.866 138.866 04.01.07-Equipamentos De Carga E Transporte 47.000.000 45.100.000 23.595.961 23.595.961 Por pagar Pagamentos Jan. a Dezemb Jan. a Dezemb 1.281.134 382.470.347 14.095.775 8.616.747.660 848.672 678.268.948 25.547 34.836.806 5.124.075 583.261.853 1.461 9.522.875 772.433 431.204.489 5.816 25.519.313 344.240 178.698.616 0 5.587.339 0 3.931.274 0 50.740.453 107.234 27.949.879 2.377 225.789.120 0 12.538.840 0 267.403 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5.751.417 22.608.764 11.273.086.632 0 70.210 0 204.460.525 6.400 78.107.599 0 63.089.086 0 19.702.723 0 2.004.707 0 7.171.742 0 1.320.496 0 1.144.652 0 0 6.400 377.071.740 119.104 71.235.871 621.983 242.169.416 1.384.510 127.749.681 192.061 79.337.491 0 18.338.449 379.673 63.616.421 1.793.393 112.235.254 1.118.675 19.393.205 361.937 283.204.661 1.953.722 30.718.073 230.000 68.169.541 36.148 26.547.494 0 9.828.266 1.305.319 265.208.765 110.222 69.243.020 267.244 30.701.113 1.773.658 153.453.681 11.647.649 1.671.150.402 0 1.347.222.901 0 548.030.008 0 1.155.263 0 1.896.408.172 0 33.143.067 0 2.475.337.631 0 293.254.876 0 262.854.190 0 35.000.000 0 27.079.967 650.936 207.956.137 0 1.408.396.422 0 121.428.400 0 539.701.028 0 40.939.319 0 3.446.640 0 374.698.653 0 116.043.647 0 16.906.750 0 63.834.963 0 134.327.723 650.936 6.154.349.413 0 83.512.000 0 359.631.259 0 488.784.504 0 931.927.763 0 783.176.640 0 609.719 0 127.918.975 0 0 0 1.316.987.595 0 108.523.495 0 2.337.216.424 34.913.749 24.641.210.546 0 1.262.200 1.081.000 114.137.518 0 20.294.963 0 138.866 0 23.595.961 Total Geral Executado 383.751.481 8.630.843.435 679.117.620 34.862.353 588.385.928 9.524.336 431.976.922 25.525.129 179.042.856 5.587.339 3.931.274 50.740.453 28.057.113 225.791.497 12.538.840 267.403 0 0 0 0 0 0 0 5.751.417 11.295.695.396 70.210 204.460.525 78.113.999 63.089.086 19.702.723 2.004.707 7.171.742 1.320.496 1.144.652 0 377.078.140 71.354.975 242.791.399 129.134.191 79.529.552 18.338.449 63.996.094 114.028.647 20.511.880 283.566.598 32.671.795 68.399.541 26.583.642 9.828.266 266.514.084 69.353.242 30.968.357 155.227.339 1.682.798.051 1.347.222.901 548.030.008 1.155.263 1.896.408.172 33.143.067 2.475.337.631 293.254.876 262.854.190 35.000.000 27.079.967 208.607.073 1.408.396.422 121.428.400 539.701.028 40.939.319 3.446.640 374.698.653 116.043.647 16.906.750 63.834.963 134.327.723 6.155.000.349 83.512.000 359.631.259 488.784.504 931.927.763 783.176.640 609.719 127.918.975 0 1.316.987.595 108.523.495 2.337.216.424 24.676.124.295 1.262.200 115.218.518 20.294.963 138.866 23.595.961 %_1 1,5% 34,4% 2,7% 0,1% 2,3% 0,0% 1,7% 0,1% 0,7% 0,0% 0,0% 0,2% 0,1% 0,9% 0,1% 0,0% 0,0% 0,0% 0,0% 0,0% 0,0% 0,0% 0,0% 0,0% 45,0% 0,0% 0,8% 0,3% 0,3% 0,1% 0,0% 0,0% 0,0% 0,0% 0,0% 1,5% 0,3% 1,0% 0,5% 0,3% 0,1% 0,3% 0,5% 0,1% 1,1% 0,1% 0,3% 0,1% 0,0% 1,1% 0,3% 0,1% 0,6% 6,7% 5,4% 2,2% 0,0% 7,6% 0,1% 9,9% 1,2% 1,0% 0,1% 0,1% 0,8% 5,6% 0,5% 2,2% 0,2% 0,0% 1,5% 0,5% 0,1% 0,3% 0,5% 24,5% 0,3% 1,4% 1,9% 3,7% 3,1% 0,0% 0,5% 0,0% 5,3% 0,4% 9,3% 98,4% 0,0% 0,5% 0,1% 0,0% 0,1% Exe % 90,1% 97,7% 93,6% 56,8% 90,2% 88,9% 91,6% 98,6% 89,0% 37,4% 25,8% 80,0% 82,0% 74,4% 61,4% 45,0% 0,0% 0,0% 0,0% 0,0% 0,0% 0,0% 0,0% 5,0% 92,6% 65,0% 66,9% 92,9% 77,3% 97,0% 40,7% 95,1% 44,5% 32,0% 0,0% 73,8% 74,4% 87,8% 79,5% 86,7% 54,8% 79,8% 83,1% 80,8% 89,0% 63,8% 78,2% 71,9% 94,9% 83,4% 85,6% 76,7% 85,4% 82,9% 100,0% 98,8% 54,3% 99,6% 97,5% 90,5% 99,8% 96,1% 100,0% 96,5% 93,9% 100,0% 99,6% 100,0% 99,8% 100,0% 78,9% 99,7% 100,0% 91,5% 99,6% 94,0% 100,0% 100,0% 100,0% 100,0% 99,9% 68,2% 100,0% 0,0% 100,0% 73,1% 98,3% 93,1% 60,1% 84,7% 63,7% 92,6% 52,3% CONTAS PROVISÓRIAS 4º TRIMESTRE 2008 Mapa II-1 Despesas Globais de funcionamento Estado segundo classificação económica Natureza Class. Class. Econom1 Econom2 Económica2 Descrição Dotações Orçamentais Orçamento Corrigido Cabimentado Liquidado 04.01.08-Equipamentos Administrativos6.773.360 20.265.633 15.554.700 15.554.700 04.01.90-Outras Imobilizações Corpóreas 7.500.000 4.481.289 4.017.490 4.017.490 04.01-Imobilizações Corpóreas Total 143.194.650 239.915.687 180.082.698 180.082.698 04-Despesas De Capital Total 143.194.650 239.915.687 180.082.698 180.082.698 FUN Total 27.014.195.412 26.740.915.412 24.856.206.993 24.856.206.993 ADIANTAMENTOS POR REGULARIZAR Total 220.200.053 220.200.053 Total Geral 27.014.195.412 26.740.915.412 25.076.407.046 25.076.407.046 Por pagar Pagamentos Jan. a Dezemb Jan. a Dezemb Total Geral Executado %_1 27.700 15.527.000 15.554.700 0,1% 0 4.017.490 4.017.490 0,0% 1.108.700 178.973.998 180.082.698 0,7% 1.108.700 178.973.998 180.082.698 0,7% 36.022.449 24.820.184.544 24.856.206.993 99,1% 220.200.053 220.200.053 0,9% 36.022.449 25.040.384.597 25.076.407.046 100,0% Exe % 76,8% 89,7% 75,1% 75,1% 93,0% 93,8% CONTAS PROVISÓRIAS 4º TRIMESTRE 2008 Mapa II-1.1 Despesas Globais de funcionamento de ENCARGOS GERAIS DA NAÇÃO segundo classificação económica Class. Class. Dotações Orçamento Cabimentado Econom1 Econom2 Económica2 Descrição Orçamentais Corrigido FUN 03-Despesas 03.01-Despesa Correntes03.01.01.01-Pessoal Com Pessoal Do Quadro178.794.144 Especial 188.453.813 181.036.941 03.01.01.02-Pessoal Do Quadro170.750.598 170.214.139 155.172.238 03.01.01.03-Pessoal Contratado 21.277.692 23.518.480 22.373.365 03.01.01.04-Gratificações Permanentes 1.416.936 10.601.412 1.399.792 03.01.01.05-Subsídios Permanentes 25.364.623 30.939.793 22.999.519 03.01.01.06-Despesas De Representação 3.425.600 3.425.600 3.206.895 03.01.02.01-Gratificações Eventuais 2.074.000 2.614.000 1.468.248 03.01.02.02-Horas Extraordinárias5.319.919 5.583.919 4.584.039 03.01.02.03-Alimentação E Alojamento 3.000.000 2.556.000 925.556 03.01.02.04-Subsídio De Instalação500.000 1.588.000 1.588.000 03.01.02.90-Remunerações Diversas 500.000 0 0 03.01.03.01-Encargos Com A Saúde 6.100.000 7.100.000 6.583.827 03.01.03.02-Abono De Família 854.400 854.400 810.975 03.01.03.03-Contribuições Para A 9.541.498 Segurança Social 10.050.963 6.833.793 03.01.04.01-Aumento Salarial 3.567.747 3.567.747 0 03.01.04.02-Recrutamentos E Nomeações 21.226.026 18.515.533 0 03.01.04.03-Progressões 1.064.284 1.064.284 0 03.01.04.04-Reclassificações 217.992 217.992 0 03.01.04.05-Reingressos 1.852.722 1.852.722 0 03.01.04.06-Promoções 1.170.342 1.170.342 0 03.01.04.90-Outras Dotações 36.343 36.343 0 03.01.90-Outras Despesas Com Pessoal 151.631 406.329 288.599 03.01-Despesa Com Pessoal Total 458.206.497 484.331.811 409.271.787 03.02-Aquisição 03.02.03.03-Roupa De Bens E Serviços E Calçado 1.499.130 1.979.412 1.049.966 03.02.03.04-Pequenos Equipamentos 3.500.000 3.000.000 2.810.989 03.02.03.90-Produtos Diversos 40.000 40.000 0 03.02-Aquisição De Bens E Serviços Total 5.039.130 5.019.412 3.860.955 03.03-Fornecimentos 03.03.01-Água E Serviços Externos 12.904.000 13.414.170 8.331.680 03.03.02-Electricidade 19.320.000 25.970.000 24.162.234 03.03.03-Combustíveis E Lubrificantes 21.175.600 21.828.800 20.442.266 03.03.04-Conservação E Manutenção 10.050.000 11.325.028 9.351.944 03.03.05-Equipamentos De Desgaste 2.760.000 Rápido 2.860.000 1.307.312 03.03.06-Consumo De Secretaria11.055.000 11.451.377 10.355.054 03.03.07-Rendas E Alugueres 9.624.000 15.724.000 11.573.892 03.03.08-Representação 11.975.500 12.975.500 9.897.413 03.03.09-Comunicações 41.026.545 42.026.545 30.392.099 03.03.10-Seguros 8.499.872 8.588.448 3.626.218 03.03.11-Vigilância E Segurança 8.505.700 8.505.700 7.307.600 03.03.12.01-Ass. Tec. - Residente1.250.000 3.250.000 907.079 03.03.13-Deslocações E Estadias 95.100.000 96.647.443 75.231.440 03.03.14-Limpeza, Higiéne E Conforto 15.005.000 15.412.223 12.747.575 03.03.15-Formação 4.350.000 4.350.000 3.322.668 03.03.90-Outros Fornecimentos 19.786.832 28.838.474 26.242.068 03.03-Fornecimentos E Serviços Externos Total 292.388.049 323.167.708 255.198.542 03.05-Transferências 03.05.01.90-Outras CorrentesTransferências 17.500.000 11.500.000 1.847.946 03.05.02.90-Outras Transferências5.000.000 5.000.000 3.777.076 03.05.04.01-Quotas A Organismos5.525.000 Internacionais 5.278.259 941.911 03.05.04.02-Outras Transferências 600.000 600.000 0 03.05-Transferências Correntes Total 28.625.000 22.378.259 6.566.933 03.07-Outras 03.07.90-Outras Despesas Correntes Despesas Correntes 4.638.400 6.138.400 4.429.365 03.07-Outras Despesas Correntes Total 4.638.400 6.138.400 4.429.365 03-Despesas Correntes Total 788.897.076 841.035.590 679.327.582 04-Despesas 04.01-Imobilizações De Capital 04.01.03-Habitações Corpóreas 1.000.000 1.100.000 1.020.000 04.01.04-Edifícios 24.340.000 22.340.000 8.733.144 04.01.05-Maquinaria E Equipamentos 9.820.000 Basicos 16.320.000 12.994.633 04.01.06-Ferramentas E Utensílios 150.000 150.000 0 04.01.07-Equipamentos De Carga 40.500.000 E Transporte 31.900.000 13.715.961 04.01.08-Equipamentos Administrativos 5.023.360 8.423.360 4.754.341 04.01.90-Outras Imobilizações Corpóreas 5.000.000 0 0 04.01-Imobilizações Corpóreas Total 85.833.360 80.233.360 41.218.079 04-Despesas De Capital Total 85.833.360 80.233.360 41.218.079 FUN Total 874.730.436 921.268.950 720.545.661 ADIANTAMENTOS POR REGULARIZAR Total Total Geral 874.730.436 921.268.950 720.545.661 Liquidado Natureza 181.036.941 155.172.238 22.373.365 1.399.792 22.999.519 3.206.895 1.468.248 4.584.039 925.556 1.588.000 0 6.583.827 810.975 6.833.793 0 0 0 0 0 0 0 288.599 409.271.787 1.049.966 2.810.989 0 3.860.955 8.331.680 24.162.234 20.442.266 9.351.944 1.307.312 10.355.054 11.573.892 9.897.413 30.392.099 3.626.218 7.307.600 907.079 75.231.440 12.747.575 3.322.668 26.242.068 255.198.542 1.847.946 3.777.076 941.911 0 6.566.933 4.429.365 4.429.365 679.327.582 1.020.000 8.733.144 12.994.633 0 13.715.961 4.754.341 0 41.218.079 41.218.079 720.545.661 720.545.661 Por pagar Pagamentos Jan. a Dezemb Jan. a Dezemb 1.281.134 90.866 655.957 1.547 1.538.743 1.461 66 5.816 0 0 0 0 266 2.377 0 0 0 0 0 0 0 0 3.578.233 0 0 0 0 35.370 325.338 1.018.815 46.728 0 97.342 323.393 1.118.675 127.000 0 109.250 36.148 878.554 35.075 6.000 1.617.601 5.775.289 0 650.936 0 0 650.936 0 0 10.004.458 0 1.081.000 0 0 0 27.700 0 1.108.700 1.108.700 11.113.158 179.755.807 155.081.372 21.717.408 1.398.245 21.460.776 3.205.434 1.468.182 4.578.223 925.556 1.588.000 0 6.583.827 810.709 6.831.416 0 0 0 0 0 0 0 288.599 405.693.554 1.049.966 2.810.989 0 3.860.955 8.296.310 23.836.896 19.423.451 9.305.216 1.307.312 10.257.712 11.250.499 8.778.738 30.265.099 3.626.218 7.198.350 870.931 74.352.886 12.712.500 3.316.668 24.624.467 249.423.253 1.847.946 3.126.140 941.911 0 5.915.997 4.429.365 4.429.365 669.323.124 1.020.000 7.652.144 12.994.633 0 13.715.961 4.726.641 0 40.109.379 40.109.379 709.432.503 90.273.790 11.113.158 799.706.293 Total Geral Exe Executado %_1 % 181.036.941 22,3% 96,1% 155.172.238 19,1% 91,2% 22.373.365 2,8% 95,1% 1.399.792 0,2% 13,2% 22.999.519 2,8% 74,3% 3.206.895 0,4% 93,6% 1.468.248 0,2% 56,2% 4.584.039 0,6% 82,1% 925.556 0,1% 36,2% 1.588.000 0,2% 100,0% 0 0,0% 0,0% 6.583.827 0,8% 92,7% 810.975 0,1% 94,9% 6.833.793 0,8% 68,0% 0 0,0% 0,0% 0 0,0% 0,0% 0 0,0% 0,0% 0 0,0% 0,0% 0 0,0% 0,0% 0 0,0% 0,0% 0 0,0% 0,0% 288.599 0,0% 71,0% 409.271.787 50,5% 84,5% 1.049.966 0,1% 53,0% 2.810.989 0,3% 93,7% 0 0,0% 0,0% 3.860.955 0,5% 76,9% 8.331.680 1,0% 62,1% 24.162.234 3,0% 93,0% 20.442.266 2,5% 93,6% 9.351.944 1,2% 82,6% 1.307.312 0,2% 45,7% 10.355.054 1,3% 90,4% 11.573.892 1,4% 73,6% 9.897.413 1,2% 76,3% 30.392.099 3,7% 72,3% 3.626.218 0,4% 42,2% 7.307.600 0,9% 85,9% 907.079 0,1% 27,9% 75.231.440 9,3% 77,8% 12.747.575 1,6% 82,7% 3.322.668 0,4% 76,4% 26.242.068 3,2% 91,0% 255.198.542 31,5% 79,0% 1.847.946 0,2% 16,1% 3.777.076 0,5% 75,5% 941.911 0,1% 17,8% 0 0,0% 0,0% 6.566.933 0,8% 29,3% 4.429.365 0,5% 72,2% 4.429.365 0,5% 72,2% 679.327.582 83,8% 80,8% 1.020.000 0,1% 92,7% 8.733.144 1,1% 39,1% 12.994.633 1,6% 79,6% 0 0,0% 0,0% 13.715.961 1,7% 43,0% 4.754.341 0,6% 56,4% 0 0,0% 0,0% 41.218.079 5,1% 51,4% 41.218.079 5,1% 51,4% 720.545.661 88,9% 78,2% 90.273.790 11,1% 810.819.451 100,0% 88,0% CONTAS PROVISÓRIAS 4º TRIMESTRE 2008 Mapa II-1.2 Despesas Globais de funcionamento do GOVERNO E CHEFIA DO GOVERNO segundo classificação económica Em ECV Class. Class. Dotações Orçamento Cabimentado Liquidado Económica2 Descrição Orçamentais Corrigido Natureza Econom1 Econom2 FUN 03-Despesas 03.01-Despesa Correntes 03.01.01.01-Pessoal Com Pessoal Do Quadro Especial 204.300.552 213.006.853 183.946.020 183.946.020 03.01.01.02-Pessoal Do Quadro 6.430.234.409 6.684.992.544 6.606.134.865 6.606.134.865 03.01.01.03-Pessoal Contratado 320.757.209 265.871.093 219.895.669 219.895.669 03.01.01.04-Gratificações Permanentes 36.469.110 36.571.969 23.624.710 23.624.710 03.01.01.05-Subsídios Permanentes444.080.608 432.891.960 391.663.186 391.663.186 03.01.01.06-Despesas De Representação 5.946.451 6.140.801 5.080.705 5.080.705 03.01.02.01-Gratificações Eventuais 396.781.644 435.252.911 411.858.781 411.858.781 03.01.02.02-Horas Extraordinárias 6.189.601 6.322.988 1.184.758 1.184.758 03.01.02.03-Alimentação E Alojamento 68.461.040 68.461.040 58.107.750 58.107.750 03.01.02.04-Subsídio De Instalação 7.880.000 7.880.000 3.875.839 3.875.839 03.01.02.90-Remunerações Diversas 5.085.844 4.085.844 0 0 03.01.03.01-Encargos Com A Saúde 54.066.920 54.066.920 42.242.726 42.242.726 03.01.03.02-Abono De Família 22.281.444 22.353.244 19.173.718 19.173.718 03.01.03.03-Contribuições Para A Segurança 129.670.488 Social 180.926.919 145.616.328 145.616.328 03.01.03.04-Seguros Acidentes Trabalho 3.198.382 3.198.382 198.382 198.382 03.01.03.90-Encargos Diversos 344.532 4.532 0 0 03.01.04.01-Aumento Salarial 209.000.000 36.303.856 0 0 03.01.04.02-Recrutamentos E Nomeações 153.078.373 64.918.441 0 0 03.01.04.04-Reclassificações 73.603.499 4.714.399 0 0 03.01.04.05-Reingressos 36.909.685 23.787.365 0 0 03.01.04.90-Outras Dotações 73.268.996 29.056.533 0 0 03.01.90-Outras Despesas Com Pessoal 111.191.380 100.168.152 0 0 03.01-Despesa Com Pessoal Total 8.792.800.167 8.680.976.746 8.112.603.437 8.112.603.437 03.02-Aquisição 03.02.02-Matérias De Bens E Serviços Primas 108.000 108.000 70.210 70.210 03.02.03.01-Medicamentos 107.100.000 107.100.000 93.874.975 93.874.975 03.02.03.02-Produtos Alimentares Para 56.304.900 Não Funcionários 56.304.900 49.618.792 49.618.792 03.02.03.03-Roupa E Calçado 8.490.600 6.310.600 115.063 115.063 03.02.03.04-Pequenos Equipamentos12.867.000 12.636.308 9.045.449 9.045.449 03.02.03.90-Produtos Diversos 5.519.540 4.323.621 1.620.208 1.620.208 03.02.04-Outros Aprovisionamentos 389.000 389.000 51.743 51.743 03.02.05.02-Munições E Explosivos 500.000 1.470.000 1.320.496 1.320.496 03.02.05.90-Material Diverso 1.000.000 30.000 20.805 20.805 03.02.90-Trabalhos Realizados Por Outrem 150.000 150.000 0 0 03.02-Aquisição De Bens E Serviços Total 192.429.040 188.822.429 155.737.741 155.737.741 03.03-Fornecimentos 03.03.01-Água E Serviços Externos 54.322.947 55.660.947 46.090.178 46.090.178 03.03.02-Electricidade 93.418.729 172.534.305 163.214.043 163.214.043 03.03.03-Combustíveis E Lubrificantes58.104.440 60.820.860 42.212.345 42.212.345 03.03.04-Conservação E Manutenção51.115.760 54.192.230 41.598.243 41.598.243 03.03.05-Equipamentos De Desgaste 19.742.243 Rápido 15.251.564 9.018.102 9.018.102 03.03.06-Consumo De Secretaria 42.095.345 41.692.105 31.562.235 31.562.235 03.03.07-Rendas E Alugueres 81.029.169 78.786.669 71.760.770 71.760.770 03.03.08-Representação 9.997.846 9.997.846 8.890.195 8.890.195 03.03.09-Comunicações 115.035.597 225.014.351 210.430.072 210.430.072 03.03.10-Seguros 13.227.220 14.075.373 11.521.983 11.521.983 03.03.11-Vigilância E Segurança 63.265.100 57.014.021 45.296.535 45.296.535 03.03.12.01-Ass. Tec. - Residente 19.563.706 19.620.207 14.765.459 14.765.459 03.03.12.02-Ass. Tec. - Não Residente 0 9.372.525 9.372.525 9.372.525 03.03.13-Deslocações E Estadias 147.450.986 171.453.271 152.170.448 152.170.448 03.03.14-Limpeza, Higiéne E Conforto54.382.761 43.914.128 38.809.600 38.809.600 03.03.15-Formação 2.889.139 1.491.639 671.000 671.000 03.03.90-Outros Fornecimentos 119.460.663 114.500.404 91.737.688 91.737.688 03.03-Fornecimentos E Serviços Externos Total 945.101.651 1.145.392.445 989.121.421 989.121.421 03.04-Encargos 03.04.01-Juros Da Dívida Da Dívida Interna 1.487.479.855 1.347.223.081 1.347.222.901 1.347.222.901 03.04.02-Juros Da Dívida Externa 566.206.328 554.606.328 548.030.008 548.030.008 03.04.90-Outros Encargos 20.126.709 2.126.709 1.155.263 1.155.263 03.04-Encargos Da Dívida Total 2.073.812.892 1.903.956.118 1.896.408.172 1.896.408.172 03.05-Transferências 03.05.01.01-Fundos Correntes E Serviços Autónomos 19.945.857 14.828.127 13.991.067 13.991.067 03.05.01.02-Municípios 2.804.453.631 2.736.603.861 2.475.337.631 2.475.337.631 03.05.01.03-Embaixadas E Serviços 293.884.000 Consulares 293.884.000 293.254.876 293.254.876 03.05.01.90-Outras Transferências 171.240.000 238.164.722 237.560.385 237.560.385 03.05.02.01-Partidos Políticos 35.000.000 35.000.000 35.000.000 35.000.000 03.05.02.02-Organismos Não-Governamentais 29.734.000 28.076.232 27.079.967 27.079.967 03.05.02.90-Outras Transferências 234.097.000 217.122.708 204.829.997 204.829.997 03.05.03.01.01-Pensões De Aposentação 1.326.278.430 1.409.018.738 1.408.396.422 1.408.396.422 03.05.03.01.02-Pensões De Sobrevivência 95.139.847 121.975.003 121.428.400 121.428.400 03.05.03.01.03-Pensões De Regime 521.714.478 Não Contributivo539.703.411 539.701.028 539.701.028 03.05.03.01.90-Pensões De Ex_Presidentes 3.446.640 3.446.640 3.446.640 3.446.640 03.05.03.02-Bolsas De Estudo 475.000.000 475.000.000 374.698.653 374.698.653 03.05.03.03-Evacuação De Doentes 106.366.689 116.366.689 116.043.647 116.043.647 03.05.03.90-Outras Transferências 16.906.750 16.906.750 16.906.750 16.906.750 03.05.04.01-Quotas A Organismos Internacionais 62.500.000 62.500.000 62.391.125 62.391.125 03.05.04.02-Outras Transferências 80.000.000 131.627.983 131.627.983 131.627.983 03.05-Transferências Correntes Total 6.275.707.322 6.440.224.864 6.061.694.571 6.061.694.571 03.06-Subsídios 03.06.01-Empresas Públicas 83.512.000 83.512.000 83.512.000 83.512.000 03.06.02-Empresas Privadas 359.631.259 359.631.259 359.631.259 359.631.259 03.06.90-Subsídios Diversos 263.486.200 488.786.417 488.784.504 488.784.504 03.06-Subsídios Total 706.629.459 931.929.676 931.927.763 931.927.763 03.07-Outras 03.07.01-Restituições Despesas Correntes 500.000.000 783.978.457 783.176.640 783.176.640 03.07.03-Indemnizações 638.500.000 127.978.689 127.918.975 127.918.975 03.07.88-Dotação Provisional 150.000.000 0 0 0 03.07.89-Despesas Extraordinárias1.272.368.701 1.316.988.211 1.316.987.595 1.316.987.595 03.07.90-Outras Despesas Correntes512.925.914 117.585.213 82.088.976 82.088.976 03.07-Outras Despesas Correntes Total 3.073.794.615 2.346.530.570 2.310.172.186 2.310.172.186 03-Despesas Correntes Total 22.060.275.146 21.637.832.848 20.457.665.291 20.457.665.291 04-Despesas 04.01-Imobilizações De Capital 04.01.03-Habitações Corpóreas 6.000.000 0 0 0 04.01.04-Edifícios 20.000.000 110.627.475 103.848.598 103.848.598 04.01.05-Maquinaria E Equipamentos Basicos 0 845.500 760.950 760.950 04.01.07-Equipamentos De Carga E Transporte 4.000.000 10.700.000 9.880.000 9.880.000 04.01.08-Equipamentos Administrativos 0 8.337.773 7.268.371 7.268.371 04.01.90-Outras Imobilizações Corpóreas 2.500.000 4.481.289 4.017.490 4.017.490 04.01-Imobilizações Corpóreas Total 32.500.000 134.992.037 125.775.409 125.775.409 04-Despesas De Capital Total 32.500.000 134.992.037 125.775.409 125.775.409 FUN Total 22.092.775.146 21.772.824.885 20.583.440.700 20.583.440.700 ADIANTAMENTOS POR REGULARIZAR Total Total Geral 22.092.775.146 21.772.824.885 20.583.440.700 20.583.440.700 Por pagar Pagamentos Jan. a Dezemb Jan. a Dezemb Total Geral Executado 183.946.020 6.606.134.865 219.895.669 23.624.710 391.663.186 5.080.705 411.858.781 1.184.758 58.107.750 3.875.839 0 42.242.726 19.173.718 145.616.328 198.382 0 0 0 0 0 0 0 8.112.603.437 70.210 93.874.975 49.618.792 115.063 9.045.449 1.620.208 51.743 1.320.496 20.805 0 155.737.741 46.090.178 163.214.043 42.212.345 41.598.243 0 183.946.020 0 6.606.134.865 0 219.895.669 0 23.624.710 0 391.663.186 0 5.080.705 0 411.858.781 0 1.184.758 0 58.107.750 0 3.875.839 0 0 0 42.242.726 0 19.173.718 0 145.616.328 0 198.382 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8.112.603.437 0 70.210 0 93.874.975 0 49.618.792 0 115.063 0 9.045.449 0 1.620.208 0 51.743 0 1.320.496 0 20.805 0 0 0 155.737.741 0 46.090.178 0 163.214.043 0 42.212.345 0 41.598.243 0 9.018.102 0 31.562.235 31.562.235 0 71.760.770 71.760.770 0 8.890.195 8.890.195 0 210.430.072 210.430.072 0 11.521.983 11.521.983 0 45.296.535 45.296.535 0 14.765.459 14.765.459 0 9.372.525 9.372.525 0 152.170.448 152.170.448 0 38.809.600 38.809.600 0 671.000 671.000 25.494 91.712.194 91.737.688 25.494 989.095.927 980.103.319 0 1.347.222.901 1.347.222.901 0 548.030.008 548.030.008 0 1.155.263 1.155.263 0 1.896.408.172 1.896.408.172 0 13.991.067 13.991.067 0 2.475.337.631 2.475.337.631 0 293.254.876 293.254.876 0 237.560.385 237.560.385 0 35.000.000 35.000.000 0 27.079.967 27.079.967 0 204.829.997 204.829.997 0 1.408.396.422 1.408.396.422 0 121.428.400 121.428.400 0 539.701.028 539.701.028 0 3.446.640 3.446.640 0 374.698.653 374.698.653 0 116.043.647 116.043.647 0 16.906.750 16.906.750 0 62.391.125 62.391.125 0 131.627.983 131.627.983 0 6.061.694.571 6.061.694.571 0 83.512.000 83.512.000 0 359.631.259 359.631.259 0 488.784.504 488.784.504 0 931.927.763 931.927.763 0 783.176.640 783.176.640 0 127.918.975 127.918.975 0 0 0 0 1.316.987.595 1.316.987.595 0 82.088.976 82.088.976 0 2.310.172.186 2.310.172.186 25.494 20.457.639.797 20.448.647.189 0 0 0 0 103.848.598 103.848.598 0 760.950 760.950 0 9.880.000 9.880.000 0 7.268.371 7.268.371 0 4.017.490 4.017.490 0 125.775.409 125.775.409 0 125.775.409 125.775.409 25.494 20.583.415.206 20.574.422.598 0 0 25.494 20.583.415.206 20.574.422.598 %_1 0,9% 32,1% 1,1% 0,1% 1,9% 0,0% 2,0% 0,0% 0,3% 0,0% 0,0% 0,2% 0,1% 0,7% 0,0% 0,0% 0,0% 0,0% 0,0% 0,0% 0,0% 0,0% 39,4% 0,0% 0,5% 0,2% 0,0% 0,0% 0,0% 0,0% 0,0% 0,0% 0,0% 0,8% 0,2% 0,8% 0,2% 0,2% 0,0% 0,2% 0,3% 0,0% 1,0% 0,1% 0,2% 0,1% 0,0% 0,7% 0,2% 0,0% 0,4% 4,8% 6,5% 2,7% 0,0% 9,2% 0,1% 12,0% 1,4% 1,2% 0,2% 0,1% 1,0% 6,8% 0,6% 2,6% 0,0% 1,8% 0,6% 0,1% 0,3% 0,6% 29,5% 0,4% 1,7% 2,4% 4,5% 3,8% 0,6% 0,0% 6,4% 0,4% 11,2% 99,4% 0,0% 0,5% 0,0% 0,0% 0,0% 0,0% 0,6% 0,6% 100,0% 0,0% 100,0% Exe % 86,4% 98,8% 82,7% 64,6% 90,5% 82,7% 94,6% 18,7% 84,9% 49,2% 0,0% 78,1% 85,8% 80,5% 6,2% 0,0% 0,0% 0,0% 0,0% 0,0% 0,0% 0,0% 93,5% 65,0% 87,7% 88,1% 1,8% 71,6% 37,5% 13,3% 89,8% 69,4% 0,0% 82,5% 82,8% 94,6% 69,4% 76,8% 0,0% 75,7% 91,1% 88,9% 93,5% 81,9% 79,4% 75,3% 100,0% 88,8% 88,4% 45,0% 80,1% 85,6% 100,0% 98,8% 54,3% 99,6% 94,4% 90,5% 99,8% 99,7% 100,0% 96,5% 94,3% 100,0% 99,6% 100,0% 100,0% 78,9% 99,7% 100,0% 99,8% 100,0% 94,1% 100,0% 100,0% 100,0% 100,0% 99,9% 100,0% 0,0% 100,0% 69,8% 98,5% 94,5% 0,0% 93,9% 90,0% 92,3% 87,2% 89,7% 93,2% 93,2% 94,5% 0,0% 94,5% CONTAS PROVISÓRIAS 4º TRIMESTRE 2008 Mapa II-1.3 Despesas Globais de funcionamento dos SERVIÇOS E FUNDOS AUTÓNOMOS segundo classificação económica Class. Class. Dotações Orçamento Cabimentado Econom1 Econom2 Económica2 Descrição Orçamentais Corrigido FUN 03-Despesas 03.01-Despesa Correntes03.01.01.01-Pessoal Com Pessoal Do Quadro Especial 27.283.447 24.253.447 18.768.520 03.01.01.02-Pessoal Do Quadro 1.993.911.617 1.982.445.944 1.869.659.108 03.01.01.03-Pessoal Contratado 363.716.089 435.928.412 436.725.810 03.01.01.04-Gratificações Permanentes 14.200.243 14.200.243 9.837.851 03.01.01.05-Subsídios Permanentes 187.055.001 188.556.449 173.723.223 03.01.01.06-Despesas De Representação 1.144.800 1.144.800 1.236.736 03.01.02.01-Gratificações Eventuais 32.505.184 33.685.113 18.649.893 03.01.02.02-Horas Extraordinárias 14.220.688 13.983.817 19.756.332 03.01.02.03-Alimentação E Alojamento 125.622.012 130.182.012 120.009.550 03.01.02.04-Subsídio De Instalação 5.466.250 5.466.250 123.500 03.01.02.90-Remunerações Diversas 7.557.330 11.152.769 3.931.274 03.01.03.01-Encargos Com A Saúde 2.250.000 2.250.000 1.913.900 03.01.03.02-Abono De Família 10.993.530 11.003.130 8.072.420 03.01.03.03-Contribuições Para A Segurança 115.665.564 Social 112.600.343 73.341.376 03.01.03.04-Seguros Acidentes Trabalho 17.496.125 17.216.310 12.340.458 03.01.03.90-Encargos Diversos 590.000 590.000 267.403 03.01.04.02-Recrutamentos E Nomeações 50.104.398 15.967.150 0 03.01.04.04-Reclassificações 4.907.268 1.740.108 0 03.01.04.05-Reingressos 10.277.317 8.928.317 0 03.01.04.90-Outras Dotações 10.485.753 3.182.306 0 03.01.90-Outras Despesas Com Pessoal 15.604.501 14.860.801 5.462.818 03.01-Despesa Com Pessoal Total 3.011.057.117 3.029.337.721 2.773.820.172 03.02-Aquisição 03.02.02-Matérias De Bens E Serviços Primas 1.100.000 0 0 03.02.03.01-Medicamentos 204.175.000 198.415.000 110.585.550 03.02.03.02-Produtos Alimentares Para 28.706.200 Não Funcionários 27.806.200 28.495.207 03.02.03.03-Roupa E Calçado 70.567.397 73.325.924 61.924.057 03.02.03.04-Pequenos Equipamentos 4.696.040 4.675.750 7.846.285 03.02.03.90-Produtos Diversos 1.017.000 567.000 384.499 03.02.04-Outros Aprovisionamentos 7.486.000 7.154.250 7.119.999 03.02.05.02-Munições E Explosivos 1.760.000 1.500.000 0 03.02.05.90-Material Diverso 4.050.000 3.550.000 1.123.847 03.02-Aquisição De Bens E Serviços Total 323.557.637 316.994.124 217.479.444 03.03-Fornecimentos 03.03.01-Água E Serviços Externos 26.225.584 26.834.629 16.933.117 03.03.02-Electricidade 72.633.746 78.153.546 55.415.122 03.03.03-Combustíveis E Lubrificantes78.278.998 79.714.498 66.479.580 03.03.04-Conservação E Manutenção 27.371.724 26.170.474 28.579.365 03.03.05-Equipamentos De Desgaste Rápido 16.230.222 15.341.947 8.013.035 03.03.06-Consumo De Secretaria 26.560.656 27.045.856 22.078.805 03.03.07-Rendas E Alugueres 42.226.750 42.726.750 30.693.985 03.03.08-Representação 3.021.000 2.415.100 1.724.272 03.03.09-Comunicações 49.970.720 51.467.748 42.744.427 03.03.10-Seguros 43.052.715 28.516.277 17.523.594 03.03.11-Vigilância E Segurança 24.482.128 21.972.378 15.795.406 03.03.12.01-Ass. Tec. - Residente 17.266.844 14.086.344 10.911.104 03.03.12.02-Ass. Tec. - Não Residente 5.100.000 980.000 455.741 03.03.13-Deslocações E Estadias 52.713.095 51.306.366 39.112.196 03.03.14-Limpeza, Higiéne E Conforto21.583.617 21.719.547 17.796.067 03.03.15-Formação 34.184.086 34.554.041 26.974.689 03.03.90-Outros Fornecimentos 34.772.672 38.375.912 37.247.583 03.03-Fornecimentos E Serviços Externos Total 575.674.557 561.381.413 438.478.088 03.05-Transferências 03.05.01.01-Fundos Correntes E Serviços Autónomos 20.160.000 19.160.000 19.152.000 03.05.01.90-Outras Transferências 23.800.000 23.800.000 23.445.859 03.05.03.01.04-Pensões De Reserva 41.034.770 41.034.770 40.939.319 03.05.04.01-Quotas A Organismos Internacionais 3.425.200 2.004.000 501.927 03.05.04.02-Outras Transferências 1.400.000 2.700.000 2.699.740 03.05-Transferências Correntes Total 89.819.970 88.698.770 86.738.845 03.07-Outras 03.07.02-Impostos Despesas Correntes E Taxas 893.651 893.651 609.719 03.07.90-Outras Despesas Correntes 20.825.608 24.825.608 22.005.154 03.07-Outras Despesas Correntes Total 21.719.259 25.719.259 22.614.873 03-Despesas Correntes Total 4.021.828.540 4.022.131.287 3.539.131.422 04-Despesas 04.01-Imobilizações De Capital04.01.03-Habitações Corpóreas 1.000.000 1.000.000 242.200 04.01.04-Edifícios 3.000.000 3.000.000 2.636.776 04.01.05-Maquinaria E Equipamentos 16.611.290 Basicos 14.685.790 6.678.246 04.01.07-Equipamentos De Carga E Transporte 2.500.000 2.500.000 0 04.01.08-Equipamentos Administrativos1.750.000 3.504.500 3.531.988 04.01-Imobilizações Corpóreas Total 24.861.290 24.690.290 13.089.210 04-Despesas De Capital Total 24.861.290 24.690.290 13.089.210 FUN Total 4.046.689.830 4.046.821.577 3.552.220.632 ADIANTAMENTOS POR REGULARIZAR Total 129.926.263 FUNDOS Total Geral 4.046.689.830 4.046.821.577 3.682.146.895 Liquidado Natureza 18.768.520 1.869.659.108 436.725.810 9.837.851 173.723.223 1.236.736 18.649.893 19.756.332 120.009.550 123.500 3.931.274 1.913.900 8.072.420 73.341.376 12.340.458 267.403 0 0 0 0 5.462.818 2.773.820.172 0 110.585.550 28.495.207 61.924.057 7.846.285 384.499 7.119.999 0 1.123.847 217.479.444 16.933.117 55.415.122 66.479.580 28.579.365 8.013.035 22.078.805 30.693.985 1.724.272 42.744.427 17.523.594 15.795.406 10.911.104 455.741 39.112.196 17.796.067 26.974.689 37.247.583 438.478.088 19.152.000 23.445.859 40.939.319 501.927 2.699.740 86.738.845 609.719 22.005.154 22.614.873 3.539.131.422 242.200 2.636.776 6.678.246 0 3.531.988 13.089.210 13.089.210 3.552.220.632 129.926.263 3.682.146.895 Por pagar Pagamentos Jan. a Dezemb Jan. a Dezemb 0 14.004.909 192.715 24.000 3.585.332 0 772.367 0 344.240 0 0 0 106.968 0 0 0 0 0 0 0 0 19.030.531 0 0 6.400 0 0 0 0 0 0 6.400 83.734 296.645 365.695 145.333 0 282.331 1.470.000 0 234.937 1.953.722 120.750 0 0 426.765 75.147 261.244 130.563 5.846.866 0 0 0 0 0 0 0 0 0 24.883.797 0 0 0 0 0 0 0 24.883.797 18.768.520 1.855.531.423 436.655.871 9.813.851 170.137.891 1.236.736 17.877.526 19.756.332 119.665.310 123.500 3.931.274 1.913.900 7.965.452 73.341.376 12.340.458 267.403 0 0 0 0 5.462.818 2.754.789.641 0 110.585.550 28.488.807 61.924.057 7.846.285 384.499 7.119.999 0 1.123.847 217.473.044 16.849.383 55.118.477 66.113.885 28.434.032 8.013.035 21.796.474 29.223.985 1.724.272 42.509.490 15.569.872 15.674.656 10.911.104 455.741 38.685.431 17.720.920 26.713.445 37.117.020 432.631.222 19.152.000 23.445.859 40.939.319 501.927 2.699.740 86.738.845 609.719 22.005.154 22.614.873 3.514.247.625 242.200 2.636.776 6.539.380 0 3.531.988 12.950.344 12.950.344 3.527.197.969 129.926.263 0 24.883.797 3.657.124.232 Total Geral Executado %_1 18.768.520 0,5% 1.869.536.332 50,8% 436.848.586 11,9% 9.837.851 0,3% 173.723.223 4,7% 1.236.736 0,0% 18.649.893 0,5% 19.756.332 0,5% 120.009.550 3,3% 123.500 0,0% 3.931.274 0,1% 1.913.900 0,1% 8.072.420 0,2% 73.341.376 2,0% 12.340.458 0,3% 267.403 0,0% 0 0,0% 0 0,0% 0 0,0% 0 0,0% 5.462.818 0,1% 2.773.820.172 75,3% 0 0,0% 110.585.550 3,0% 28.495.207 0,8% 61.924.057 1,7% 7.846.285 0,2% 384.499 0,0% 7.119.999 0,2% 0 0,0% 1.123.847 0,0% 217.479.444 5,9% 16.933.117 0,5% 55.415.122 1,5% 66.479.580 1,8% 28.579.365 0,8% 8.013.035 0,2% 22.078.805 0,6% 30.693.985 0,8% 1.724.272 0,0% 42.744.427 1,2% 17.523.594 0,5% 15.795.406 0,4% 10.911.104 0,3% 455.741 0,0% 39.112.196 1,1% 17.796.067 0,5% 26.974.689 0,7% 37.247.583 1,0% 438.478.088 11,9% 19.152.000 0,5% 23.445.859 0,6% 40.939.319 1,1% 501.927 0,0% 2.699.740 0,1% 86.738.845 2,4% 609.719 0,0% 22.005.154 0,6% 22.614.873 0,6% 3.539.131.422 96,1% 242.200 0,0% 2.636.776 0,1% 6.539.380 0,2% 0 0,0% 3.531.988 0,1% 12.950.344 0,4% 12.950.344 0,4% 3.552.081.766 96,5% 129.926.263 3,5% 0 0,0% 3.682.008.029 100,0% Exe % 77,4% 94,3% 100,2% 69,3% 92,1% 108,0% 55,4% 141,3% 92,2% 2,3% 35,2% 85,1% 73,4% 65,1% 71,7% 45,3% 0,0% 0,0% 0,0% 0,0% 36,8% 91,6% 0,0% 55,7% 102,5% 84,5% 167,8% 67,8% 99,5% 0,0% 31,7% 68,6% 63,1% 70,9% 83,4% 109,2% 52,2% 81,6% 71,8% 71,4% 83,1% 61,5% 71,9% 77,5% 46,5% 76,2% 81,9% 78,1% 97,1% 78,1% 100,0% 98,5% 99,8% 25,0% 100,0% 97,8% 68,2% 88,6% 87,9% 88,0% 24,2% 87,9% 44,5% 0,0% 100,8% 52,5% 52,5% 87,8% 0,0% 91,0% MAPA II.1.4 - ADIANTAMENTOS DE FUNDOS POR REGULARIZAR 4º TRIMESTRE 2008 Estrutura nível 3 Ec_Adiantam. Assembleia Nacional Ec_Adiantam. Presidencia Da Republica Ec_Adiantam. Procuradoria Geral Da Republica Ec_Adiantam. Supremo Tribunal De Justica Ec_Adiantam. Tribunal De Contas Ec_Adiantam_Estado Maior Das Forcas Armadas ( Emfa ) Ec_Adiantam_Hospital Agostinho Neto Ec_Adiantam_Hospital Baptista De Sousa Ec_Adiantam_Polia De Ordem Publica ( Pop ) Ec_Adiantam_Policia Judiciaria ( Pj ) Ec_Comissao Nacional Das Eleicoes Ec_Regiao Sanitaria Santiago Norte DES REC 532.674.016 493.519.272 120.833.972 113.830.271 28.375.968 26.951.164 33.969.061 27.381.262 62.637.175 46.860.309 602.899.331 592.167.330 165.734.079 165.733.889 102.788.156 102.648.618 1.361.678.144 1.272.633.874 144.860.076 125.851.973 39.286.251 18.960.375 11.313.409 311.248 3.207.049.638 2.986.849.585 41% EGN 0% GOV 59% FSA Total do Ano Total Anterior Total Geral Por Regularizar 39.154.744 7.003.701 1.424.804 6.587.799 15.776.866 10.732.001 190 139.538 89.044.270 19.008.103 20.325.876 11.002.161 220.200.053 Inst.credito Inst.credito AsN PR PGR STJ TC EMFA HAN HBS POP PJ CNE RSSN 90.273.790 MFP 0 129.926.263 220.200.053 16.446.365 236.646.418 EGN EGN EGN EGN EGN FSA FSA FSA FSA FSA EGN FSA 0 Mapa II.1.5 - Amortização de Empréstimos 4º Trimestre 2008 Class. Class. Econom1 Econom2 20.02 05.02-Operações Passivas Dotações Económica3 Descrição Orçamentais 05.02.02.90-Outros Empréstimos 0 05.02.03.01.02-Dívida Interna de Médio e Longo Prazo 2.000.000.000 05.02.03.02.02-Dívida Externa de Médio e Longo Prazo 2.044.636.431 05.02-Operações Passivas Total 4.044.636.431 Total Geral Total Geral 4.044.636.431 Orçamento Corrigido 50.000.000 2.317.280.000 1.950.636.431 4.317.916.431 4.317.916.431 Cabimentado Liquidado Pagamentos Jan. a Dezemb 50.000.000 2.305.430.000 1.885.934.970 4.241.364.970 4.241.364.970 50.000.000 2.305.430.000 1.885.934.970 4.241.364.970 4.241.364.970 50.000.000 2.305.430.000 1.885.934.970 4.241.364.970 4.241.364.970 CONTAS PROVISÓRIAS 4º TRIMESTRE 2008 Mapa IV - Receitas Globais dos Serviços e Fundos autónomos segundo classificação económica e orgânica O_NAT_NATUREZA RO_DET_Classf.Economica 2 INV INV Total OPT OPT Total Total Geral Instituto De Estradas 01.01.01.01.01-Pessoas Singulares 01.02.01.01-Juros De Mora 01.02.01.90-Outras Multas E Penalidades 01.02.02.01.07-Serviços De Exploração De Água 01.02.02.01.90-Taxas De Serviços Diversos 01.02.02.02.06-Emolumentos De Secretaria 01.02.02.02.90-Outros Emolumentos 01.02.02.03.90-Serviços Diversos 01.02.02.04.03-Serviços Médico-Hospitalares 01.02.02.04.06-Serviços De Água 01.02.02.04.90-Serviços Diversos 01.02.03.05-Rendas De Habitações Do Estado 01.02.03.07-Rendas Diversas 01.02.03.08-Alugueres De Equipamentos 01.02.03.09-Alugueres Diversos 01.02.06.01.03-Administração Central 01.02.06.01.90-Outras Transferências 01.02.06.02.90-Outras Transferências 01.02.07.01-Mercadorias 01.02.07.02-Produtos Acabados E Semi-Acabados 01.02.07.03-Publicações E Impressos 01.02.07.90-Outros 01.02.08.90-Outras Receitas Correntes 01.02.08.99-Outras Receitas Extraordinárias 02.02.04-Maquinaria E Equipamentos 02.02.90-Outras Imobilizações 02.04.01.90-Outras Transferências 02.04.90-Outras Transferências 09.01.03.01-Recebidas Pelos Fsa 09.01.89-Reposição Abatida Laboratório De Engenharia Civil Instituto Maritimo Portuario Instituto Nacional De Desenvolvim ento Das Pescas 0 Hospital Central Agostinho Neto Hospital Centro Central Nacional De Baptista De Desenvolvim Sousa ento Sanitário Regiao Sanitária Santiago Norte Estado Maior Instituto Das Forças Instituto Das Nacional De Armadas Comunidades Estatística Instituto Comissão De Nacional De Coordenação Administraçã E Combate À o E Gestão Droga 1.127.500 97.187.749 95.533.525 4.504.500 0 0 3.695.991 0 0 4.905.000 0 0 0 0 20.257.319 4.504.500 9.245.304 0 91.063.272 2.900.000 0 7.805.000 16.799.396 20.257.319 20.257.319 9.245.304 13.749.804 91.063.272 91.063.272 16.799.396 24.604.396 97.187.749 165.734.079 95.533.525 102.788.156 0 8.999.956 0 0 0 602.899.331 0 46.377.421 165.734.079 262.921.828 102.788.156 198.321.681 8.999.956 8.999.956 0 0 602.899.331 602.899.331 46.377.421 46.377.421 1.127.500 101.954.919 73.322 102.028.241 103.155.741 3.695.991 6.586.616 0 13.440.538 6.586.616 10.282.607 13.440.538 13.440.538 CONTAS PROVISÓRIAS 4º TRIMESTRE 2008 Mapa IV - Receitas Globais dos Serviços e Fundos autónomos segundo classificação económica e orgânica O_NAT_NATUREZA RO_DET_Classf.Economica 2 INV INV Total OPT OPT Total Total Geral Instituto Nacional De Investigação E Des. Agrário 01.01.01.01.01-Pessoas Singulares 01.02.01.01-Juros De Mora 01.02.01.90-Outras Multas E Penalidades 01.02.02.01.07-Serviços De Exploração De Água 01.02.02.01.90-Taxas De Serviços Diversos 01.02.02.02.06-Emolumentos De Secretaria 01.02.02.02.90-Outros Emolumentos 01.02.02.03.90-Serviços Diversos 01.02.02.04.03-Serviços Médico-Hospitalares 01.02.02.04.06-Serviços De Água 01.02.02.04.90-Serviços Diversos 4.553.232 01.02.03.05-Rendas De Habitações Do Estado 01.02.03.07-Rendas Diversas 264.000 01.02.03.08-Alugueres De Equipamentos 0 01.02.03.09-Alugueres Diversos 01.02.06.01.03-Administração Central 01.02.06.01.90-Outras Transferências 01.02.06.02.90-Outras Transferências 01.02.07.01-Mercadorias 01.02.07.02-Produtos Acabados E Semi-Acabados 01.02.07.03-Publicações E Impressos 01.02.07.90-Outros 0 01.02.08.90-Outras Receitas Correntes 01.02.08.99-Outras Receitas Extraordinárias 0 02.02.04-Maquinaria E Equipamentos 02.02.90-Outras Imobilizações 02.04.01.90-Outras Transferências 02.04.90-Outras Transferências 4.817.232 09.01.03.01-Recebidas Pelos Fsa 22.746.029 09.01.89-Reposição Abatida 22.746.029 27.563.261 Instituto Nacional De Gestão De Recursos Hídricos 0 0 39.715.479 77.000 Instituto Instituto Instituto Caboverdiano Superior De Nacional De De Acção Engenharia E Instituto Meteorologia Social Ciências Do Superior De E Geofísica Escolar Mar Educação Instituto Pedagógico Instituto Agência Caboverdiano Caboverdiana Universidade Da Criança e De De Cabo do Investimento Verde Adolescente s Arquivo Histórico Nacional Instituto De Instituto Da Investigação Biblioteca E Património Nacional E Do Cultural Livro 115.699.991 25.270.800 100.652.603 14.157.337 0 0 2.713.585 199.720 0 0 1.434.978 0 345.400 116.445 50.218 0 1.188.253 44.307.425 7.000.000 117.233.644 14.610.949 7.000.000 51.307.425 14.610.949 131.844.593 1.729.200 542.900 0 0 41.306.592 27.000.000 66.796.394 101.195.503 57.301.192 14.157.337 68.513.619 0 52.877.129 0 28.597.971 0 72.750.771 0 28.555.881 0 36.261.171 0 22.087.839 41.306.592 41.306.592 66.796.394 93.796.394 57.301.192 158.496.695 68.513.619 82.670.956 52.877.129 52.877.129 28.597.971 28.597.971 72.750.771 72.750.771 28.555.881 28.555.881 36.261.171 36.261.171 22.087.839 22.087.839 CONTAS PROVISÓRIAS 4º TRIMESTRE 2008 Mapa IV - Receitas Globais dos Serviços e Fundos autónomos segundo classificação económica e orgânica O_NAT_NATUREZA RO_DET_Classf.Economica 2 INV INV Total OPT OPT Total Total Geral Instituto Caboverdiano para Instituto Do Igualdede e Emprego E Equidade do Da Formação Género Profissional Centro De Juventude 01.01.01.01.01-Pessoas Singulares 01.02.01.01-Juros De Mora 01.02.01.90-Outras Multas E Penalidades 01.02.02.01.07-Serviços De Exploração De Água 01.02.02.01.90-Taxas De Serviços Diversos 01.02.02.02.06-Emolumentos De Secretaria 01.02.02.02.90-Outros Emolumentos 01.02.02.03.90-Serviços Diversos 01.02.02.04.03-Serviços Médico-Hospitalares 01.02.02.04.06-Serviços De Água 01.02.02.04.90-Serviços Diversos 01.02.03.05-Rendas De Habitações Do Estado 01.02.03.07-Rendas Diversas 01.02.03.08-Alugueres De Equipamentos 01.02.03.09-Alugueres Diversos 01.02.06.01.03-Administração Central 01.02.06.01.90-Outras Transferências 01.02.06.02.90-Outras Transferências 01.02.07.01-Mercadorias 01.02.07.02-Produtos Acabados E Semi-Acabados 01.02.07.03-Publicações E Impressos 01.02.07.90-Outros 01.02.08.90-Outras Receitas Correntes 01.02.08.99-Outras Receitas Extraordinárias 02.02.04-Maquinaria E Equipamentos 02.02.90-Outras Imobilizações 02.04.01.90-Outras Transferências 02.04.90-Outras Transferências 09.01.03.01-Recebidas Pelos Fsa 09.01.89-Reposição Abatida 0 8.110.272 0 49.209.169 0 26.808.765 8.110.272 8.110.272 49.209.169 49.209.169 26.808.765 26.808.765 Total Geral 0 0 0 0 0 140.080.740 0 1.127.500 0 0 9.057.732 0 264.000 0 3.695.991 0 0 0 0 4.905.000 0 0 2.272.100 0 0 0 2.900.000 0 164.303.063 897.865.114 73.322 897.938.436 1.062.241.499 CONTAS PROVISÓRIAS 4º TRIMESTRE 2008 Mapa V - Despesas Globais dos Serviços e Fundos autónomos segundo classificação económica e orgânica Laboratório De Instituto Instituto De Engenharia Maritimo RO_N1_Classf.Econ RO_N2_Classf.Economi omica 0 ca 1 Estradas Civil Portuario RO_DET_Classf.Economica 2 03-Despesas Correntes 03.01-Despesa Com 03.01.01.01-Pessoal Pessoal Do Quadro Especial 3.763.668 03.01.01.02-Pessoal Do Quadro 8.854.426 11.881.824 41.169.020 03.01.01.03-Pessoal Contratado 3.422.316 03.01.01.04-Gratificações Permanentes 94.930 1.677.042 03.01.01.05-Subsídios Permanentes 472.826 0 03.01.01.06-Despesas De Representação 03.01.02.01-Gratificações Eventuais 344.344 03.01.02.02-Horas Extraordinárias 134.640 0 03.01.02.03-Alimentação E Alojamento 03.01.02.04-Subsídio De Instalação 0 03.01.02.90-Remunerações Diversas 3.077.210 03.01.03.01-Encargos Com A Saúde 03.01.03.02-Abono De Família 164.580 03.01.03.03-Contribuições Para A Segurança 1.379.256 Social 1.633.789 1.520.806 03.01.03.04-Seguros Acidentes Trabalho 17.280 79.380 335.449 03.01.03.90-Encargos Diversos 03.01.04.02-Recrutamentos E Nomeações 03.01.04.04-Reclassificações 03.01.04.05-Reingressos 03.01.04.90-Outras Dotações 03.01.90-Outras Despesas Com Pessoal 0 1.503.000 03.01-Despesa Com Pessoal Total 10.818.718 13.729.633 56.977.435 03.02-Aquisição De Bens 03.02.02-Matérias E Serviços Primas 03.02.03.01-Medicamentos 03.02.03.02-Produtos Alimentares Para Não Funcionários 03.02.03.03-Roupa E Calçado 03.02.03.04-Pequenos Equipamentos 03.02.03.90-Produtos Diversos 03.02.04-Outros Aprovisionamentos 03.02.05.02-Munições E Explosivos 03.02.05.90-Material Diverso 03.02-Aquisição De Bens E Serviços Total 0 0 0 03.03-Fornecimentos03.03.01-Água E Serviços Externos 47.082 0 475.465 03.03.02-Electricidade 286.959 0 593.564 03.03.03-Combustíveis E Lubrificantes 270.000 0 1.286.172 03.03.04-Conservação E Manutenção 161.945 0 717.876 03.03.05-Equipamentos De Desgaste Rápido 0 265.666 03.03.06-Consumo De Secretaria 169.120 0 974.074 03.03.07-Rendas E Alugueres 1.025.035 03.03.08-Representação 113.121 0 03.03.09-Comunicações 463.243 0 1.517.363 03.03.10-Seguros 49.232 0 200.950 03.03.11-Vigilância E Segurança 953.448 0 03.03.12.01-Ass. Tec. - Residente 1.516.330 0 03.03.12.02-Ass. Tec. - Não Residente 03.03.13-Deslocações E Estadias 362.639 0 822.163 03.03.14-Limpeza, Higiéne E Conforto 362.244 0 1.072.226 03.03.15-Formação 0 03.03.90-Outros Fornecimentos 106.107 735.728 03.03-Fornecimentos E Serviços Externos Total 4.861.470 0 9.686.282 03.05-Transferências03.05.01.01-Fundos Correntes E Serviços Autónomos 03.05.01.90-Outras Transferências 03.05.03.01.04-Pensões De Reserva 03.05.04.01-Quotas A Organismos Internacionais 03.05.04.02-Outras Transferências 03.05-Transferências Correntes Total 0 0 0 03.07-Outras Despesas 03.07.02-Impostos Correntes E Taxas 03.07.90-Outras Despesas Correntes 03.07-Outras Despesas Correntes Total 0 0 0 03-Despesas Correntes Total 15.680.188 13.729.633 66.663.717 04-Despesas De Capital 04.01-Imobilizações Corpóreas 04.01.03-Habitações 04.01.04-Edifícios 04.01.05-Maquinaria E Equipamentos Basicos 21.850 04.01.06-Ferramentas E Utensílios 04.01.07-Equipamentos De Carga E Transporte 04.01.08-Equipamentos Administrativos 152.111 04.01-Imobilizações Corpóreas Total 173.961 0 0 04-Despesas De Capital Total 173.961 0 0 FUN Total 15.854.149 13.729.633 66.663.717 ADIANTAMENTOS POR REGULARIZAR Total Total Geral 15.854.149 13.729.633 66.663.717 Instituto Nacional De Desenvolvi mento Das Pescas 19.785.195 1.244.907 191.525 Hospital Central Agostinho Neto Hospital Central Baptista De Sousa 307.201 9.844.329 49.687.476 49.488.477 3.251.172 610.274 907.386 0 2.554.742 10.654.273 4.087.139 Centro Nacional De Desenvolvi mento Sanitário 3.948.054 474.692 0 0 0 462.800 2.921.152 113.040 65.600 4.979.268 9.594 0 24.255.819 50.150.276 506.950 87.256.811 4.432.340 70.796.063 18.306.155 179.700 39.789.487 9.415.977 1.918.450 5.897.693 193.751 0 0 0 0 0 0 0 0 0 0 0 0 0 89.281.918 0 6.336.944 4.991.440 2.933.724 0 92.934 329.887 198.000 174.709 39.799 167.739 1.795.772 21.344 721.110 254.687 57.215.358 4.474.549 12.854.866 4.197.423 13.521.454 591.460 4.165.746 571.505 229.964 3.840.758 88.048 1.158.256 488.500 0 0 248.342 3.444.225 2.561.695 2.327.831 25.000 19.788 0 0 23.073.240 5.527.319 56.599.374 666.121 2.847.565 2.325.652 253.331 1.865 878.392 0 0 0 0 0 409.305 0 0 409.305 24.255.819 162.505.434 201.480.848 0 7.279.905 3.228.465 0 3.082.999 0 3.228.465 3.082.999 0 3.228.465 3.082.999 24.255.819 165.733.899 204.563.847 190 139.538 24.255.819 165.734.089 204.703.385 0 0 7.279.905 7.279.905 CONTAS PROVISÓRIAS 4º TRIMESTRE 2008 Mapa V - Despesas Globais dos Serviços e Fundos autónomos segundo classificação económica e orgânica Regiao Estado Sanitária Maior Das Instituto Das Santiago Forças Comunidad RO_N1_Classf.Econ RO_N2_Classf.Economi omica 0 ca 1 Norte Armadas es RO_DET_Classf.Economica 2 03-Despesas Correntes 03.01-Despesa Com 03.01.01.01-Pessoal Pessoal Do Quadro Especial 2.989.240 03.01.01.02-Pessoal Do Quadro 0 353.054.440 5.229.398 03.01.01.03-Pessoal Contratado 0 275.238 7.937.893 03.01.01.04-Gratificações Permanentes 0 286.159 03.01.01.05-Subsídios Permanentes 0 592.080 03.01.01.06-Despesas De Representação 239.350 03.01.02.01-Gratificações Eventuais 66.000 133.170 03.01.02.02-Horas Extraordinárias 0 65.871 03.01.02.03-Alimentação E Alojamento 102.510.155 03.01.02.04-Subsídio De Instalação 54.000 03.01.02.90-Remunerações Diversas 0 75.049 03.01.03.01-Encargos Com A Saúde 1.913.900 03.01.03.02-Abono De Família 1.223.846 03.01.03.03-Contribuições Para A Segurança Social 4.398.699 825.699 03.01.03.04-Seguros Acidentes Trabalho 03.01.03.90-Encargos Diversos 267.403 03.01.04.02-Recrutamentos E Nomeações 0 03.01.04.04-Reclassificações 03.01.04.05-Reingressos 0 03.01.04.90-Outras Dotações 03.01.90-Outras Despesas Com Pessoal 0 452.872 03.01-Despesa Com Pessoal Total 0 467.870.510 14.719.952 03.02-Aquisição De Bens 03.02.02-Matérias E Serviços Primas 03.02.03.01-Medicamentos 03.02.03.02-Produtos Alimentares Para Não Funcionários 03.02.03.03-Roupa E Calçado 156.003 11.215.110 03.02.03.04-Pequenos Equipamentos 0 1.609.085 153.102 03.02.03.90-Produtos Diversos 144.758 03.02.04-Outros Aprovisionamentos 223.900 03.02.05.02-Munições E Explosivos 03.02.05.90-Material Diverso 0 03.02-Aquisição De Bens E Serviços Total 156.003 12.824.195 521.760 03.03-Fornecimentos03.03.01-Água E Serviços Externos 0 3.402.069 114.520 03.03.02-Electricidade 0 6.902.284 0 03.03.03-Combustíveis E Lubrificantes 0 9.038.035 660.000 03.03.04-Conservação E Manutenção 1.999.590 239.924 03.03.05-Equipamentos De Desgaste Rápido 0 1.714.502 130.139 03.03.06-Consumo De Secretaria 0 2.221.320 209.917 03.03.07-Rendas E Alugueres 03.03.08-Representação 208.846 03.03.09-Comunicações 0 2.253.549 651.298 03.03.10-Seguros 0 10.982.511 52.179 03.03.11-Vigilância E Segurança 03.03.12.01-Ass. Tec. - Residente 5.264.580 03.03.12.02-Ass. Tec. - Não Residente 03.03.13-Deslocações E Estadias 0 6.199.626 2.954.674 03.03.14-Limpeza, Higiéne E Conforto 0 1.231.205 135.986 03.03.15-Formação 4.211.898 03.03.90-Outros Fornecimentos 113.180 1.816.043 1.476.727 03.03-Fornecimentos E Serviços Externos Total 113.180 57.446.058 6.625.364 03.05-Transferências03.05.01.01-Fundos Correntes E Serviços Autónomos 03.05.01.90-Outras Transferências 20.000.000 03.05.03.01.04-Pensões De Reserva 40.939.319 03.05.04.01-Quotas A Organismos Internacionais 461.680 03.05.04.02-Outras Transferências 03.05-Transferências Correntes Total 0 41.400.999 20.000.000 03.07-Outras Despesas 03.07.02-Impostos Correntes E Taxas 159.992 03.07.90-Outras Despesas Correntes 12.465.576 03.07-Outras Despesas Correntes Total 0 12.625.568 0 03-Despesas Correntes Total 269.183 592.167.330 41.867.076 04-Despesas De Capital 04.01-Imobilizações Corpóreas 04.01.03-Habitações 04.01.04-Edifícios 04.01.05-Maquinaria E Equipamentos Basicos 42.065 04.01.06-Ferramentas E Utensílios 04.01.07-Equipamentos De Carga E Transporte 0 04.01.08-Equipamentos Administrativos 04.01-Imobilizações Corpóreas Total 42.065 0 0 04-Despesas De Capital Total 42.065 0 0 FUN Total 311.248 592.167.330 41.867.076 ADIANTAMENTOS POR REGULARIZAR Total 11.002.161 10.732.001 11.313.409 602.899.331 41.867.076 Total Geral Instituto Instituto Nacional De Polícia Nacional De Administraç Polícia Nacional Estatística ão E Gestão Judiciária 10.208.413 878.190.598 50.739.583 4.240.785 79.181.585 26.954.702 5.830.099 0 0 264.000 140.413.155 4.613.759 12.110.652 4.776.384 105.999 0 10.049.003 61.500 15.800 5.368.432 245.659 8.715.282 8.645.283 60.361 2.120 8.000 464.001 10.025.648 152.100 13.600 293.970 291.000 3.513.094 2.147.800 0 0 0 0 1.074.790.515 2.999.996 84.675.597 5.012.356 106.223.895 0 166.677 48.258.720 6.896.099 0 1.123.847 56.445.343 1.933.473 10.278.526 32.435.912 552.498 4.007.726 2.969.696 2.019.229 61.940 8.844.431 1.704.319 0 122.750 45.990 0 0 488.466 2.063.179 656.000 465.751 179.455 702.399 5.837.300 168.740 449.085 1.477.500 116.939 190.809 161.547 359.155 176.732 1.272.717 322.623 1.173.000 461.414 177.200 0 0 0 0 375.270 815.320 2.483.209 275.743 3.225 336.627 1.822.200 14.480 1.103.044 490.434 362.250 0 8.458.579 1.237.690 21.463.897 8.594.618 104.562.534 0 455.741 1.936.179 1.138.053 898.084 17.588.947 394.400 89.114 0 868.329 4.922.224 3.108.788 324.000 724.750 2.109.317 14.348.657 0 0 0 9.130.273 9.130.273 0 1.244.928.665 102.264.544 242.200 2.636.776 3.247.000 6.125.976 0 6.125.976 0 1.251.054.641 102.264.544 89.044.270 1.340.098.911 102.264.544 0 0 10.103.320 120.572.552 0 0 0 0 10.103.320 120.572.552 19.008.103 10.103.320 139.580.655 CONTAS PROVISÓRIAS 4º TRIMESTRE 2008 Mapa V - Despesas Globais dos Serviços e Fundos autónomos segundo classificação económica e orgânica Comissão De Instituto Coordenaçã Nacional De oE Investigação Combate À E Des. RO_N1_Classf.Econ RO_N2_Classf.Economi omica 0 ca 1 Droga Agrário RO_DET_Classf.Economica 2 03-Despesas Correntes 03.01-Despesa Com 03.01.01.01-Pessoal Pessoal Do Quadro Especial 03.01.01.02-Pessoal Do Quadro 5.437.104 26.959.130 03.01.01.03-Pessoal Contratado 571.464 03.01.01.04-Gratificações Permanentes 03.01.01.05-Subsídios Permanentes 0 03.01.01.06-Despesas De Representação 03.01.02.01-Gratificações Eventuais 0 03.01.02.02-Horas Extraordinárias 39.639 0 03.01.02.03-Alimentação E Alojamento 03.01.02.04-Subsídio De Instalação 03.01.02.90-Remunerações Diversas 03.01.03.01-Encargos Com A Saúde 03.01.03.02-Abono De Família 31.399 0 03.01.03.03-Contribuições Para A Segurança Social 0 03.01.03.04-Seguros Acidentes Trabalho 0 03.01.03.90-Encargos Diversos 03.01.04.02-Recrutamentos E Nomeações 03.01.04.04-Reclassificações 03.01.04.05-Reingressos 03.01.04.90-Outras Dotações 03.01.90-Outras Despesas Com Pessoal 03.01-Despesa Com Pessoal Total 5.508.142 27.530.594 03.02-Aquisição De Bens 03.02.02-Matérias E Serviços Primas 03.02.03.01-Medicamentos 03.02.03.02-Produtos Alimentares Para Não599.998 Funcionários 03.02.03.03-Roupa E Calçado 179.474 0 03.02.03.04-Pequenos Equipamentos 0 03.02.03.90-Produtos Diversos 0 03.02.04-Outros Aprovisionamentos 0 03.02.05.02-Munições E Explosivos 03.02.05.90-Material Diverso 03.02-Aquisição De Bens E Serviços Total 779.472 0 03.03-Fornecimentos03.03.01-Água E Serviços Externos 0 03.03.02-Electricidade 103.200 0 03.03.03-Combustíveis E Lubrificantes 386.622 0 03.03.04-Conservação E Manutenção 134.528 0 03.03.05-Equipamentos De Desgaste Rápido34.601 0 03.03.06-Consumo De Secretaria 224.621 0 03.03.07-Rendas E Alugueres 03.03.08-Representação 0 03.03.09-Comunicações 0 0 03.03.10-Seguros 0 0 03.03.11-Vigilância E Segurança 03.03.12.01-Ass. Tec. - Residente 110.000 0 03.03.12.02-Ass. Tec. - Não Residente 03.03.13-Deslocações E Estadias 116.784 0 03.03.14-Limpeza, Higiéne E Conforto 105.869 0 03.03.15-Formação 0 03.03.90-Outros Fornecimentos 1.287.928 0 03.03-Fornecimentos E Serviços Externos Total 2.504.153 0 03.05-Transferências03.05.01.01-Fundos Correntes E Serviços Autónomos 03.05.01.90-Outras Transferências 03.05.03.01.04-Pensões De Reserva 03.05.04.01-Quotas A Organismos Internacionais 0 03.05.04.02-Outras Transferências 2.699.740 03.05-Transferências Correntes Total 2.699.740 0 03.07-Outras Despesas 03.07.02-Impostos Correntes E Taxas 0 03.07.90-Outras Despesas Correntes 0 03.07-Outras Despesas Correntes Total 0 0 03-Despesas Correntes Total 11.491.507 27.530.594 04-Despesas De Capital 04.01-Imobilizações Corpóreas 04.01.03-Habitações 04.01.04-Edifícios 04.01.05-Maquinaria E Equipamentos Basicos 04.01.06-Ferramentas E Utensílios 04.01.07-Equipamentos De Carga E Transporte 04.01.08-Equipamentos Administrativos 04.01-Imobilizações Corpóreas Total 0 0 04-Despesas De Capital Total 0 0 FUN Total 11.491.507 27.530.594 ADIANTAMENTOS POR REGULARIZAR Total 11.491.507 27.530.594 Total Geral Instituto Nacional De Gestão De Recursos Hídricos Instituto Nacional De Meteorologi aE Geofísica Instituto Caboverdian o De Acção Social Escolar Instituto Superior De Engenharia Instituto E Ciências Superior De Do Mar Educação 54.902.179 4.856.767 201.000 1.055.340 68.018.764 14.920.902 0 8.113.873 0 4.855.234 1.939.892 393.890 353.493 926.200 2.419.529 40.000 0 0 66.526 37.712.626 30.062.903 38.744.071 105.309.032 73.667 3.097.299 52.512 0 0 6.697 1.636.339 674.692 1.431.971 618.722 0 12.070.011 267.840 9.199 3.329.303 286.200 0 0 14.500 0 0 0 14.500 223.694 2.148.745 3.344.743 1.811.489 0 672.246 229.196 1.224.052 1.103.536 364.524 729.642 557.594 562.643 5.558.047 76.525 12.000 0 1.102.048 186.828 1.267.714 600.000 720.864 130.857 133.000 526.200 12.485.775 299.214 101.200 4.625.088 10.403 2.668.135 0 0 0 0 62.581.179 105.850.919 289.593 0 10.594.044 2.100 21.505 0 189.660 507.268 24.000 539.100 23.605 578.728 1.392.350 421.830 683.051 45.600 1.010.519 330.080 0 540.233 1.872.080 199.350 240.681 820.170 45.858 0 30.433 1.590.688 23.759 1.887.840 78.000 106.498 50.000 124.900 247.451 9.624.622 19.152.000 507.850 1.583.812 359.200 1.531.800 7.450.281 401.873 9.844.746 19.152.000 0 0 331.255 6.196.310 114.849 1.071.516 121.815 0 2.476.496 285.183 55.000 3.521.215 17.427.899 0 84.384.171 142.740.400 0 809.242 310.000 0 0 0 1.420 448.307 0 0 1.420 448.307 75.082.874 123.727.125 0 39.370.666 0 0 91.858.057 152.585.146 138.866 0 138.866 0 75.221.740 123.727.125 0 0 39.370.666 0 0 0 0 91.858.057 152.585.146 75.221.740 123.727.125 39.370.666 91.858.057 152.585.146 138.866 CONTAS PROVISÓRIAS 4º TRIMESTRE 2008 Mapa V - Despesas Globais dos Serviços e Fundos autónomos segundo classificação económica e orgânica Instituto Caboverdian Universidad o Da Instituto e De Cabo Criança e do RO_N1_Classf.Econ RO_N2_Classf.Economi omica 0 ca 1 Pedagógico Verde Adolescente RO_DET_Classf.Economica 2 03-Despesas Correntes 03.01-Despesa Com 03.01.01.01-Pessoal Pessoal Do Quadro Especial 03.01.01.02-Pessoal Do Quadro 64.908.036 22.114.455 5.289.434 03.01.01.03-Pessoal Contratado 2.508.612 11.765.781 9.372.095 03.01.01.04-Gratificações Permanentes 03.01.01.05-Subsídios Permanentes 1.549.921 03.01.01.06-Despesas De Representação 03.01.02.01-Gratificações Eventuais 03.01.02.02-Horas Extraordinárias 2.668.258 118.541 84.000 03.01.02.03-Alimentação E Alojamento 0 03.01.02.04-Subsídio De Instalação 03.01.02.90-Remunerações Diversas 03.01.03.01-Encargos Com A Saúde 03.01.03.02-Abono De Família 105.600 03.01.03.03-Contribuições Para A Segurança 131.840 Social 2.440.578 2.071.304 03.01.03.04-Seguros Acidentes Trabalho 03.01.03.90-Encargos Diversos 03.01.04.02-Recrutamentos E Nomeações 0 03.01.04.04-Reclassificações 0 03.01.04.05-Reingressos 0 03.01.04.90-Outras Dotações 03.01.90-Outras Despesas Com Pessoal 0 03.01-Despesa Com Pessoal Total 71.872.267 36.439.355 16.816.833 03.02-Aquisição De Bens 03.02.02-Matérias E Serviços Primas 03.02.03.01-Medicamentos 03.02.03.02-Produtos Alimentares Para Não Funcionários 03.02.03.03-Roupa E Calçado 03.02.03.04-Pequenos Equipamentos 42.150 03.02.03.90-Produtos Diversos 03.02.04-Outros Aprovisionamentos 03.02.05.02-Munições E Explosivos 03.02.05.90-Material Diverso 03.02-Aquisição De Bens E Serviços Total 0 42.150 0 03.03-Fornecimentos03.03.01-Água E Serviços Externos 1.119.253 55.316 80.298 03.03.02-Electricidade 1.625.222 894.198 458.855 03.03.03-Combustíveis E Lubrificantes 161.600 775.950 347.208 03.03.04-Conservação E Manutenção 309.550 179.246 90.000 03.03.05-Equipamentos De Desgaste Rápido 121.590 177.605 03.03.06-Consumo De Secretaria 453.318 354.510 223.558 03.03.07-Rendas E Alugueres 495.000 2.727.000 03.03.08-Representação 337.859 03.03.09-Comunicações 1.128.450 1.551.226 699.375 03.03.10-Seguros 303.670 63.700 113.122 03.03.11-Vigilância E Segurança 860.178 966.000 03.03.12.01-Ass. Tec. - Residente 03.03.12.02-Ass. Tec. - Não Residente 0 03.03.13-Deslocações E Estadias 785.145 2.868.134 109.291 03.03.14-Limpeza, Higiéne E Conforto 613.200 642.985 140.000 03.03.15-Formação 0 03.03.90-Outros Fornecimentos 374.219 3.936.393 03.03-Fornecimentos E Serviços Externos Total 7.855.395 13.120.517 5.166.312 03.05-Transferências03.05.01.01-Fundos Correntes E Serviços Autónomos 03.05.01.90-Outras Transferências 3.445.859 03.05.03.01.04-Pensões De Reserva 03.05.04.01-Quotas A Organismos Internacionais 03.05.04.02-Outras Transferências 03.05-Transferências Correntes Total 0 0 3.445.859 03.07-Outras Despesas 03.07.02-Impostos Correntes E Taxas 03.07.90-Outras Despesas Correntes 03.07-Outras Despesas Correntes Total 0 0 0 03-Despesas Correntes Total 79.727.662 49.602.022 25.429.004 04-Despesas De Capital 04.01-Imobilizações Corpóreas 04.01.03-Habitações 04.01.04-Edifícios 04.01.05-Maquinaria E Equipamentos Basicos 04.01.06-Ferramentas E Utensílios 04.01.07-Equipamentos De Carga E Transporte 04.01.08-Equipamentos Administrativos 296.878 04.01-Imobilizações Corpóreas Total 296.878 0 0 04-Despesas De Capital Total 296.878 0 0 FUN Total 80.024.540 49.602.022 25.429.004 ADIANTAMENTOS POR REGULARIZAR Total 80.024.540 49.602.022 25.429.004 Total Geral Agência Caboverdian a De Arquivo Investiment Histórico os Nacional 1.499.998 1.977.682 18.994.432 47.202.721 2.187.161 Instituto De Investigação E Património Cultural 25.253.508 1.510.225 Instituto Da Biblioteca Nacional E Do Livro 13.816.636 478.403 224.393 89.499 176.113 0 4.654.340 93.789 3.158.513 112.858 0 69.599 118.035 38.600 0 0 56.131.326 0 24.542.463 27.127.480 0 13.855.236 0 0 320.000 840.000 639.000 1.185.989 0 891.000 5.800.000 73.670 2.140.056 0 1.391.040 1.149.154 0 253.382 943.221 243.750 291.821 0 179.072 0 0 231.823 7.720 828.000 81.833 0 285.740 376.135 556.900 307.337 175.596 450.879 0 477.958 1.009.563 270.000 124.200 6.900 976.409 89.659 1.200.570 10.120 0 486.609 269.860 2.600.000 449.075 807.160 74.514 187.668 109.251 575.697 582.267 830.200 199.983 1.044.666 16.356.249 116.784 3.474.325 557.065 6.151.274 1.350.000 8.220.197 40.247 152.749 0 0 40.247 0 0 0 72.487.575 0 28.057.035 0 33.278.754 0 22.075.433 0 0 72.487.575 0 0 28.057.035 0 0 33.278.754 0 0 22.075.433 72.487.575 28.057.035 33.278.754 22.075.433 CONTAS PROVISÓRIAS 4º TRIMESTRE 2008 Mapa V - Despesas Globais dos Serviços e Fundos autónomos segundo classificação económica e orgânica Instituto Caboverdian Instituto Do o para Emprego E Igualdede e Da Equidade do Formação Centro De RO_N1_Classf.Econ RO_N2_Classf.Economi omica 0 ca 1 Género Profissional Juventude Total Geral RO_DET_Classf.Economica 2 03-Despesas Correntes 03.01-Despesa Com 03.01.01.01-Pessoal Pessoal Do Quadro Especial 18.768.520 03.01.01.02-Pessoal Do Quadro 9.110.063 0 1.855.531.423 03.01.01.03-Pessoal Contratado 4.734.163 28.405.534 19.031.250 436.655.871 03.01.01.04-Gratificações Permanentes 9.813.851 03.01.01.05-Subsídios Permanentes 75.096 170.137.891 03.01.01.06-Despesas De Representação 90.000 1.236.736 03.01.02.01-Gratificações Eventuais 17.877.526 03.01.02.02-Horas Extraordinárias 98.640 19.756.332 03.01.02.03-Alimentação E Alojamento 119.665.310 03.01.02.04-Subsídio De Instalação 123.500 03.01.02.90-Remunerações Diversas 3.931.274 03.01.03.01-Encargos Com A Saúde 1.913.900 03.01.03.02-Abono De Família 7.965.452 03.01.03.03-Contribuições Para A Segurança 736.184 Social 5.596.351 4.654 73.341.376 03.01.03.04-Seguros Acidentes Trabalho 19.440 12.340.458 03.01.03.90-Encargos Diversos 267.403 03.01.04.02-Recrutamentos E Nomeações 0 03.01.04.04-Reclassificações 0 03.01.04.05-Reingressos 0 03.01.04.90-Outras Dotações 0 03.01.90-Outras Despesas Com Pessoal 5.462.818 03.01-Despesa Com Pessoal Total 5.663.523 43.201.948 19.035.904 2.754.789.641 03.02-Aquisição De Bens 03.02.02-Matérias E Serviços Primas 0 03.02.03.01-Medicamentos 110.585.550 03.02.03.02-Produtos Alimentares Para Não Funcionários 28.488.807 03.02.03.03-Roupa E Calçado 61.924.057 03.02.03.04-Pequenos Equipamentos 7.846.285 03.02.03.90-Produtos Diversos 384.499 03.02.04-Outros Aprovisionamentos 7.119.999 03.02.05.02-Munições E Explosivos 0 03.02.05.90-Material Diverso 1.123.847 03.02-Aquisição De Bens E Serviços Total 0 0 0 217.473.044 03.03-Fornecimentos03.03.01-Água E Serviços Externos 62.902 65.755 71.305 16.849.383 03.03.02-Electricidade 327.396 0 452.019 55.118.477 03.03.03-Combustíveis E Lubrificantes 375.750 810.000 66.113.885 03.03.04-Conservação E Manutenção 29.726 132.690 37.065 28.434.032 03.03.05-Equipamentos De Desgaste Rápido 0 8.013.035 03.03.06-Consumo De Secretaria 269.998 399.659 425.414 21.796.474 03.03.07-Rendas E Alugueres 1.356.000 29.223.985 03.03.08-Representação 1.724.272 03.03.09-Comunicações 578.187 730.194 1.387.772 42.509.490 03.03.10-Seguros 14.954 161.697 15.569.872 03.03.11-Vigilância E Segurança 293.250 15.674.656 03.03.12.01-Ass. Tec. - Residente 0 10.911.104 03.03.12.02-Ass. Tec. - Não Residente 455.741 03.03.13-Deslocações E Estadias 248.765 817.864 95.730 38.685.431 03.03.14-Limpeza, Higiéne E Conforto 79.932 138.479 70.426 17.720.920 03.03.15-Formação 0 26.713.445 03.03.90-Outros Fornecimentos 140.026 458.704 242.923 37.117.020 03.03-Fornecimentos E Serviços Externos Total 2.420.886 3.715.042 4.138.654 432.631.222 03.05-Transferências03.05.01.01-Fundos Correntes E Serviços Autónomos 19.152.000 03.05.01.90-Outras Transferências 23.445.859 03.05.03.01.04-Pensões De Reserva 40.939.319 03.05.04.01-Quotas A Organismos Internacionais 501.927 03.05.04.02-Outras Transferências 2.699.740 03.05-Transferências Correntes Total 0 0 0 86.738.845 03.07-Outras Despesas 03.07.02-Impostos Correntes E Taxas 609.719 03.07.90-Outras Despesas Correntes 22.005.154 03.07-Outras Despesas Correntes Total 0 0 0 22.614.873 03-Despesas Correntes Total 8.084.409 46.916.990 23.174.558 3.514.247.625 04-Despesas De Capital 04.01-Imobilizações Corpóreas 04.01.03-Habitações 242.200 04.01.04-Edifícios 2.636.776 04.01.05-Maquinaria E Equipamentos Basicos 6.539.380 04.01.06-Ferramentas E Utensílios 138.866 04.01.07-Equipamentos De Carga E Transporte 0 04.01.08-Equipamentos Administrativos 3.531.988 04.01-Imobilizações Corpóreas Total 0 0 0 13.089.210 04-Despesas De Capital Total 0 0 0 13.089.210 FUN Total 8.084.409 46.916.990 23.174.558 3.527.336.835 ADIANTAMENTOS POR REGULARIZAR Total 129.926.263 8.084.409 46.916.990 23.174.558 3.657.263.098 Total Geral MAPA A.5_ PAGAMENTO DE PROGRAMA PLURIANUAL DE INVESTIMENTOS PÚBLICOS DIRECTAMENTE AOS PROJECTOS - 4º TRIMESTRE 2008 Económica 50.01.01.01 50.01.01.03 50.03.01.00 50.03.01.01 55.01.01.03 55.02.02.01 55.03.01.01 55.03.02.02 55.04.01.07 60.01.01.02 60.01.01.03 60.01.01.04 60.01.01.06 60.02.01.01 65.02.01.03 65.04.01.01 65.04.01.02 65.05.02.02 65.06.01.01 65.06.01.02 65.07.03.02 70.01.02.01 70.01.02.02 70.02.01.01 70.03.01.01 70.04.01.01 70.04.01.03 70.05.01.03 70.06.01.03 Total Geral Designação Outro Donativo Administração E Cidadão 84.798.517 Eficácia E Eficiência Do Processo Decisório 75.610.107 Direitos Humanos E Garantia Do Acesso À Justiça E Ao Direito 2.328.692 28.841.436 Reforço Da Administração Da Justiça 287.764.576 Formação De Recursos Humanos Para O Sector Turismo 157.143.829 Regulamentação E Modernização Do Mercado Interno 8.051.551 Reorganização E Desenvolvimento Das Pescas 188.415.620 Reconversão Da Agricultura De Sequeiro 24.730.099 Reforço De Parceria Com O Sector Privado Melhoria Da Qualidade Do Ensino Básico 48.413.892 Adequação Dos Recursos Do Ensino Secundário 24.503.370 Desenvolvimento Do Ensino Superior 4.341.708 Consolidação Da Acção Social Escolar 13.786.886 Construção De Instalações Físicas De Apoio À Políticas De Emprego E Formação 4.961.925 Melhoria Do Acesso Social Dos Pobres E Das Comunidades Pobres 4.109.790 População E Estratégias De Desenvolvimento 50.271.154 Promoção Da Igualdade E Equidade De Género 44.974.036 Desenvolvimento Da Formação Inicial Para Jovens Desempregados 55.898.017 Saúde Reprodutiva E Saúde Das Crianças 18.266.114 Estruturação Do Sistema De Saúde 268.987.018 Protecção Especial A Crianças E Adolescentes Em Risco 4.805.200 Gestão Integrada Dos Recursos Hidricos Conservação Da Natureza E Da Biodiversidade 180.067.418 Abastecimento E Distribuição De Água 118.376.288 Reforço Institucional E Consolidação Da Administração Energética Desenvolv. Das Infraestruturas Rodoviárias 469.961.550 Desenvolv.Das Infraestrut. Aeroportuárias Transportes Marítimos 22.053.000 Melhoria Da Gestão Rodoviária 478.508.888 1.712.952.905 Emprestimo 158.745.681 303.636.339 61.220.451 176.165.893 74.501.470 151.316.913 353.086.594 26.284.200 1.765.552.604 1.191.356.320 339.367.953 4.601.234.418 Total Geral 84.798.517 75.610.107 31.170.128 287.764.576 157.143.829 8.051.551 188.415.620 24.730.099 158.745.681 48.413.892 328.139.709 4.341.708 13.786.886 4.961.925 65.330.241 50.271.154 44.974.036 55.898.017 194.432.007 343.488.488 4.805.200 151.316.913 180.067.418 471.462.882 26.284.200 2.235.514.154 1.191.356.320 22.053.000 339.367.953 6.792.696.211 CONTAS PROVISÓRIAS 4º TRIMESTRE 2008 Mapa X - Programa Plurianual de Investimentos Públicos, segundo programas e subprogramas SUBPROGRAMA Codigo PROGRAMA Total FIN TOTAL ORÇ ACTUAL CABIMENTADOLIQUIDADO 50.01.01 Reforma e Modernização Administração da Administração E Cidadão Pública 672.132.272 535.305.664 502.462.652 502.462.652 Eficácia E Eficiência Do Processo Decisório 140.257.082 457.969.688 412.761.218 412.761.218 Política Integrada De Gestão De Recursos44.000.000 Humanos 123.157.037 122.096.818 122.096.818 Reforma e Modernização da Administração Pública856.389.354 Total 1.116.432.389 1.037.320.688 1.037.320.688 50.01.02 Modernização Reforço dos serviços Institucional de Registo Da Organização Notariado Ide.Dos22.000.000 Serviços Dos Rni14.200.000 13.716.788 13.716.788 Modernização dos serviços de Registo Notariado Ide. 22.000.000 Total 14.200.000 13.716.788 13.716.788 50.03.01 Melhoramento Do Direitos Funcionamento Humanos EDo Garantia Sistema Do De Acesso Justiça 114.331.000 À Justiça E Ao Direito 101.281.000 51.100.797 51.100.797 Reforço Da Administração Da Justiça 762.700.000 765.116.791 324.847.614 324.847.614 Reforma E Modernização Do Sistema Prisional 5.000.000 85.714.688 0 0 Melhoramento Do Funcionamento Do Sistema De Justiça 882.031.000 Total 952.112.479 375.948.411 375.948.411 50.04.01 Descentralizaçáo Desenvolvimento e Reforço do Poder Institucional Local 4.494.401 4.494.401 0 0 Poder Local E Ordenamento Do Territorio 61.619.250 57.277.542 12.000.000 12.000.000 Descentralizaçáo e Reforço do Poder Local Total 66.113.651 61.771.943 12.000.000 12.000.000 50.05.01 Combate À Criminalidade Luta ContraEAÀDroga Droga E Preservação Da 167.200.000 Segurança E O.P. 150.100.000 122.818.444 122.818.444 Reforço E Modernização Da Polícia Judiciária 0 75.331.770 0 0 Combate À Criminalidade E À Droga E Preservação167.200.000 Da Segurança E225.431.770 O.P. Total 122.818.444 122.818.444 50.05.02 Reforma E Modernização Reforma Das Das Forças Forças Armadas Armadas 163.904.464 160.004.464 160.000.000 160.000.000 Reforma E Modernização Das Forças Armadas Total163.904.464 160.004.464 160.000.000 160.000.000 50.07.01 Organização EMelhoria Modernização Do Sector Da Comunicação Da Comunicação Social Social 30.590.000 27.650.000 22.974.912 22.974.912 Organização E Modernização Da Comunicação Social 30.590.000 Total 27.650.000 22.974.912 22.974.912 55.01.01 Promoção/Desenvolvimento Aumento Da Eficiência Do Turismo Da Administração Turística 4.000.000 3.500.000 3.243.147 3.243.147 Formação De Recursos Humanos Para O 240.952.144 Sector Turismo208.905.391 189.753.992 189.753.992 Planeamento Turístico 3.000.000 3.000.000 2.949.310 2.949.310 Promoção/Desenvolvimento Do Turismo Total 247.952.144 215.405.391 195.946.449 195.946.449 55.02.01 Consolidação EAssistência Promoção Técnica Do Sector E Apoio Empresarial Institucional Nacional À 5.000.000 Dgie 2.000.000 1.920.154 1.920.154 Implementação De Um Sistema De Controlo 26.000.000 De Qualidade 23.845.109 23.806.234 23.806.234 Infra- Estruturação E Desenvolvimento De Zonas Industriais 0 0 0 0 Melhoramento Da Produtividade E Da Competitividade 51.000.000 Da Indústria 42.290.105 18.909.458 18.909.458 Consolidação E Promoção Do Sector Empresarial Nacional 82.000.000 Total 68.135.214 44.635.846 44.635.846 55.02.02 Desenvolver OIntegração Mercado EExterna Promover E Promoção As Exportações Das Exportações 20.000.000 10.824.421 7.526.516 7.526.516 Regulamentação E Modernização Do Mercado 59.600.000 Interno 67.151.551 63.167.639 63.167.639 Desenvolver O Mercado E Promover As Exportações79.600.000 Total 77.975.972 70.694.155 70.694.155 55.03.01 ReorganizaçãoGestão E Desenvolvimento Dos Recursos Das Haliêuticos Pescas 26.500.000 24.800.000 13.303.739 13.303.739 Modernização Da Frota E Desenvolvimento 19.400.000 Das Infra-Estruturas 15.250.000 8.839.098 8.839.098 Reorganização E Desenvolvimento Das Pescas 50.000.000 234.415.620 206.847.122 206.847.122 Reorganização E Desenvolvimento Das Pescas Total95.900.000 274.465.620 228.989.959 228.989.959 55.03.02 Modernização Desenvolvimento Do Sector AgrárioDa E Desenvolvimento Agricultura Irrigada Rural 276.941.890 353.805.955 288.459.509 288.459.509 Investigação Agrária E Transferência De Tecnologias 49.618.550 A Nível 89.598.246 Nacional 83.088.011 83.088.011 Melhoria Da Criação De Ruminantes E Da48.000.000 Suinicultura Intensiva 61.410.000 47.396.786 47.396.786 Reconversão Da Agricultura De Sequeiro796.734.876 797.034.876 457.262.179 457.262.179 Sistemas De Transformação E Dos Produtos Agro-Alimentares 0 62.087.128 59.784.005 59.784.005 Valorização Dos Resultados Técnico-Científicas Através 0 De Circuitos0De Comunicação 0 Eficientes 0 Modernização Do Sector Agrário E Desenvolvimento 1.171.295.316 Rural Total 1.363.936.205 935.990.490 935.990.490 55.04.01 Reforço Da Capacidade Ambiente Institucional De Gestão EAdequado Do Desempenho Ao Desenvolvimento Da Economia 0 Da Nacional Estatistica 0 0 0 Desenvolvimento Das Estatísticas Económicas 18.520.000 15.820.000 15.678.313 15.678.313 Desenvolvimento Sistema Financeiro 0 38.137.252 40.563.712 40.563.712 Modernização E Capacitação Dos Serviços De Património, 0 67.680.480 Fiscalidade E Inspecção 10.218.179 E Fiscalização 10.218.179 Promoção Da Qualidade E Da Acessibilidade 25.807.801 Das Estatisticas 17.205.577 Oficiais 17.205.577 17.205.577 Reforço De Parceria Com O Sector Privado 549.190.016 469.603.374 168.363.305 168.363.305 Reforço Da Capacidade De Gestão E Do Desempenho 593.517.817 Da Economia608.446.683 Nacional Total252.029.086 252.029.086 60.01.01 Consolidação, Adequação Modernização DosE Recursos Expansão Do Do Ensino Sistema Secundário Educativo 639.360.690 672.838.165 492.572.307 492.572.307 Alfabetização E Educação De Adultos 105.067.135 105.067.135 0 0 Consolidação Da Acção Social Escolar 233.476.949 223.375.626 182.890.002 182.890.002 Desenvolvimento Do Ensino Superior 43.600.000 95.756.027 92.156.027 92.156.027 Expansão e Melhoria Do Funcionamento Da 88.482.817 Pré-Escolar 85.059.817 6.513.132 6.513.132 Formulação E Execução Da Política Nacional 40.000.000 De Formação35.300.000 De Quadros De 34.820.131 Desenvolvimento34.820.131 Rural Gestão E Sustentabilidade Do Sistema 101.308.360 94.082.522 15.795.705 15.795.705 Melhoria Da Qualidade Do Ensino Básico 80.948.184 80.083.509 51.416.725 51.416.725 Consolidação, Modernização E Expansão Do Sistema 1.332.244.135 Educativo Total 1.391.562.801 876.164.029 876.164.029 60.02.01 Criação De Estruturas Construção E DeDe Um Instalações Sistema Nacional Físicas De Do Apoio Emprego 48.859.249 À Políticas E Formação De34.856.232 Emprego E Formação 34.432.032 34.432.032 Produção De Indicadores Do Mercado De Emprego 7.000.000 E Formação 5.200.000 5.059.684 5.059.684 Criação De Estruturas E De Um Sistema Nacional Do55.859.249 Emprego E Formação 40.056.232 Total 39.491.716 39.491.716 65.01.01 Garantia Da Segurança Garantia Da Alimentar Disponibilidade Às Populações E Estabilidade Alimentar 7.200.000Nos Mercados 6.200.000 6.114.110 6.114.110 Preven.Gestão De Crises Alim.E Reforço Do 8.450.000 Quadro Instit.Seg 5.950.000 Alimentar 5.850.788 5.850.788 Segurança Sanitária E Qualidade Dos Alimentos 54.465.580 E A Educação 54.001.553 Nutricional. 26.409.981 26.409.981 Garantia Da Segurança Alimentar Às Populações Total 70.115.580 66.151.553 38.374.879 38.374.879 65.02.01 Reduzir A Pobreza Melhoria E Promover Do Acesso A Inclusão Social Dos Social Pobres Dos Grupos E410.000.000 Das Comunidades Desfavorecidos 646.761.361 Pobres 562.856.377 562.856.377 EXECUÇÃO 502.462.652 412.761.218 122.096.818 1.037.320.688 13.716.788 13.716.788 51.100.797 324.847.614 0 375.948.411 0 12.000.000 12.000.000 122.818.444 0 122.818.444 160.000.000 160.000.000 22.974.912 22.974.912 3.243.147 189.753.992 2.949.310 195.946.449 1.920.154 23.806.234 0 18.909.458 44.635.846 7.526.516 63.167.639 70.694.155 13.303.739 8.839.098 206.847.122 228.989.959 288.459.509 83.088.011 47.396.786 457.262.179 59.784.005 0 935.990.490 0 15.678.313 40.563.712 10.218.179 17.205.577 168.363.305 252.029.086 492.312.216 0 182.890.002 92.156.027 6.513.132 34.820.131 15.795.705 51.416.725 875.903.938 34.432.032 5.059.684 39.491.716 6.114.110 5.850.788 26.409.981 38.374.879 562.856.377 % Exec/INI % Exec/actul 74,8% 294,3% 277,5% 121,1% 62,3% 62,3% 44,7% 42,6% 0,0% 42,6% 0,0% 19,5% 18,2% 73,5% #DIV/0! 73,5% 97,6% 97,6% 75,1% 75,1% 81,1% 78,8% 98,3% 79,0% 38,4% 91,6% #DIV/0! 37,1% 54,4% 37,6% 106,0% 88,8% 50,2% 45,6% 413,7% 238,8% 104,2% 167,5% 98,7% 57,4% #DIV/0! #DIV/0! 79,9% #DIV/0! 84,7% #DIV/0! #DIV/0! 66,7% 30,7% 42,5% 77,0% 0,0% 78,3% 211,4% 7,4% 87,1% 15,6% 63,5% 65,7% 70,5% 72,3% 70,7% 84,9% 69,2% 48,5% 54,7% 137,3% 93,9% 90,1% 99,1% 92,9% 96,6% 96,6% 50,5% 42,5% 0,0% 39,5% 0,0% 21,0% 19,4% 81,8% 0,0% 54,5% 100,0% 100,0% 83,1% 83,1% 92,7% 90,8% 98,3% 91,0% 96,0% 99,8% #DIV/0! 44,7% 65,5% 69,5% 94,1% 90,7% 53,6% 58,0% 88,2% 83,4% 81,5% 92,7% 77,2% 57,4% 96,3% #DIV/0! 68,6% #DIV/0! 99,1% 106,4% 15,1% 100,0% 35,9% 41,4% 73,2% 0,0% 81,9% 96,2% 7,7% 98,6% 16,8% 64,2% 62,9% 98,8% 97,3% 98,6% 98,6% 98,3% 48,9% 58,0% 87,0% INICIAL ACTUAL Tesouro CABIMENTADO LIQUIDADO 18.455.800 18.455.800 5.397.999 5.397.999 39.039.352 39.039.352 62.893.151 62.893.151 13.716.788 13.716.788 13.716.788 13.716.788 18.384.347 18.384.347 12.120.201 12.120.201 EXECUTADO 192.000.000 5.320.000 36.000.000 233.320.000 22.000.000 22.000.000 34.931.000 17.700.000 18.925.000 5.420.000 39.980.000 64.325.000 14.200.000 14.200.000 24.381.000 12.200.000 18.455.800 5.397.999 39.039.352 62.893.151 13.716.788 13.716.788 18.384.347 12.120.201 52.631.000 36.581.000 30.504.548 30.504.548 30.504.548 0 0 167.200.000 0 0 150.100.000 0 0 122.818.444 0 0 122.818.444 0 0 122.818.444 167.200.000 163.904.464 163.904.464 30.590.000 30.590.000 4.000.000 11.000.000 0 15.000.000 5.000.000 26.000.000 0 39.000.000 70.000.000 17.000.000 53.600.000 70.600.000 6.500.000 11.400.000 4.000.000 21.900.000 92.484.197 0 150.100.000 160.004.464 160.004.464 27.650.000 27.650.000 3.500.000 33.794.063 0 37.294.063 2.000.000 23.720.000 0 30.290.105 56.010.105 7.824.421 53.100.000 60.924.421 4.800.000 7.250.000 0 12.050.000 99.484.197 900.000 122.818.444 160.000.000 160.000.000 22.974.912 22.974.912 3.243.147 32.610.163 0 35.853.310 1.920.154 23.681.134 0 18.909.458 44.510.746 7.526.516 52.855.675 60.382.191 4.779.796 5.904.192 0 10.683.988 99.451.000 877.438 122.818.444 160.000.000 160.000.000 22.974.912 22.974.912 3.243.147 32.610.163 0 35.853.310 1.920.154 23.681.134 0 18.909.458 44.510.746 7.526.516 52.855.675 60.382.191 4.779.796 5.904.192 0 10.683.988 99.451.000 877.438 122.818.444 160.000.000 160.000.000 22.974.912 22.974.912 3.243.147 32.610.163 0 35.853.310 1.920.154 23.681.134 0 18.909.458 44.510.746 7.526.516 52.855.675 60.382.191 4.779.796 5.904.192 0 10.683.988 99.451.000 877.438 303.000.000 0 0 395.484.197 298.700.000 0 0 399.084.197 297.306.127 0 0 397.634.565 297.306.127 0 0 397.634.565 297.306.127 0 0 397.634.565 18.520.000 0 0 25.807.801 27.000.000 71.327.801 174.232.567 15.820.000 0 0 17.205.577 10.167.929 43.193.506 157.895.339 15.678.313 0 0 17.205.577 9.617.624 42.501.514 156.447.597 15.678.313 0 0 17.205.577 9.617.624 42.501.514 156.447.597 15.678.313 0 0 17.205.577 9.617.624 42.501.514 156.447.597 162.515.841 40.000.000 1.200.000 15.000.000 13.200.000 0 406.148.408 30.859.249 162.515.841 87.814.319 1.200.000 9.800.000 8.774.162 0 427.999.661 12.359.249 154.709.244 87.814.319 1.199.999 9.745.563 8.595.705 0 418.512.427 12.224.768 154.709.244 87.814.319 1.199.999 9.745.563 8.595.705 0 418.512.427 12.224.768 154.709.244 87.814.319 1.199.999 9.745.563 8.595.705 0 418.512.427 12.224.768 30.859.249 7.200.000 8.450.000 18.500.000 34.150.000 160.000.000 12.359.249 6.200.000 5.950.000 8.800.000 20.950.000 254.674.055 12.224.768 6.114.110 5.850.788 8.212.754 20.177.652 174.269.681 12.224.768 6.114.110 5.850.788 8.212.754 20.177.652 174.269.681 12.224.768 6.114.110 5.850.788 8.212.754 20.177.652 174.269.681 INICIAL OFN CABIMENTADO LIQUIDADO ACTUAL 0 0 0 0 0 0 0 0 7.000.000 720.000.000 5.000.000 732.000.000 7.000.000 727.916.791 85.714.688 820.631.479 2.328.692 287.764.576 0 290.093.268 2.328.692 287.764.576 0 290.093.268 0 0 75.331.770 75.331.770 0 0 0 0 0 0 188.415.620 188.415.620 188.415.620 188.415.620 188.415.620 188.415.620 0 0 0 0 0 0 0 0 CONTAS PROVISÓRIAS 4º TRIMESTRE 2008 Mapa X - Programa Plurianual de Investimentos Públicos, segundo programas e subprogramas Codigo SUBPROGRAMA Total Tesouro FIN TOTAL ORÇ ACTUAL CABIMENTADOLIQUIDADO EXECUÇÃO % Exec/INI % Exec/actul INICIAL ACTUAL EXECUTADO CABIMENTADO LIQUIDADO Promoção De Actividades Alternativas Às133.004.189 Faimo E À Pesca 114.653.696 46.971.272 46.971.272 46.971.272 35,3% 41,0% 58.000.000 36.286.082 28.830.522 28.830.522 28.830.522 Reduzir A Pobreza E Promover A Inclusão Social Dos 543.004.189 Grupos Desfavorecidos 761.415.057Total609.827.649 609.827.649 609.827.649 112,3% 80,1% 218.000.000 290.960.137 203.100.203 203.100.203 203.100.203 65.03.01 Promoção Do Desporto Infraestruturas Desportivas 80.000.000 80.000.000 79.996.693 79.996.693 79.996.693 100,0% 100,0% 80.000.000 80.000.000 79.996.693 79.996.693 79.996.693 Promoção Do Desporto Total 80.000.000 80.000.000 79.996.693 79.996.693 79.996.693 100,0% 100,0% 80.000.000 80.000.000 79.996.693 79.996.693 79.996.693 65.03.02 Desenvolver A Arquivos Cultura E Promover O Ambiente Cultural 5.000.000 7.675.000 6.396.251 6.396.251 6.396.251 127,9% 83,3% 5.000.000 7.675.000 6.396.251 6.396.251 6.396.251 Bibliotecas E Livros 0 0 0 0 0 #DIV/0! #DIV/0! Património 109.689.613 116.049.113 24.980.274 24.980.274 24.980.274 22,8% 21,5% 62.000.000 64.000.000 20.620.774 20.620.774 20.620.774 Desenvolver A Cultura E Promover O Ambiente Cultural 114.689.613 Total 123.724.113 31.376.525 31.376.525 31.376.525 27,4% 25,4% 67.000.000 71.675.000 27.017.025 27.017.025 27.017.025 65.04.01 População E Desenvolvimento População E Estratégias De Desenvolvimento 46.690.800 50.271.154 50.271.154 50.271.154 50.271.154 107,7% 100,0% Promoção Da Igualdade E Equidade De Género 65.488.373 91.807.409 48.451.297 48.451.297 48.451.297 74,0% 52,8% População E Desenvolvimento Total 112.179.173 142.078.563 98.722.451 98.722.451 98.722.451 88,0% 69,5% 65.05.01 Juventude, Cidadania Apoio Ao E Desenvolvimento Movimento Associativo E Federativo 12.000.000 Juvenil 10.033.921 8.668.598 8.668.598 8.668.598 72,2% 86,4% 12.000.000 10.033.921 8.668.598 8.668.598 8.668.598 Incentivo Ao Voluntariado Juvenil (Pnv) 12.600.000 12.600.000 12.541.977 12.541.977 12.541.303 99,5% 99,5% 12.600.000 12.600.000 12.541.977 12.541.977 12.541.303 Infra-Estruturas Para Capacitar E Promover 15.000.000 A Participação 18.236.629 Da Juventude 16.419.642 16.419.642 16.419.642 109,5% 90,0% 15.000.000 18.236.629 16.419.642 16.419.642 16.419.642 Integração Dos Jovens Na Vida Sócio-Económica 22.500.000 Cultural E21.229.450 Profissional 20.929.185 20.929.185 20.929.185 93,0% 98,6% 22.500.000 21.229.450 20.929.185 20.929.185 20.929.185 Reforço Institucional Do Sector E Desenvolvimento 1.000.000 Da Comunicação 1.000.000 0 0 0 0,0% 0,0% 1.000.000 1.000.000 0 0 0 Juventude, Cidadania E Desenvolvimento Total 63.100.000 63.100.000 58.559.402 58.559.402 58.558.728 92,8% 92,8% 63.100.000 63.100.000 58.559.402 58.559.402 58.558.728 65.05.02 Promoção Do Emprego Desenvolvimento - Formação Da Formação Profissional Inicial E Qualificação Para 391.315.000 Jovens Desempregados 262.625.764 152.117.799 152.117.799 152.117.799 38,9% 57,9% 130.850.000 125.850.000 37.232.080 37.232.080 37.232.080 Promoção E Desenvolvimento De Micro-Empresas 25.000.000 13.000.000 7.500.000 7.500.000 7.500.000 30,0% 57,7% 25.000.000 13.000.000 7.500.000 7.500.000 7.500.000 Promoção Do Emprego - Formação Profissional E Qualificação 416.315.000 Total 275.625.764 159.617.799 159.617.799 159.617.799 38,3% 57,9% 155.850.000 138.850.000 44.732.080 44.732.080 44.732.080 65.06.01 Reformar O Sitema Desenvolvimento Para Promover DosARecursos Saúde Humanos28.000.000 24.000.000 24.000.000 24.000.000 24.000.000 85,7% 100,0% 28.000.000 24.000.000 24.000.000 24.000.000 24.000.000 Estruturação Do Sistema De Saúde 901.396.182 1.102.331.605 827.905.578 827.905.578 827.905.578 91,8% 75,1% 204.000.000 223.185.000 222.466.847 222.466.847 222.466.847 Saúde Reprodutiva E Saúde Das Crianças 223.584.420 256.303.543 197.346.666 197.346.666 197.346.666 88,3% 77,0% 0 5.000.000 2.914.659 2.914.659 2.914.659 Vigilância Integrada Das Doenças 48.000.000 31.465.000 30.471.922 30.471.922 30.471.922 63,5% 96,8% 43.000.000 26.465.000 25.772.987 25.772.987 25.772.987 Reformar O Sitema Para Promover A Saúde Total 1.200.980.602 1.414.100.148 1.079.724.166 1.079.724.166 1.079.724.166 89,9% 76,4% 275.000.000 278.650.000 275.154.493 275.154.493 275.154.493 65.07.01 Reforma Do Sistema Condições De Segurança De Trabalho Social A Novo E Melhoria Contexto Das Social 2.100.000 Condições E Económico De Trabalho 1.260.000 1.234.750 1.234.750 1.234.750 58,8% 98,0% 2.100.000 1.260.000 1.234.750 1.234.750 1.234.750 Reforma Do Sistema De Segurança Social E Melhoria 2.100.000 Das Condições 1.260.000 De Trabalho Total 1.234.750 1.234.750 1.234.750 58,8% 98,0% 2.100.000 1.260.000 1.234.750 1.234.750 1.234.750 65.07.02 Protecção, Inserção Desenvolvimento E Integração De Social Uma Capacidades De 393.881.640 Intervenção Para 393.151.640 Grupos Alvo 393.004.154 393.004.154 393.004.154 99,8% 100,0% 346.381.640 347.221.640 347.145.776 347.145.776 347.145.776 Promoção E Apoio Às Iniciativas Locais E22.000.000 De Desenvolvimento 20.700.000 Comunitário20.632.732 20.632.732 20.632.732 93,8% 99,7% 15.000.000 13.700.000 13.632.732 13.632.732 13.632.732 Protecção, Inserção E Integração Social Total 415.881.640 413.851.640 413.636.886 413.636.886 413.636.886 99,5% 99,9% 361.381.640 360.921.640 360.778.508 360.778.508 360.778.508 65.07.03 Protecção DosPromoção Direitos Da Dos Criança Direitos Da Criança 6.431.067 6.431.067 6.431.067 6.431.067 6.431.067 100,0% 100,0% 6.431.067 6.431.067 6.431.067 6.431.067 6.431.067 Protecção Especial A Crianças E Adolescentes 59.510.396 Em Risco 49.442.978 40.289.596 40.289.596 40.289.596 67,7% 81,5% 7.484.396 7.484.396 7.484.396 7.484.396 7.484.396 Protecção Dos Direitos Da Criança Total 65.941.463 55.874.045 46.720.663 46.720.663 46.720.663 70,9% 83,6% 13.915.463 13.915.463 13.915.463 13.915.463 13.915.463 65.08.01 Ajustamento E Ajustamento Reequacionamento E Reequacionamento Da Promoção Habitacional Da Promoção 145.000.000 Habitacional 136.308.780 134.391.090 134.391.090 134.391.090 92,7% 98,6% 45.000.000 37.508.780 35.891.090 35.891.090 35.891.090 Ajustamento E Reequacionamento Da Promoção Habitacional 145.000.000Total 136.308.780 134.391.090 134.391.090 134.391.090 92,7% 98,6% 45.000.000 37.508.780 35.891.090 35.891.090 35.891.090 70.01.01 Ordenamento do Ordenamento Território e Planeamento Do Território E Urbanístico Planeamento 109.943.200 Urbanístico 114.123.275 38.753.075 38.753.075 38.753.075 35,2% 34,0% 0 7.597.000 7.564.028 7.564.028 7.564.028 Ordenamento do Território e Planeamento Urbanístico 109.943.200 Total 114.123.275 38.753.075 38.753.075 38.753.075 35,2% 34,0% 0 7.597.000 7.564.028 7.564.028 7.564.028 70.01.02 Protecção E Conservação Conservação Do Da Ambiente Natureza E Da Biodiversidade 305.799.372 315.753.996 308.171.885 308.171.885 308.171.885 100,8% 97,6% 5.000.000 2.221.707 2.221.707 2.221.707 2.221.707 Gestão De Vulnerabilidade Ambiental 362.320.000 302.359.668 290.323.180 290.323.180 290.322.430 80,1% 96,0% 13.000.000 14.878.293 14.476.201 14.476.201 14.475.451 Gestão Integrada Dos Recursos Hidricos 1.008.074.655 910.820.998 323.235.775 323.235.775 323.235.775 32,1% 35,5% 40.747.129 40.747.129 40.747.129 40.747.129 40.747.129 Protecção E Valorização Do Litoral E Das Zonas Costeiras 0 0 0 0 0 #DIV/0! #DIV/0! 0 0 0 0 0 Reforço Da Capacidade Institucional 72.780.000 60.880.000 54.709.511 54.709.511 54.709.511 75,2% 89,9% 6.300.000 6.300.000 6.003.016 6.003.016 6.003.016 Protecção E Conservação Do Ambiente Total 1.748.974.027 1.589.814.662 976.440.351 976.440.351 976.439.601 55,8% 61,4% 65.047.129 64.147.129 63.448.053 63.448.053 63.447.303 70.02.01 Promoção E Reforço Abastecimento Do Saneamento E Distribuição BásicoDe Água 640.039.360 791.949.428 621.311.254 621.311.254 621.311.254 97,1% 78,5% 62.166.317 62.166.317 62.131.223 62.131.223 62.131.223 Recolha E Tratamento De Águas Residuais 636.315.000 529.444.043 83.703.915 83.703.915 83.703.915 13,2% 15,8% 7.500.000 51.500.000 51.500.000 51.500.000 51.500.000 Recolha E Tratamento De Resíduos Sólidos 20.169.012 25.169.012 3.749.806 3.749.806 3.749.806 18,6% 14,9% Promoção E Reforço Do Saneamento Básico Total 1.296.523.372 1.346.562.483 708.764.975 708.764.975 708.764.975 54,7% 52,6% 69.666.317 113.666.317 113.631.223 113.631.223 113.631.223 70.03.01 Desenvolvimento Desenvolv. Do Sector Quadro Energético Legal E Regulamentar 20.000.000 Do Sub-Sector Combustiveis 0 0 0 0 0,0% #DIV/0! 20.000.000 0 0 0 0 Desenvolvimento Das Infra-Estruturas De 1.631.633.333 Produção De Energia 2.031.187.509 E Água 642.515.207 642.515.207 642.515.207 39,4% 31,6% 78.000.000 213.243.695 210.866.554 210.866.554 210.866.554 Expansão Modernização Redes De Transporte 49.500.000 E Distribuição 41.495.497 41.386.983 41.386.983 41.386.983 83,6% 99,7% 49.500.000 18.495.497 18.396.730 18.396.730 18.396.730 Promoção Da Conservação De Energia 38.120.000 37.520.000 4.191.128 4.191.128 4.191.128 11,0% 11,2% 5.000.000 4.400.000 4.191.128 4.191.128 4.191.128 Promoção Das Energias Renováveis 602.162.258 554.920.529 17.833.691 17.833.691 17.833.691 3,0% 3,2% 54.573.800 7.332.071 7.332.071 7.332.071 7.332.071 Reforço Institucional E Consolidação Da Administração 68.412.867 Energética 93.347.067 43.720.191 43.720.191 43.720.191 63,9% 46,8% 13.892.867 6.212.867 6.105.991 6.105.991 6.105.991 Desenvolvimento Do Sector Energético Total 2.409.828.458 2.758.470.602 749.647.200 749.647.200 749.647.200 31,1% 27,2% 220.966.667 249.684.130 246.892.474 246.892.474 246.892.474 70.04.01 Desenvolvimento Desenvolv. Das Infra-Estruturas Das Infraestruturas De Transporte Rodoviárias 1.763.263.562 4.377.274.414 4.011.886.554 4.011.886.554 4.011.599.754 227,5% 91,6% 842.371.531 908.371.531 904.088.686 904.088.686 903.801.886 Desenvolv.Das Infraestrut. Aeroportuárias 100.000.000 1.206.069.205 1.191.356.320 1.191.356.320 1.191.356.320 1191,4% 98,8% 0 0 0 0 0 Desenvolv.Das Infraestrut. Portuárias 425.250.026 667.647.066 767.447.660 767.447.660 767.447.660 180,5% 114,9% Desenvolvimento Das Infra-Estruturas De Transporte 2.288.513.588 Total 6.250.990.685 5.970.690.534 5.970.690.534 5.970.403.734 260,9% 95,5% 842.371.531 908.371.531 904.088.686 904.088.686 903.801.886 70.05.01 Desenvolvimento Transportes Do Sistema Marítimos De Transportes 232.530.000 236.309.497 37.502.778 37.502.778 37.502.778 16,1% 15,9% 12.000.000 15.779.497 15.449.778 15.449.778 15.449.778 Desenvolvimento Do Sistema De Transportes Total232.530.000 236.309.497 37.502.778 37.502.778 37.502.778 16,1% 15,9% 12.000.000 15.779.497 15.449.778 15.449.778 15.449.778 70.06.01 Melhoria Da Gestão Melhoria DasDa Infraestruturas Gestão Rodoviária Económicas 418.814.652 693.598.373 641.425.111 641.425.111 641.425.111 153,2% 92,5% 102.814.652 177.264.652 177.057.158 177.057.158 177.057.158 Melhoria Da Gestão Das Infraestruturas Económicas 418.814.652 Total 693.598.373 641.425.111 641.425.111 641.425.111 153,2% 92,5% 102.814.652 177.264.652 177.057.158 177.057.158 177.057.158 Total Geral 17.581.031.688 23.120.946.403 16.264.127.950 16.264.127.950 16.263.579.635 92,5% 70,3% 4.379.328.518 4.396.076.942 4.083.900.111 4.083.900.111 4.083.611.887 PROGRAMA INICIAL ACTUAL 732.000.000 1.084.378.869 OFN CABIMENTADO LIQUIDADO 478.508.888 478.508.888 CONTAS PROVISÓRIAS 4º TRIMESTRE 2008 Mapa X - Programa Plurianual de Investimentos Públicos, segundo programas e subprogramas SUBPROGRAMA Codigo PROGRAMA FCP AAL EXECUTADO INICIAL ACTUAL CABIMENTADO LIQUIDADO 50.01.01 Reforma e Modernização Administração da Administração E Cidadão Pública Eficácia E Eficiência Do Processo Decisório 0 7.500.000 7.707.000 3.744.185 3.744.185 Política Integrada De Gestão De Recursos Humanos Reforma e Modernização da Administração Pública Total 0 7.500.000 7.707.000 3.744.185 3.744.185 50.01.02 Modernização Reforço dos serviços Institucional de Registo Da Organização Notariado Ide.Dos Serviços Dos Rni Modernização dos serviços de Registo Notariado Ide. Total 50.03.01 Melhoramento Do Direitos Funcionamento Humanos EDo Garantia Sistema Do De Acesso JustiçaÀ2.328.692 Justiça E Ao Direito Reforço Da Administração Da Justiça 287.764.576 Reforma E Modernização Do Sistema Prisional 0 Melhoramento Do Funcionamento Do Sistema De Justiça 290.093.268 Total 50.04.01 Descentralizaçáo Desenvolvimento e Reforço do Poder Institucional Local Poder Local E Ordenamento Do Territorio Descentralizaçáo e Reforço do Poder Local Total 50.05.01 Combate À Criminalidade Luta ContraEAÀDroga Droga E Preservação Da Segurança E O.P. 0 Reforço E Modernização Da Polícia Judiciária Combate À Criminalidade E À Droga E Preservação Da Segurança 0 E O.P. Total 50.05.02 Reforma E Modernização Reforma Das Das Forças Forças Armadas Armadas Reforma E Modernização Das Forças Armadas Total 50.07.01 Organização EMelhoria Modernização Do Sector Da Comunicação Da Comunicação Social Social Organização E Modernização Da Comunicação Social Total 55.01.01 Promoção/Desenvolvimento Aumento Da Eficiência Do Turismo Da Administração Turística Formação De Recursos Humanos Para O Sector Turismo Planeamento Turístico Promoção/Desenvolvimento Do Turismo Total 55.02.01 Consolidação EAssistência Promoção Técnica Do Sector E Apoio Empresarial Institucional Nacional À Dgie Implementação De Um Sistema De Controlo De Qualidade Infra- Estruturação E Desenvolvimento De Zonas Industriais Melhoramento Da Produtividade E Da Competitividade Da Indústria Consolidação E Promoção Do Sector Empresarial Nacional Total 55.02.02 Desenvolver OIntegração Mercado EExterna Promover E Promoção As Exportações Das Exportações Regulamentação E Modernização Do Mercado Interno Desenvolver O Mercado E Promover As Exportações Total 55.03.01 ReorganizaçãoGestão E Desenvolvimento Dos Recursos Das Haliêuticos Pescas Modernização Da Frota E Desenvolvimento Das Infra-Estruturas Reorganização E Desenvolvimento Das188.415.620 Pescas Reorganização E Desenvolvimento Das Pescas Total 188.415.620 55.03.02 Modernização Desenvolvimento Do Sector AgrárioDa E Desenvolvimento Agricultura Irrigada Rural 48.000.000 47.793.000 25.108.634 25.108.634 Investigação Agrária E Transferência De Tecnologias A Nível Nacional Melhoria Da Criação De Ruminantes E Da Suinicultura Intensiva 0 17.580.000 11.100.000 11.100.000 Reconversão Da Agricultura De Sequeiro 0 0 0 0 Sistemas De Transformação E Dos Produtos Agro-Alimentares Valorização Dos Resultados Técnico-Científicas Através De Circuitos De Comunicação Eficientes Modernização Do Sector Agrário E Desenvolvimento Rural Total 48.000.000 65.373.000 36.208.634 36.208.634 55.04.01 Reforço Da Capacidade Ambiente Institucional De Gestão EAdequado Do Desempenho Ao Desenvolvimento Da EconomiaDa Nacional Estatistica Desenvolvimento Das Estatísticas Económicas Desenvolvimento Sistema Financeiro 0 0 0 0 0 Modernização E Capacitação Dos Serviços De Património, Fiscalidade E Inspecção E Fiscalização Promoção Da Qualidade E Da Acessibilidade Das Estatisticas Oficiais Reforço De Parceria Com O Sector Privado Reforço Da Capacidade De Gestão E Do Desempenho Da Economia 0 Nacional 0 Total 0 0 0 60.01.01 Consolidação, Adequação Modernização DosE Recursos Expansão Do Do Ensino Sistema Secundário Educativo 0 3.423.000 3.395.680 3.395.680 Alfabetização E Educação De Adultos 0 0 0 0 Consolidação Da Acção Social Escolar 0 0 0 0 Desenvolvimento Do Ensino Superior Expansão e Melhoria Do Funcionamento Da Pré-Escolar 47.700.000 44.277.000 4.813.137 4.813.137 Formulação E Execução Da Política Nacional De Formação De Quadros De Desenvolvimento Rural Gestão E Sustentabilidade Do Sistema Melhoria Da Qualidade Do Ensino Básico Consolidação, Modernização E Expansão Do Sistema Educativo Total 47.700.000 47.700.000 8.208.817 8.208.817 60.02.01 Criação De Estruturas Construção E DeDe Um Instalações Sistema Nacional Físicas De Do Apoio Emprego À Políticas E Formação De Emprego E Formação Produção De Indicadores Do Mercado De Emprego E Formação Criação De Estruturas E De Um Sistema Nacional Do Emprego E Formação Total 65.01.01 Garantia Da Segurança Garantia Da Alimentar Disponibilidade Às Populações E Estabilidade Alimentar Nos Mercados Preven.Gestão De Crises Alim.E Reforço Do Quadro Instit.Seg Alimentar Segurança Sanitária E Qualidade Dos Alimentos E A Educação Nutricional. Garantia Da Segurança Alimentar Às Populações Total 65.02.01 Reduzir A Pobreza Melhoria E Promover Do Acesso A Inclusão Social Dos Social Pobres Dos Grupos E Das Comunidades Desfavorecidos Pobres 0 0 0 0 EXECUTADO 3.744.185 3.744.185 INICIAL ACTUAL Donativo CABIMENTADO LIQUIDADO 480.985.506 480.985.506 122.946.727 122.946.727 78.057.467 78.057.467 681.989.700 681.989.700 EXECUTADO 474.132.272 127.437.082 3.000.000 604.569.354 513.314.330 163.537.219 78.177.037 755.028.586 480.985.506 122.946.727 78.057.467 681.989.700 65.575.000 0 65.575.000 0 28.841.436 0 28.841.436 0 28.841.436 0 65.575.000 4.494.401 61.619.250 66.113.651 0 65.575.000 4.494.401 57.277.542 61.771.943 0 28.841.436 0 12.000.000 12.000.000 0 28.841.436 0 12.000.000 12.000.000 0 28.841.436 0 12.000.000 12.000.000 0 0 0 0 0 0 229.952.144 3.000.000 232.952.144 175.111.328 3.000.000 178.111.328 157.143.829 2.949.310 160.093.139 157.143.829 2.949.310 160.093.139 157.143.829 2.949.310 160.093.139 INICIAL ACTUAL 0 0 0 0 0 0 0 0 0 0 316.000.000 316.000.000 351.056.544 254.026.525 254.026.525 388.941.650 158.745.681 158.745.681 303.636.339 158.745.681 158.745.681 303.636.339 158.745.681 158.745.681 303.636.339 0 0 0 0 0 1.208.000 390.149.650 17.535.058 5.200.000 22.735.058 1.200.000 304.836.339 17.245.339 5.059.684 22.305.023 1.200.000 304.836.339 17.245.339 5.059.684 22.305.023 1.200.000 304.836.339 17.245.339 5.059.684 22.305.023 163.072.516 162.986.746 162.986.746 162.986.746 0 125.109 125.100 125.100 125.100 12.000.000 12.125.109 3.000.000 14.051.551 17.051.551 20.000.000 8.000.000 46.000.000 74.000.000 206.528.758 88.698.246 43.830.000 498.334.876 62.087.128 0 125.100 0 10.311.964 10.311.964 8.523.943 2.934.906 18.431.502 29.890.351 163.899.875 82.210.573 36.296.786 159.956.052 59.784.005 0 125.100 0 10.311.964 10.311.964 8.523.943 2.934.906 18.431.502 29.890.351 163.899.875 82.210.573 36.296.786 159.956.052 59.784.005 0 125.100 0 10.311.964 10.311.964 8.523.943 2.934.906 18.431.502 29.890.351 163.899.875 82.210.573 36.296.786 159.956.052 59.784.005 36.208.634 727.811.119 0 899.479.008 0 502.147.291 0 502.147.291 0 502.147.291 0 0 0 0 0 206.190.016 206.190.016 114.071.579 105.067.135 70.961.108 3.600.000 39.582.817 25.000.000 88.108.360 72.740.184 519.131.183 0 38.137.252 67.680.480 0 205.408.920 311.226.652 122.578.176 105.067.135 60.859.785 7.941.708 39.582.817 25.500.000 85.308.360 78.875.509 525.713.490 4.961.925 40.563.712 10.218.179 0 0 50.781.891 29.092.691 0 28.180.758 4.341.708 499.996 25.074.568 7.200.000 50.216.725 144.606.446 4.961.925 40.563.712 10.218.179 0 0 50.781.891 29.092.691 0 28.180.758 4.341.708 499.996 25.074.568 7.200.000 50.216.725 144.606.446 4.961.925 40.563.712 10.218.179 0 0 50.781.891 28.832.600 0 28.180.758 4.341.708 499.996 25.074.568 7.200.000 50.216.725 144.346.355 4.961.925 0 4.961.925 4.961.925 4.961.925 4.961.925 8.208.000 359.264.544 18.000.000 7.000.000 25.000.000 35.965.580 35.965.580 250.000.000 45.201.553 45.201.553 229.014.790 18.197.227 18.197.227 225.599.950 18.197.227 18.197.227 225.599.950 18.197.227 18.197.227 225.599.950 0 25.108.634 0 3.395.680 0 0 4.813.137 8.208.817 0 EXECUTADO 3.066.334 281.305.469 5.000.000 289.371.803 0 0 4.325.000 25.000.000 0 29.325.000 12.000.000 12.000.000 3.000.000 6.000.000 9.000.000 20.000.000 8.000.000 46.000.000 74.000.000 136.457.693 49.618.550 48.000.000 493.734.876 0 11.100.000 0 Empréstimo CABIMENTADO LIQUIDADO 3.021.346 3.021.346 280.672.307 280.672.307 4.999.999 4.999.999 288.693.652 288.693.652 0 0 0 0 1.546.322 1.546.322 24.962.837 24.962.837 0 0 26.509.159 26.509.159 6.000.000 0 5.000.000 11.000.000 0 0 6.825.000 25.000.000 0 31.825.000 3.021.346 280.672.307 4.999.999 288.693.652 0 0 1.546.322 24.962.837 0 26.509.159 CONTAS PROVISÓRIAS 4º TRIMESTRE 2008 Mapa X - Programa Plurianual de Investimentos Públicos, segundo programas e subprogramas Codigo PROGRAMA SUBPROGRAMA EXECUTADO INICIAL ACTUAL Promoção De Actividades Alternativas Às Faimo E À Pesca Reduzir A Pobreza E Promover A Inclusão Social Dos Grupos Desfavorecidos 0 Total 0 65.03.01 Promoção Do Desporto Infraestruturas Desportivas Promoção Do Desporto Total 65.03.02 Desenvolver A Arquivos Cultura E Promover O Ambiente Cultural Bibliotecas E Livros 0 0 Património 0 3.359.500 Desenvolver A Cultura E Promover O Ambiente Cultural Total 0 3.359.500 65.04.01 População E Desenvolvimento População E Estratégias De Desenvolvimento Promoção Da Igualdade E Equidade De Género População E Desenvolvimento Total 65.05.01 Juventude, Cidadania Apoio Ao E Desenvolvimento Movimento Associativo E Federativo Juvenil Incentivo Ao Voluntariado Juvenil (Pnv) Infra-Estruturas Para Capacitar E Promover A Participação Da Juventude Integração Dos Jovens Na Vida Sócio-Económica Cultural E Profissional Reforço Institucional Do Sector E Desenvolvimento Da Comunicação Juventude, Cidadania E Desenvolvimento Total 65.05.02 Promoção Do Emprego Desenvolvimento - Formação Da Formação Profissional Inicial E Qualificação Para Jovens Desempregados Promoção E Desenvolvimento De Micro-Empresas Promoção Do Emprego - Formação Profissional E Qualificação Total 65.06.01 Reformar O Sitema Desenvolvimento Para Promover DosARecursos Saúde Humanos Estruturação Do Sistema De Saúde Saúde Reprodutiva E Saúde Das Crianças Vigilância Integrada Das Doenças Reformar O Sitema Para Promover A Saúde Total 65.07.01 Reforma Do Sistema Condições De Segurança De Trabalho Social A Novo E Melhoria Contexto Das Social Condições E Económico De Trabalho Reforma Do Sistema De Segurança Social E Melhoria Das Condições De Trabalho Total 65.07.02 Protecção, Inserção Desenvolvimento E Integração De Social Uma Capacidades De Intervenção Para Grupos Alvo Promoção E Apoio Às Iniciativas Locais E De Desenvolvimento Comunitário Protecção, Inserção E Integração Social Total 65.07.03 Protecção DosPromoção Direitos Da Dos Criança Direitos Da Criança Protecção Especial A Crianças E Adolescentes Em Risco Protecção Dos Direitos Da Criança Total 65.08.01 Ajustamento E Ajustamento Reequacionamento E Reequacionamento Da Promoção Habitacional Da Promoção Habitacional Ajustamento E Reequacionamento Da Promoção Habitacional Total 70.01.01 Ordenamento do Ordenamento Território e Planeamento Do Território E Urbanístico Planeamento Urbanístico Ordenamento do Território e Planeamento Urbanístico Total 70.01.02 Protecção E Conservação Conservação Do Da Ambiente Natureza E Da Biodiversidade Gestão De Vulnerabilidade Ambiental Gestão Integrada Dos Recursos Hidricos 55.650.000 43.788.229 Protecção E Valorização Do Litoral E Das Zonas Costeiras Reforço Da Capacidade Institucional 0 0 Protecção E Conservação Do Ambiente Total 55.650.000 43.788.229 70.02.01 Promoção E Reforço Abastecimento Do Saneamento E Distribuição BásicoDe Água 55.650.000 78.984.285 Recolha E Tratamento De Águas Residuais 0 15.409.933 Recolha E Tratamento De Resíduos Sólidos 0 5.000.000 Promoção E Reforço Do Saneamento Básico Total 55.650.000 99.394.218 70.03.01 Desenvolvimento Desenvolv. Do Sector Quadro Energético Legal E Regulamentar Do Sub-Sector Combustiveis Desenvolvimento Das Infra-Estruturas De Produção De Energia E Água Expansão Modernização Redes De Transporte E Distribuição Promoção Da Conservação De Energia Promoção Das Energias Renováveis Reforço Institucional E Consolidação Da Administração Energética Desenvolvimento Do Sector Energético Total 70.04.01 Desenvolvimento Desenvolv. Das Infra-Estruturas Das Infraestruturas De Transporte Rodoviárias Desenvolv.Das Infraestrut. Aeroportuárias Desenvolv.Das Infraestrut. Portuárias Desenvolvimento Das Infra-Estruturas De Transporte Total 70.05.01 Desenvolvimento Transportes Do Sistema Marítimos De Transportes Desenvolvimento Do Sistema De Transportes Total 70.06.01 Melhoria Da Gestão Melhoria DasDa Infraestruturas Gestão Rodoviária Económicas Melhoria Da Gestão Das Infraestruturas Económicas Total Total Geral 478.508.888 214.500.000 267.321.947 FCP AAL CABIMENTADO LIQUIDADO EXECUTADO 0 0 0 0 3.359.500 3.359.500 0 3.359.500 3.359.500 0 3.359.500 3.359.500 INICIAL 78.367.614 307.382.404 47.689.613 47.689.613 46.690.800 61.988.373 108.679.173 48.689.613 48.689.613 50.271.154 88.307.409 138.578.563 1.000.000 1.000.000 50.271.154 44.974.036 95.245.190 1.000.000 1.000.000 50.271.154 44.974.036 95.245.190 EXECUTADO 18.140.750 243.740.700 1.000.000 1.000.000 50.271.154 44.974.036 95.245.190 INICIAL Empréstimo CABIMENTADO LIQUIDADO ACTUAL EXECUTADO 0 0 0 163.072.516 0 0 162.986.746 0 0 162.986.746 0 0 162.986.746 0 0 0 0 0 0 0 0 0 0 0 0 3.500.000 3.500.000 3.500.000 3.500.000 3.477.261 3.477.261 3.477.261 3.477.261 3.477.261 3.477.261 58.890.822 55.898.017 55.898.017 55.898.017 147.700.000 77.884.942 58.987.702 58.987.702 58.987.702 112.765.000 58.890.822 55.898.017 55.898.017 55.898.017 147.700.000 77.884.942 58.987.702 58.987.702 58.987.702 235.396.182 65.584.420 5.000.000 305.980.602 428.916.248 31.330.068 5.000.000 465.246.316 348.960.743 18.266.114 4.698.935 371.925.792 348.960.743 18.266.114 4.698.935 371.925.792 348.960.743 18.266.114 4.698.935 371.925.792 462.000.000 158.000.000 450.230.357 219.973.475 256.477.988 176.165.893 256.477.988 176.165.893 256.477.988 176.165.893 620.000.000 670.203.832 432.643.881 432.643.881 432.643.881 47.500.000 45.930.000 45.858.378 45.858.378 45.858.378 7.000.000 7.000.000 7.000.000 7.000.000 7.000.000 7.000.000 7.000.000 7.000.000 7.000.000 7.000.000 47.500.000 45.930.000 45.858.378 45.858.378 45.858.378 41.958.582 41.958.582 0 0 106.526.275 106.526.275 313.532.289 287.481.375 238.563.088 32.805.200 32.805.200 0 0 31.189.047 31.189.047 305.950.178 275.846.979 106.149.017 32.805.200 32.805.200 0 0 31.189.047 31.189.047 305.950.178 275.846.979 106.149.017 32.805.200 32.805.200 0 0 31.189.047 31.189.047 305.950.178 275.846.979 106.149.017 100.000.000 100.000.000 98.800.000 98.800.000 98.500.000 98.500.000 98.500.000 98.500.000 98.500.000 98.500.000 671.414.438 587.722.552 151.316.913 151.316.913 151.316.913 54.580.000 894.156.752 279.861.060 174.918.116 20.169.012 474.948.188 48.706.495 736.652.669 151.177.315 19.698.973 0 170.876.288 48.706.495 736.652.669 151.177.315 19.698.973 0 170.876.288 48.706.495 736.652.669 151.177.315 19.698.973 0 170.876.288 671.414.438 175.108.780 421.315.000 587.722.552 370.937.766 287.615.994 151.316.913 353.086.594 0 151.316.913 353.086.594 0 151.316.913 353.086.594 0 596.423.780 658.553.760 353.086.594 353.086.594 353.086.594 965.300.000 1.284.395.845 301.520.168 301.520.168 301.520.168 588.333.333 533.547.969 0 0 0 0 0 0 23.000.000 33.120.000 33.120.000 0 0 0 40.211.558 40.211.558 10.501.620 10.501.620 10.501.620 507.376.900 507.376.900 5.000.000 0 0 0 0 49.520.000 87.134.200 1.043.631.558 1.357.727.403 312.021.788 312.021.788 312.021.788 1.145.230.233 1.151.059.069 427.829.510 1.150.297.477 1.242.245.264 1.242.245.264 1.242.245.264 493.062.521 2.318.605.406 100.000.000 1.206.069.205 425.250.026 667.647.066 767.447.660 767.447.660 767.447.660 853.079.536 1.817.944.543 2.009.692.924 2.009.692.924 2.009.692.924 593.062.521 3.524.674.611 220.530.000 220.530.000 22.053.000 22.053.000 22.053.000 220.530.000 220.530.000 22.053.000 22.053.000 22.053.000 0 62.500.000 62.500.000 62.500.000 62.500.000 316.000.000 453.833.721 0 62.500.000 62.500.000 62.500.000 62.500.000 316.000.000 453.833.721 147.714.722 7.271.282.654 8.952.325.606 5.796.547.085 5.796.547.085 5.796.286.994 4.983.920.516 8.420.843.039 130.128.485 22.990.253 130.128.485 22.990.253 130.128.485 22.990.253 25.022.716 25.022.716 25.022.716 0 25.022.716 54.916.122 12.504.942 3.749.806 71.170.870 0 25.022.716 54.916.122 12.504.942 3.749.806 71.170.870 0 25.022.716 54.916.122 12.504.942 3.749.806 71.170.870 66.480.000 956.862.460 347.114.263 207.500.000 20.169.012 574.783.275 147.714.722 Donativo CABIMENTADO LIQUIDADO 18.140.750 18.140.750 243.740.700 243.740.700 112.765.000 52.026.000 52.026.000 0 0 109.943.200 109.943.200 300.799.372 349.320.000 240.263.088 147.714.722 ACTUAL 75.004.189 325.004.189 0 0 0 37.614.200 37.614.200 37.614.200 190.732.938 190.732.938 190.732.938 1.865.552.604 1.865.552.604 1.865.552.604 1.191.356.320 1.191.356.320 1.191.356.320 3.056.908.924 3.056.908.924 3.056.908.924 401.867.953 401.867.953 401.867.953 401.867.953 401.867.953 401.867.953 5.757.457.144 5.757.457.144 5.757.457.144 STOCK DA DIVIDA INTERNA POR CREDOR EM 2008 Milhões de ECV 31-Dez-07 ESTOQUE DA DIVIDA DOMESTICA (A+B) Variação anual do stock da Dívida Interna Variação anual do stock da Dívida Interna em % 27.602,0 (458,8) -1,60% 31-Jan-08 28-Fev-08 31-Mar-08 30-Abr-08 31-Mai-08 Meses 30-Jun-08 31-Jul-08 31-Ago-08 30-Set-08 31-Out-08 30-Nov-08 31-Dez-08 27.450,6 27.692,8 27.490,1 26.788,0 26.438,5 25.761,2 25.624,4 25.637,3 25.550,8 25.947,3 26.010,6 25.103,5 (151,4) -0,5% 242,2 0,9% (202,7) -0,7% (702,0) -2,6% (349,5) -1,3% (677,3) -2,6% (136,8) -0,5% 12,9 0,1% (86,5) -0,3% 396,5 1,6% 63,3 0,2% (907,1) -3,5% A. Sistema Bancário 19.081,5 16.258,0 16.440,2 16.429,1 15.518,1 15.487,3 15.391,2 15.221,1 15.109,0 14.822,5 14.735,2 14.498,5 13.421,4 BCV BCA CECV BCN BIA B. Outros 3.738,5 7.109,5 2.505,9 595,7 2.131,9 11.520,5 3.738,5 7.164,3 2.547,7 660,7 2.146,8 11.192,6 3.738,5 7.040,2 2.553,9 660,7 2.446,9 11.252,6 3.738,5 7.046,2 2.560,2 660,7 2.423,5 11.061,0 3.738,5 6.552,5 2.566,7 660,7 1.999,7 11.269,9 3.738,5 6.558,9 2.570,3 660,7 1.959,0 10.951,2 3.738,5 6.565,3 2.576,5 660,7 1.850,2 10.370,0 3.738,5 6.471,7 2.583,1 660,7 1.767,1 10.403,4 3.738,5 6.477,9 2.589,7 660,7 1.642,2 10.528,4 3.738,5 6.384,7 2.496,3 660,7 1.542,3 10.728,4 3.738,5 6.391,4 2.500,3 660,7 1.444,3 11.212,2 3.738,5 6.147,8 2.507,1 660,7 1.444,4 11.512,2 3.738,5 5.402,9 2.399,8 660,7 1.219,5 11.682,2 INPS GARANTIA CORREIOS CABO VERDE IMPAR PROMOTORA IFH SHELL ELECTRA 9.956,5 0,0 75,0 9.634,7 0,0 50,0 9.694,7 0,0 50,0 9.530,4 0,0 50,0 9.708,9 0,0 100,0 9.694,8 0,0 210,0 9.165,1 0,0 210,0 9.191,3 0,0 160,0 9.366,3 0,0 110,0 9.546,3 0,0 170,0 10.080,1 0,0 120,0 10.390,1 0,0 110,0 10.500,1 20,0 100,0 217,3 0,0 0,0 719,0 552,7 236,2 0,0 0,0 719,0 552,7 236,2 0,0 0,0 719,0 552,7 208,9 0,0 0,0 719,0 552,7 189,3 0,0 0,0 719,0 552,7 134,3 0,0 0,0 359,4 552,7 82,9 0,0 0,0 359,4 552,7 140,0 0,0 0,0 359,4 552,7 140,0 0,0 0,0 359,4 552,7 100,0 0,0 0,0 359,4 552,7 100,0 0,0 0,0 359,4 552,7 100,0 0,0 0,0 359,4 552,7 150,0 0,0 0,0 359,4 552,7 Obs : Montante total de Bilhetes do Tesouro em circulação Protocolo de Conta do Tesouro no BCV Crédito Interno 4.284,9 4.084,9 4.094,9 4.034,9 3.734,9 3.734,9 3.434,9 3.284,9 3.284,9 3.184,9 3.384,9 3.384,9 3.004,9 27.602,0 27.450,6 27.692,8 27.490,1 26.788,0 26.438,5 25.761,2 25.624,4 25.637,3 25.550,8 25.947,3 26.010,6 25.103,5 Resumo do Estoque por Instrumento Sistema Bancário: Total de Bt´s Total de OTNS´s Total Protocolos Outros Créditos 16.081,5 1.273,7 13.969,8 0,0 838,0 16.258,0 16.440,2 16.429,1 15.518,1 15.487,3 15.391,2 15.221,1 15.109,0 14.822,5 14.735,2 14.498,5 13.421,4 1.243,5 14.109,8 1.243,5 14.279,8 1.220,1 14.279,8 581,1 13.994,8 540,2 13.994,8 681,4 13.744,8 498,1 13.744,8 373,1 13.744,8 273,1 13.544,8 239,3 13.480,5 239,3 13.230,5 14,3 12.402,5 Outros: Total de Bt´s Total de OTNS´s Total Protocolos Total Geral: Bilhetes do Tesouro Obrigações do Tesouro Protocolos Outros Créditos PIB %PIB 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 904,7 916,9 929,2 942,2 952,3 965,0 978,2 991,1 1.004,6 1.015,4 1.028,7 1.004,6 11.520,5 3.011,2 7.237,6 1.271,7 11.192,6 2.841,4 7.079,5 1.271,7 11.252,6 2.851,4 7.129,5 1.271,7 11.061,0 2.814,8 6.974,5 1.271,7 11.269,9 3.153,8 6.844,5 1.271,7 10.951,2 3.194,7 6.844,5 912,1 10.370,0 2.753,5 6.704,5 912,1 10.403,4 2.786,8 6.704,5 912,1 10.528,4 2.911,8 6.704,5 912,1 10.728,4 2.911,8 6.904,5 912,1 11.212,2 3.145,6 7.154,5 912,1 11.512,2 3.145,6 7.454,5 912,1 11.682,2 2.990,6 7.779,5 912,1 27.602,0 4.284,9 21.207,4 1.271,7 838,0 111.226,0 24,8 27.450,6 4.084,9 21.189,3 1.271,7 27.692,8 4.094,9 21.409,3 1.271,7 27.490,1 4.034,9 21.254,3 1.271,7 26.788,0 3.734,9 20.839,3 1.271,7 26.438,5 3.734,9 20.839,3 912,1 25.761,2 3.434,9 20.449,3 912,1 25.624,4 3.284,9 20.449,3 912,1 25.637,3 3.284,9 20.449,3 912,1 25.550,8 3.184,9 20.449,3 912,1 25.947,3 3.384,9 20.635,0 912,1 26.010,6 3.384,9 20.685,0 912,1 25.103,5 3.004,9 20.182,0 912,1 904,7 111.226,0 24,7 916,9 111.226,0 24,9 929,2 111.226,0 24,7 942,2 111.226,0 24,1 952,3 111.226,0 23,8 965,0 111.226,0 23,2 978,2 111.226,0 23,0 991,1 1004,6 111.226,0 111.226,0 23,0 23,0 1015,4 111.226,0 23,3 1028,7 111.226,0 23,4 1004,6 111.226,0 22,6 STOCK DA DÍVIDA EXTERNA POR CREDOR 2008 Stock da Dívida Externa Multilateral FAD BM/IDA BADEA BAD BEI OPEC FIDA NDF NTF CEDEAO 2007 Janeiro 08 Fevereiro 08 Março 08 Abril 08 Maio 08 Junho 08 Julho 08 Agosto 08 40.390,53 40.421,64 40.536,81 40.764,63 40.817,40 40.957,21 41.024,08 41.154,43 41.234,60 11.223,05 23.691,60 2.417,95 180,09 887,42 1.239,20 269,06 423,04 59,12 Bilateral Milhões de ECV Setembro 08 Outubro 08 Novembro 08 Dezembro 08 41.507,88 42.272,97 11.199,33 11.209,63 11.211,70 11.185,44 11.185,44 11.185,44 11.138,58 11.143,02 11.167,96 11.165,28 23.746,39 23.776,54 23.852,34 23.839,46 23.887,29 23.934,32 24.016,63 24.042,47 24.233,05 24.993,58 2.377,08 2.437,39 2.451,53 2.521,19 2.595,51 2.584,98 2.647,51 2.652,34 2.708,26 2.708,27 180,09 180,09 180,09 180,09 180,09 180,09 180,09 180,09 180,09 180,09 899,89 918,70 968,92 970,18 973,96 1.004,33 1.025,00 1.070,07 1.070,07 1.090,96 1.267,65 1.256,97 1.256,97 1.289,74 1.289,74 1.289,74 1.289,74 1.289,74 1.278,30 1.278,30 269,06 269,06 269,06 269,06 266,61 266,61 266,61 266,61 266,61 266,61 423,04 423,04 423,04 409,76 409,76 409,76 409,76 409,76 409,76 395,07 59,12 65,39 150,98 152,49 168,81 168,81 180,51 180,51 193,79 194,80 42.308,40 42.247,69 11.165,28 24.983,05 2.766,46 180,09 1.077,06 1.278,30 263,77 395,07 199,31 11.134,86 25.111,85 2.707,55 76,35 1.080,63 1.278,30 263,77 395,07 199,31 8.273,27 8.324,88 8.238,80 8.178,05 8.142,27 8.083,18 8.155,23 8.557,15 8.617,53 9.522,19 9.590,94 9.582,52 9.632,48 5.608,16 5.660,47 5.575,09 5.575,69 5.661,53 5.640,65 5.729,06 6.128,01 6.189,12 7.174,37 7.347,42 7.348,78 7.375,08 862,78 4.665,05 80,32 915,09 4.665,05 80,32 887,27 4.607,50 80,32 887,87 4.607,50 80,32 887,87 4.693,34 80,32 887,87 4.672,46 80,32 889,43 4.759,30 80,32 910,76 5.136,92 80,32 910,76 5.198,04 80,32 880,78 6.213,27 80,32 880,78 6.386,32 80,32 882,14 6.386,32 80,32 882,14 6.412,61 80,32 1.056,15 1.056,15 1.056,15 1.050,81 1.054,43 1.054,43 1.038,79 1.042,50 1.042,50 1.017,94 1.038,91 1.067,38 1.091,79 ICO (Espanha) CACEX 767,50 288,65 767,50 288,65 767,50 288,65 762,16 288,65 765,78 288,65 765,78 288,65 750,14 288,65 753,85 288,65 753,85 288,65 729,29 288,65 750,26 288,65 778,73 288,65 803,14 288,65 Private Companies 1.608,96 1.608,26 1.607,56 1.551,55 1.426,31 1.388,10 1.387,38 1.386,65 1.385,92 1.329,88 1.204,61 1.166,37 1.165,61 Banco Esperito Santos Caixa Geral Déposito KFW 899,99 179,42 529,55 899,99 178,72 529,55 899,99 178,01 529,55 899,99 177,31 474,25 775,47 176,59 474,25 775,47 138,38 474,25 775,47 137,66 474,25 775,47 136,93 474,25 775,47 136,20 474,25 775,47 135,46 418,96 650,94 134,71 418,96 650,94 96,47 418,96 650,94 95,72 418,96 48.775,60 48.942,69 48.959,67 49.040,39 49.179,31 49.711,58 49.852,14 51.030,08 51.863,91 51.890,92 51.880,16 Government China Kuwait Portugal Belgica Export credit agencies Total do Estoque da Dívida Externa 48.663,80 PIB %PIB 115.659,37 42,08 Fonte: DSOF 48.746,52 127.225,31 127.225,31 127.225,31 127.225,31 127.225,31 127.225,31 127.225,31 127.225,31 127.225,31 127.225,31 127.225,31 127.225,31 38,32 38,34 38,47 38,48 38,55 38,66 39,07 39,18 40,11 40,77 40,79 40,78 Millennium Challenge Account – Cabo Verde CONSELHO COORDENADOR ATTACHMENT E Annual Detailed Plan Estamos a construir o futuro We are building the future Nu sta construi futuru WATERSHED MANAGEMENT AND AGRICULTURE SUPPORT PROJECT WORK PLAN OCTOBER 2009 – SEPTEMBER 2010 I. Executive Summary Watershed Management and Agriculture Support Project (WMASP) aims at improving life quality of the population, through a sustainable management of natural resources, to reduce poverty and promote sustainable economic growth in the rural areas. This program is designed to increase agricultural productivity in three rural intervention watershed areas: Rª Paul on the island on Santo Antão; Mosteiros on the island of Fogo; and Rª Fajã on the island of São Nicolau. The WMASP includes the following three project activities: • Water Management and Soil Conservation: Development of water management infrastructure to slow runoff, captures water in reservoirs, and re-charges aquifers. • Agribusiness Development Services: Establishment of demonstration farms, extension training centers and technical assistance targeted to farmers, small agribusinesses and local municipalities and support of processing and marketing efforts, including addressing the impact of pests by building institutional capacity to implement sanitary and phyto-sanitary regulations, and establishing an inspection and certification center and an applied research center. • Access to Credit: Provision of credit for drip irrigation, working capital and agribusiness investments and technical assistance to increase the capacity of financial institutions in the provision of financial services. During the period of this work plan the following activities will be developed in all three intervention areas: Water Management and Soil Conservation: Contracts signed for construction of torrential control dikes, dikes to capture subsurface runoff, wells drilled, water reservoirs, water distribution systems, pumping stations, and small dikes will be completed and contracts closed - out. Community Water Management Plans will be completely implemented. Water will start to be delivered to farmers for horticulture and fruit production. Agribusiness Development Services: Agland International Services, Inc. will continue to deliver as foreseen in the contract signed namely: training extension workers and farmers, install drip irrigation systems, identify farmers interested in drip irrigation, produce cost estimates for drip irrigation systems, produce brochures in 5 core disciplines, deliver the construction project for the Pos Harvest Center in Fajã, S.Nicolau, implement the market information system and support in making the Post Harvest Center in Porto Novo, S.Antão operational. The Post Harvest Center in Porto Novo, S.Antão will be built and equipped and the embargo to agriculture products in S.Antão will be lifted. Access to Credit: There will be an intensification of the credit activities with the signature of more Mater Loan Agreements between CECV and Micro Finance Institutions and the consequent delivery of credit to farmers and other beneficiaries. The evaluations of IMF to concur for the grant will take place. The second tranche of 250.000 USD$ will be disbursed to CECV. Project Support activities: Several project support activities will be developed namely: o o o o o o o o o Assist and accompany activities of Monitoring and Evaluation such as analysis of the data from the agriculture cyclic survey, the establishment of water monitoring system, the implementation of the Community Based Water Management Plans; Accompany Environment impact management activities in the three intervention areas; Assist in the preparation of condition precedents; Monthly coordination meetings with the Central Coordination team of the Implementing Entity (IE); Quarterly visits to intervention areas; Quarterly held Technical Forums; Launch bid for the equipments for the Pos Harvest Center in Porto Novo, S.Antão; Help create the conditions for the management of the PHC; Assist IE/MADRRM, in the execution of the Water Distribution Systems in Mosteiros and Fajã. Emerging risks and proposed mitigating measures: o Due to Contractor weakness some contracts were terminated in Fogo and S.Nicolau, new contracts were signed to help mitigate eventual delays, technical assistance was hired to assist IE/MADRR in the supervision of the works; therefore we have now two part – time rural and hydraulic engineers. II. Introduction to the Work Plan 1. Program overview The fragility of our ecosystem and scarce natural resources requires a continuous intervention in the process to find solutions to increase agriculture production and productivity. Program activities began in October 2005, with activities leading to fulfill condition precedents without which Soil Conservation and Water Management (SCWM) could not start. After fulfilling several Conditions Precedents to allow for the start of the activities additional others were complied with namely: 1) Community Based Water Management Plans for Mosteiros, Fajã and Paul – prepared and submitted to MCC approval; 2) Water fee system – approved by CNAG; 3) Post harvest Center – Privatization Plan – prepared and approved by MCC; 4) Credit wholesale Institution selected with MCC no – objection; 5) Agriculture cyclic survey, in the field since May 2008. The construction of infra structures for water harvesting mobilization and storage, water distribution systems and water management planned in this program will certainly minimize the negative effects of periodic cyclic droughts and contribute to improve socio – economic conditions of the rural communities benefited. The SCWM infra structures such as torrential correction dikes, dikes to capture subsurface runoff, and reservoirs to store water harvested at higher altitudes are located in areas of dry – land agriculture production, the construction of most of the contracts will be finished in July – August in time for the rainy season. In S. Nicolau 3 contracts were re – signed, the water systems construction will take longer, but they are expected to be finished by December 09, and consequently not at time to receive water from this rainy season. All systems will have their water distribution systems implemented including the systems supplied by two production wells in Paul which will be finished By August 2009. All these works will allow the starting of horticulture production in 2009. Even without all the infrastructures finished water is already available and some farmers are already accessing credit in all the three intervention areas since, condition exist to start the installation of irrigated areas with drip irrigation systems or any other water saving system. During the year 2009 – 2010 all Water Distribution Systems will be executed including the ones financed by IE/MADRRM, the Post Harvest Center will be built and Equipped and start functioning, a considerable number of farmers will be trained farmers, the Market Information System will be implemented in all three intervention areas, and all 450.000 UDS$ will have been disbursed to CECV. Works on millipede research will continue and the lifting of embargo will most probably happen by July 2010. Two Pilot Committee will be established by IE/MADRRM to approach: 1) Market Access issues, and 2) Lifting Embargo issues. 2. Implementation entities or partners The Ministry of Environment Rural Development and Marine Resources is the Implementing Entity and is responsible for implementing and monitoring, as appropriate, the WMASP consisting of: o Watershed Management Activity, o Agribusiness Development Activity and o Credit Activity as it relates only to DGPOG’s role in the provision of training and technical assistance to the credit recipients and any follow-up to the credit portfolio during the loan cycles. Within the IE we have important partners namely: INGRH (Water Management Institute) – who will be monitoring water in the three watersheds, INIDA (Agriculture Research Institute) – who will be doing research and working with rural extension in the transfer of technologies and DGA (Environment Department) – who will be helping Environmental monitoring. All WMSC works will be supervised by MAA Delegations and DGASP (Agriculture Direction General). The Municipalities and the Community Based Associations in all three intervention areas are project partners. One technician from each one of the Municipalities is responsible to monitor environment at local level in collaboration with the EI (MAA) Local Coordination Team. We are also doing some donor coordination meeting with ICASE, FAO and University of Cape Verde. Some partnerships such as ICIPE are being built as to support INIDA with millipede research. 3. Organizational structure The Implementing Entity has established a three-tier structure to implement the WMAS Project that allows for the planning, execution and monitoring of the Watershed Project Activities at various levels, as well as data collection, reporting and decision-making in an efficient and flexible manner. o o o The first tier consists of three “Local Coordination Units,” each responsible for executing the Implementing Entity’s duties at the local level in the respective Watershed Area. The second is the “Central Coordination Unit” responsible for providing centralized technical supervision to the three Local Coordination Units. The third is the “Follow-up Committee” responsible for providing general coordination and monitoring of the WMAS Project See the organizational chart that follows. IMPLEMENTATION STRUCTURE CHART MINISTRY OF ENVIRONMENT AND AGRICULTURE TECHNICAL TEAM FOR THE EXECUTION OF WATERSHED MANAGEMENT AND AGRICULTURE SUPPORT PROJECT MCA – Cape Verde Management Unit Follow Up Committee DGASP DGA Central Coordination DGPOG INIDA INGRH Community Based Association Municipalities Principal Coordinator DGPOG M&E Cellule DGASP DGA INIDA INGRH Administrative Staff (office; driver) Local Coordination B. H. Paúl (S.Antão) MAAP – Delegate (Coordinator) M&E Technician Extension worker Rural Engineering Environmentalist (from Municipality) B. H. Fajã (S.Nicolau) MAAP – Delegate (Coordinator) M&E Technician Extension worker Rural Engineering Environmentalist (from Municipality) Mosteiros (Fogo) MAAP – Delegate (Coordinator) M&E Technician Extension worker Rural Engineering Environmentalist (from Municipality) 4. Program logic PROGRAM VISION A sustainable agriculture, having watershed management as management unit through which natural resources are valued and their productive capacity oriented towards decreasing poverty and assuring basic food security to the communities. PROGRAM OBJECTIVE Increased agriculture production in the intervention areas The WMASP is focused on removing constraints to agricultural productivity and is designed to improve the management of critical water resources and to mobilize key agricultural support activities (research, extension and credit) that will enable rural agricultural producers to improve their environment, increase their productivity, and raise their incomes. Specific objectives: Sustainable soil and water management With an improved supply of water for a longer period of time, farmers will be able to switch from producing low-value grains and beans to higher-value horticultural and fruitculture products, thereby increasing their incomes. Develop productive capacity in the intervention areas and increase value added to horticulture and fruticulture production Farmers in the Watershed Areas will benefit from increased access to water as well as through training and extension opportunities, capacity building activities (training and technical assistance).The WMAS Project Activities complement the country’s strategic goal of developing the tourism sector, which, in turn, is expected to create demand for increased production of domestic horticulture and fruitculture products, also leading to an increase in food security. Increased financial capacity of farmers Through the Credit Activity, credit will be made available to enable farmers to finance drip irrigation, promote the conversion to horticultural products on newly irrigated land, and support postharvest agribusinesses in the Watershed Areas. The WMAS Project is consistent with the approaches set out in Growth and Poverty Reduction Strategic Plan, for achieving the goal of sustainable rural economic growth, e.g., organization of watersheds and water management, promotion of rural financial services, applied research, and dissemination of new varieties of agricultural products. As initially foreseen the WMAP would l contribute in the intervention areas to increase area under drip irrigation from an actual estimated average of 9 hectares to 121 hectares, however due to several constraints namely: delays in the start of the project implementation, problems with contractor by the end of this period we now estimated to have 36 hectares under drip irrigation. An increase will take place and can reach the initial 121 hectares foreseen but will happen outside the project timeframe. From the surface catchments an established capacity of 17.000 m3 will be available and from the wells 180.000 m3, between 160 – 180 credit beneficiaries and the Post Harvest Centers in Porto Novo, S.Antão will be supporting farmers to reach market in better conditions. Water mobilization, harvesting, wells and distribution e Armazenamento de Água Agriculture inputs Produção Water distribution for irrigation Water harvesting Water Reservoirs Captation dikes Torrential control dikes Credit Better quality seed; Planting material: Fertilizers; Others Water distribution systems; Increased adoption rate of drip irrigation; Fertilizer use in irrigation water; Soil Conservation and land tenure Increased Production Rural extension Research Packing, conservation, quality, transformation, inspection, marketing PORT PROJECT WORK PLAN OCTOBER 2009 – SEPTEMBER 2010 I. Executive Summary The present Work Plan addresses the Project Activities that comprise MCA-CV Port of Praia Project. It covers the period from October 2009 to September 2010 (that is Q17 to Q20) and it is a narrative of the activities to be carried out during the stated period to achieve the targets established for each project activity, using the resources allocated for each one of them. II. Introduction to the Work Plan 1. Project Overview The Port of Praia Project as designed in the Compact includes the following components: 1. Preparatory Studies and design for Phase 1 Works; 2. Preparatory Studies and Design for Phase 2 Works; 3. Phase 1 Works (Quay 2 Rehabilitation, New Connecting Road and Cargo Village); 4. Phase 2 Works (Container Yard and Quay 1 Extension); 5. Project Management Consultancy. During the project execution mainly due to fund insufficiency, some of previous components were deleted from the project, namely the Phase 2 works plus the breakwater. The Phase 1 studies which have provided all technical information needed for the design and for construction activities under Phase 1 Works were concluded in March 2008 and the bid for Phase 1 works were launched at that time. The Phase 2 studies also were concluded in December 2008 providing all technical documents needed for the Phase 2 Construction, which will be tender under other donor fund project in June – July 2009. 1.1. Phase 1 Works The works of Phase 1 includes the construction of 2.2 Km New Connecting Road with 500 m reclaimed from the sea, a 14 hectares Cargo Village and the Rehabilitation of the Quay 2 Complex. The tables below reflect the main activities for each Phase 1 components according to the Contract: SUMMARY OF REHABILITATION OF QUAY 2 COMPLEX: Item Description Unit price (USD) 1. SCHEDULE OF PRICE, DRAWING AND DOCUMENTATION 219.593,20 2. CIVIL WORKS 9.658.107,89 3. ELECTRICAL AND MECHANICAL WORKS 1.703.684,29 TOTAL Rehabilitation of Quay 2: 11.581.385,38 SUMMARY OF CONNECTING ROAD Item MOBILIZATION / DEMOBILIZATION Amount (USD) 832.256,19 SERIES 1000 : EARTHWORKS 1.156.244,21 SERIES 2000 : PAVEMENT LAYERS 2.105.529,85 SERIES 3000 : DRAINAGE 462.806,88 SERIES 4000 : ROAD FURNITURE 654.115,80 SERIES 5000 : SHORE PROTECTION 4.515.658,30 TOTAL CONNECTING ROAD 9.726.611,23 SUMMARY OF CARGO VILLAGE Item Amount USD SERIES 0000 : MOBILIZATION AND DEMOBILIZATION 3.670.021,66 SERIES 1000 : EARTHWORKS 2.773.858,54 SERIES 2000 : PAVEMENT AND ROAD EQUIPMENT 5.353.123,21 SERIES 3000 : STORMWATER DRAINAGE SYSTEM 1.385.762,75 SERIES 4000 : WATER SUPPLY AND FIRE FIGHTING 630.397,31 SERIES 5000 : SEWAGE SYSTEM 555.054,20 SERIES 6000 : POWER SUPPLY AND LIGHTING 3.713.251,55 SERIES 7000 : SECURITY EQUIPMENT 1.691.904,33 SERIES 8000 : EXTRA LOW VOLTAGE NETWORKS 235.003,88 SERIES 9000 : LANDSCAPING 224.359,06 TOTAL CARGO VILLAGE 20.232.736,49 1.2. Project Management Consultant 2. Project Implementation 2.1. Phase 1 Works The Contract for Phase 1 Works was celebrated on July 30, 2008 the commencement date was fixed on September 12, 2008. At this point of time all 3 components are in progress, the tables below show the overall contract progress and the main contract activities progress by the end of April. MILLENNIUM CHALLENGE ACCOUNT - CABO VERDE PORT OF PRAIA EXPANSION AND MODERNIZATION PROJECT - PHASE 1 OVERALL - GENERAL WORKS SUMMARY - April 2009 Amount Item Contracted $USD Updated considering VO n.1 $USD Cumulative Amount $USD Percentage ( %) QUAY nº 2 COMPLEX 11.581.385,38 11.581.385,38 2.236.084,07 19,31% CONNECTING ROAD 9.726.611,23 10.289.408,98 3.706.806,04 36,03% CARGO VILLAGE 20.232.736,49 20.232.736,49 3.594.299,53 17,76% HIV-AIDS PREVENTION PLAN 46.500,00 46.500,00 16.856,25 36,25% CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN-CEMP 734.855,00 734.855,00 313.231,95 42,63% 42.322.088,10 42.884.885,85 9.867.277,84 23,01% TOTAL MILLENNIUM CHALLENGE ACCOUNT - CABO VERDE PORT OF PRAIA EXPANSION AND MODERNIZATION PROJECT - PHASE 1 QUAY 2 COMPLEX - GENERAL WORKS SUMMARY - April 2009 Amount Item Contracted $USD Cumulative Amount $USD Percentage ( %) 219.593,20 219.593,20 100,00% 1.642.292,65 985.375,59 60,00% 610.652,80 416.033,76 68,13% 7.405.162,44 536.275,48 7,24% ELECTRICAL AND MECHANICAL 1.703.684,29 78.806,04 4,63% TOTAL QUAY 2 COMPLEX 11.581.385,38 2.236.084,07 19,31% DESIGN MOBILIZATION AND DEMOBILIZATION DEMOLITION AND CLEARING CIVIL WORKS MILLENNIUM CHALLENGE ACCOUNT - CABO VERDE PORT OF PRAIA EXPANSION AND MODERNIZATION PROJECT - PHASE 1 CONNECTING ROAD - GENERAL WORKS - INCLUDING VARIATION No.1 SUMMARY - April 2009 Amount Contracted $USD Updated considering VO n.1 $USD Cumulative Amount $USD Percentage (%) 832.256,19 832.256,19 450.575,59 54,14% SERIES 1000 : EARTHWORKS 1.156.244,21 1.177.676,21 438.912,81 37,27% SERIES 2000 : PAVEMENT LAYERS 2.105.529,85 2.105.529,85 107.759,94 5,12% SERIES 3000 : DRAINAGE 462.806,88 462.806,88 SERIES 4000 : ROAD FURNITURE 654.115,80 654.115,80 SERIES 5000 : SHORE-PROTECTION 4.515.658,30 5.057.024,05 2.709.557,71 53,58% TOTAL CONNECTING ROAD 9.726.611,23 10.289.408,98 3.706.806,04 36,03% Item MOBILIZATION AND DEMOBILIZATION MILLENNIUM CHALLENGE ACCOUNT - CABO VERDE PORT OF PRAIA EXPANSION AND MODERNIZATION PROJECT - PHASE 1 CARGO VILLAGE - GENERAL WORKS SUMMARY - April 2009 Amount Item Contracted $USD Cumulative Amount $USD Percentage ( %) SERIES 0000 : MOBILIZATION AND DEMOBILIZATION 3.670.021,66 2.123.756,35 57,87% SERIES 1000 : EARTHWORKS 2.773.858,54 1.278.586,12 46,09% SERIES 2000 : PAVEMENT AND ROAD EQUIPMENT 5.353.123,21 SERIES 3000 : STORMWATER DRAINAGE SYSTEM 1.385.762,75 191.957,06 13,85% 3.594.299,53 17,76% SERIES 4000 : WATER SUPPLY AND FIRE FIGHTING 630.397,31 SERIES 5000 : SEWAGE SYSTEM 555.054,20 SERIES 6000 : POWER SUPPLY AND LIGHTING 3.713.251,55 SERIES 7000 : SECURITY EQUIPMENT 1.691.904,33 SERIES 8000 : EXTRA LOW VOLTAGE NETWORKS 235.003,88 SERIES 9000 : LANDSCAPING 224.359,06 TOTAL CARGO VILLAGE 20.232.736,49 2.2 Phase 2 works By the end of May the PMC has submitted the following reports: DOCUMENT SUBMISSION DATE AMOUNT Inception Report 08.05.2008 144.653,03 USD Evaluation Report Contract 1 25.06.2008 32.145,12 USD Evaluation Report for Draft Design and Bidding Documents for Contract 2 15.09.2008 32,145.12 USD 1st Monthly Report - September 2008 01.10.2008 107,686.16 USD Evaluation Report for Final Design and Bidding Documents for Contract 2 31.10.2008 32.145,12 USD 2nd Monthly Report - October 2008 03.11.2008 107.686,20 USD 3rd Monthly Report - November 2008 04.12.2008 107.686,20 USD 4th Monthly Report - December 2008 12.02.2009 107.686,20 USD 5th Monthly Report - January 2009 18.02.2009 107,686.20 USD Mobilization Report 18.11.2008 Mobilization Report – finalrevision 12.02.2009 112,507.91 USD 6th Monthly Report - February 2009 12.03.2009 107,686.20 USD 7th Monthly Report - March 2009 12.04.2009 107,686.20 USD 8h Monthly Report – April 2009 25.05.2009 107,686.20 USD 3. Implementing Entity The PPP is under direct coordination of the PPP´s Project Manger of MCA-CV Management Unit. The implementing entity for the PPP is the Ministry of Infrastructure and Transportation and is represented by ENAPOR (Cape Verde Port Authority). For this purpose ENAPOR has set up a management unit with a project manager, a civil engineer and an environment specialist. 4. Organizational Structure MIT (Implementing Entity) MCA - CV ENAPOR Studies Procurement Supervision Consultant Monitoring & Evaluation Works Management Contractors Port Operations Environment III. PPP Detailed Budget The detailed budget for the Port of Praia Project is presented below: The payment schedule for Phase 1 Works during the 5th year of the Compact is presented below: Quarter Quarter Amount USD Q 17 4,838,196 Q 18 5,097,517 Q 19 9,023,420 Q 20 10,954,631 In this projection it is included the use of the contingencies basically in the two last quarters of the year. The payment schedule for the Project Management Consultant during the 5th year of the Compact is presented below: Quarter Quarter Amount USD Q 17 323.058,44 Q 18 374,491 Q 19 323.058,44 Q 20 655,760 IV. The Work Plan Project Name: Port of Praia Project Contract Q 17 Component Cargo Village Q 18 Q 19 Q 20 Completion date Jun-10 Connecting Road Feb 2010 Works of Phasde 1 Quay 2 Complex Total Works Project Management Consultant TOTAL ORT OF PRAIA PROJECT Sep 2010 Amount Progress Progress Amount 4.496.643,94 4.754.165,23 5.599.750,94 4.898.646,59 Sep 2010 Oct 2010 323.058,4 323.058,4 323.058,4 323.058,4 4.819.702,38 5.077.223,67 5.922.809,38 5.221.705,03 Oct 2010 V. PPP Monitoring and Evaluation Plan Project Activity Indicator Level Objectives Indicator Port of Praia: Percent of contracted works disbursed (cumulative) Infrastructure Project Port Activity Output Indicator Cargo Village: Percent of works Improve the Fixed Assets completed (cumulative) of the Port of Praia Quay 2 Improvements: Percent of works completed (cumulative) Access Road: Percent of works completed (cumulative) Target Y[5] (Oct09 - Sep10) Baseline Target Q1 to Q20 (Oct05-Sep10) 0% 100% 100% 0 39% 100% 0 44% 100% 0 53% 100% PRIVATE SECTOR DEVELOPMENT PROJECT WORK PLAN OCTOBER 2009 – SEPTEMBER 2010 I. Executive Summary This Work Plan addresses the details regarding the implementation of the following three project activities that compose the MCA-CV Private Sector Development Project: A. Partnership to Mobilize Investment (i) Project Activity: Creation of a Credit Information Bureau; B. Financial Sector Reform (ii) Project Activity: Development of the Market for Government Securities (iii) Project Activity: Development of Microfinance Institutions The timeframe to implement this Work Plan is one year - from October 2009 to September 2010. II. The Work Plan Overview The Work Plan is in line with the Private Sector Development Project (PSDP) two main goals of (i) removing constraints to private sector investment and (ii) achieving reforms in the financial sector to help increase access to financial services and expand access to the primary market for government securities. The first main goal will be accomplished through the provision of technical assistance services to support the development and creation of a private Credit Information Bureau. The provision of these assistance services - commissioned to the IFC late in January 2009 - is in progress since March 2009 and should be concluded in July 2010. The second main goal will be accomplished through the implementation of an Action Plan to develop the market for Government securities and of a technical assistance services to support the institutional reinforcement of microfinance institutions. Execution of both project activities is in progress, the first being coordinated by the Ministry of Finance and the second by the Chambers of Commerce. Project Activity Description Creation of a Credit Information Bureau This project activity aim is to support the key stakeholders in Cape Verde in the development of a viable and sustainable first class Private Credit Information Bureau. Since early March of this year, the IFC is undertaking the technical assistance assignment and has adopted a phased-approach in the implementation of this project activity, which consists of: Phase I-Activity: Phase II-Activity: Phase III-Activity: Preliminary assessment mission and report Assessment, legal review, recommendations report Bidding documents and advice on process and vendor selection Phase IV-Activity: Outreach and awareness rising Provided that the activities are accomplished on schedule, the Work Plan scope includes part of the activities for Phase III and all activities for Phase IV. Some of the activities above, particularly under Phase IV, will be implemented concurrently. Implementation of the project activity is assured by the Chambers of Commerce, with the technical of a Working Group composed of staff from most of the financial institutions and other relevant stakeholders. Development of Microfinance Institutions The overall objective of this project activity is to strengthen the microfinance institutions so that they can offer quality, sustainable services to micro and small entrepreneurs and farmers in Cape Verde. The specific goal is to assist the MFI sector to become operationally and financially sustainable. Planet Finance has been engaged to execute the project activities from June 2008 to June 2010. Planet´s assignment is to assist MFIs to take advantage of expanded deposit-taking powers and to ease the transition to a new regulatory environment (e.g., defining governance structure and institutional policies, design and pricing of liability products, asset- liability management and tracking, marketing, and regulatory reporting requirements, provision of software to support the record-keeping associated with those deposit-taking powers). The project activity has been implemented under a joint coordination by the MCA-CV and the Federation of MIF (FAM-F). Development of the Market for Government Securities The project activity objective is to develop and implement legal, regulatory and institutional changes in the market for government securities. The changes derived from the technical assistance should contribute objectively to the attainment of the targets established for this project activity with regards to progressive increases of private ownership of Government securities outstanding in the market. The Ministry of Finance has been coordinating the implementation of the activities, as defined and scheduled in an Action Plan. III. Work Plan Detailed Budget Creation of a Credit Information Bureau Development and creation of the Bureau Budget (Oct´09-Set´09) Technical Assistance Services to the Ministry of Finance (IFC) Phase III - Bidding documents and vendor selection Phase IV - Outreach and awareness raising $US74,125 $US44,475 Financial support to the Chambers to invest in the Bureau Total Work Plan Budget $US250,000 $US368,600 Development of Microfinance Institutions: Technical Assistance and Training Technical Assistance Services to the MFIs (Planet Finance) Quarter 6 Progress Report (including M&E Report) Performance results of the MFIs that succeeded in getting loans from commercial banks. Training Action Plan to Group 2 MFI´s concluded successfully Budget (Oct´09-Set´09) $US108,500 Quarter 7 Progress Report (including M&E Report) Document results achieved in Marketing and Customer Service 90% of Action Plan technical assistance to selected MFI’s completed and recommendations being successfully implemented. 4 selected MFIs are “operationally and financially sustainable $US108,500 Final Report (Refer to the details in the TOR as well as to Annex 1 to the same TOR) Report on results achieved with assistance to MFIs on savings program. Acquisition and installation of new software for IMFs Total Work Plan Budget $US108,500 $US125,000 $US 450,000 Development of the Market for Government Securities: Financial Support to the Ministry of Finance Support the Ministry of Finance to by and install a new ITC platform /software, to manage securities transactions Total Work Plan Budget Budget (Oct´09-Set´09) $US200,000 $US200,000 IV. The Work Plan Project Name: Private Sector Development Project Project Objective: Support Cape Verde´s Economic Transformation Strategy Project Partnership to Mobilize Investment Project Objective Project Activities Creation of a Credit Information Bureau Broaden access to financial services, particularly for the less served segments of the population (e.g. informal economy, consumers, and micro entrepreneurs). MFI´s Development Increase Financial Intermediation Phase III Activity: Bidding documents and advice on process and vendor selection Phase IV-Activity: Outreach and awareness rising Duration Q17 O-D Q18 J-M Q19 A-J X X X X X 10 months 4 months Quarter 6 Progress Report (including M&E Report) X Procurement of file server for MFIs X Quarter 7 Progress Report (including X M&E Report) Financial Sector Reform Government Securities Increase Competition in the Government Securities Market Final Report (Refer to the details in the TOR as well as to Annex 1 to the same TOR) and Report on results achieved with assistance to MFIs on savings program. Support the Ministry of Finance to buy and install a new ITC platform /software, to manage securities transactions Q20 J-S X X 4 months x X Budget $USD Responsibility IFC and Chambers of Commerce $318,600 IFC-Chambers of Commerce MCA-CV Planet Finance $108,500 Planet Finance IFC-Chambers of Commerce MCA-CV MCA-CV $125,000 Planet Finance, FAM-F and MCA-CV Planet Finance $108,500 Planet Finance Planet Finance $108,500 Planet Finance MCA-CV and Ministry of Finance $200,000 Ministry Finance of V. PSDP Monitoring and Evaluation Plan 1. Performance Indicators Project Activities Objective Partnership to Mobilize Investment Baseline Target Year 5 CIB - Broaden access Number of Private Credit Bureau Developed 0 1 Increase financial Intermediation Gross Loan Portfolio Gross Loan Portfolio, Adjusted Portfolio at Risk Aging of Portfolio Operational Self-Sufficiency Financial Self-Sufficiency (adjusted) 223.101 CVE 152,528 CVE 16% TBD 0 MFI 0 MFI 323,000 CVE 222,000 CVE 14% TBD 3 MFIs 4 MFIs Increase competition in the government securities market Percentage of government security stock held outside of financial institutions and government agencies 0,61% 2% to financial services, particularly for the less served segments of the population e.g. informal economy, consumers, and micro entrepreneurs). Financial Sector Reform VI. Indicators PSDP Procurement Plan Prepared Short List Conclusion of Negotiations and Contract Prepared Project Activity/Procurement Initial Date CIB – International Tender for selection a vendor Development of MFI´s August 2009 July 2009 December 2010 Government Securities- ICT platform/software July 2009 October 20009 October 2009 Effective Date of Contract Start of Work Completion Date MONITORING AND EVALUATION WORK PLAN OCTOBER 2009 – SEPTEMBER 2010 1 I. Executive Summary The present Work Plan addresses the Project Activities that comprise MCA-CV Monitoring and Evaluation. It covers the period from October 2009 to September 2010 (that is Q17 to Q20) and it is a narrative of the activities to be carried out during the stated period to achieve the targets established for each project activity, using the resources allocated for each one of them. II. Introduction to the Work Plan 1. Project Overview The work plan is in line with MCA-CV Program goal of economic growth and poverty reduction, to achieve the following objectives: (i) increase agricultural production in three intervention zones, (ii) increase integration of the internal market and reduce transportation costs, and (iii) develop the private sector. A focus on results is a founding principle and cornerstone of MCC assistance. Monitoring and Evaluation (M&E) is essential for a results-based approach to program management. M&E was a key component of program design and remains incorporated into all facets of the program cycle through program close-out. 2. Project Activity Description Monitoring Component Project and Activity performance will be monitored regularly through the indicator tracking system. This analysis allows managers of MCA-CV and MCC to make programmatic adjustments as necessary with the view towards improving the overall impact of the Program. The Detailed M&E Project Plan will be revisited annually and include targets on a twelve month rolling calendar. Indicators Project Objectives and Project Activity Outcomes will be measured by indicators. The Indicator Definition Tables that are attached to the body of the M&E Plan provide a detailed definition of each indicator; unit of measurement; source of data; method of data 2 collection; frequency of data collection; and the entity responsible for gathering the data. Compact Goal Indicators, Project Objective Indicators and Project Activity Outcome Indicators identified in the tables contained in Compact Annex III are included in the M&E Plan. Additional indicators, including Process Milestone indicators, have been added to the M&E Plan as a result of greater definition of the Project Work Plans. Over the life of the Program, the indicators in the M&E Plan may be further expanded or in some exceptional cases reduced, with the mutual agreement of MCA-CV and MCC. Baselines and Targets for Performance The baselines and targets for each indicator are shown in the Performance Tracking Tables which are presented after the Indicator Definition Tables in Attachment 3. Pending baselines and targets will be set prior to initiation of the corresponding Project Activities. They are subject to revision during Compact implementation with the mutual agreement of MCA-CV and MCC. The agreed upon deadlines for setting the outstanding baselines and targets are shown in the following table. Evaluation Component Effective management for results requires the regular collection, review and use of performance information. Impact evaluations seek to determine whether project activities have had the desired effects on intended direct beneficiaries; i.e., individuals, households and/or institutions, and whether those effects can be attributed to project interventions. One of the key features of the MCC’s approach to development assistance is its strong commitment to conducting rigorous impact evaluations of its programs, and to use, whenever possible, methodologies that determine whether results can be reliably attributed to MCC interventions. Evaluation also improves program management and provides lessons for program implementation in the future. Consequently, evaluation will be an essential element of the MCA-Cape Verde Program. Final Impact Evaluations The Program will be evaluated on the extent to which the interventions contribute to the Compact Goal of “Increasing Economic Growth and Reducing Poverty.” MCA-CV, with the prior written approval of MCC, will contract independent evaluators to conduct final impact evaluations. The cost of the final impact evaluations will be jointly financed by the MCA-CV M&E budget and MCC impact evaluation budget. The Final Impact Evaluations must at a minimum address the following: Why goals, objectives and targets were or were not achieved Positive and negative unintended results of the program 3 Effectiveness of program activities and establish whether results can be attributed to MCC interventions Lessons learned and best practices in project implementation Comparative analysis of projected versus final economic rates of return on selected Projects The envisioned approaches to impact evaluations for each of the Project Activities are described below. This part of the M&E Plan will be further developed by MCC and MCA-CV staff. 3. Implementing Entities The M&E is under direct coordination of the M&E´s of MCA-CV Management Unit. The MCA-CV-M&E has selected two different implementing entities: the National Statistical Institute (INE) will implement Project Activity “Agricultural Surveys and Port Surveys” and the NOSI will implement the Project Activity “Management Information System”. 4. Organizational Structure 4 5. Project Logic The Cape Verde Compact identifies monitoring and evaluation analysis at five levels, including Program or Compact Goal, Project Objectives, Project Activity Outcomes, Project Activity Outputs, and Process Milestones. Cape Verde expects to achieve specific results on these levels. Those results with their appropriate level designations are shown below. Compact Goal Economic Growth and Poverty Reduction Increased Agricultural Productivity in the Intervention Areas Project Objectives Sustainable Watershed Management Increased Integration of Internal Markets and Reduced Transport Costs Increased Efficiency of the Port of Praia Improved Rural Transport Network Developed Private Sector Increased Financial Intermediation Increased Productive Capacity of Participants Project Activity Outcomes Increased Competition in the Government Securities Market Increased Marketing of Agricultural Products Increased Financial Capacity of Participants Figure 1 - Compacts Results Chain The achievement of these results will be measured through specific indicators discussed under the Monitoring Component. The Compact Goal Indicator (increase in annual income) is estimated by aggregating the expected benefits of the three projects 1. This is indicative of the overall impact expected from all of the Project Activities. While these benefits can be estimated, it is difficult to attribute changes in income specifically to interventions undertaken by the Cape Verde MCA Program. This is because other factors, unrelated to the Program, may affect income changes. Therefore, it is not a requirement that MCA-CV monitor and report on the Compact Goal Indicator throughout the life of the Compact. However, these estimated benefits should be used to inform impact evaluation. 1 These estimates come directly from the benefit streams used in the economic rate of return (ERR) analysis discussed in Section 5: Economic Analysis, Assumptions and Risks. 5 III. M&E Detailed Budget 1. Monitoring Component: $1,180,374.58 is the total budget, which is allocated to the sub-activity, as follows: MONITORING COMPONENT $1,180,374.58 Implementing of Surveys MCA-CV/INE 329,747 GIS database phase I 200,000 Training M&E 350,000 Training M&E 110,000 TA to support sector M&E 80,000 TA to support sector M&E 80,000 TA to support sector M&E 80,000 GIS database phase II INGRH 250,000 50,628 2. Evaluation Component: $352,192. is the total budget, which is allocated to the sub-activity, as follows: EVALUATION COMPONENT MCA Socio Economic interim Survey Final studies Port Impact Evaluation Specialist $352.192 69,200 193,532 89,460 6 IV. The Work Plan Project Name: Monitoring and Evaluation Project Objective: To Make the Monitoring and Evaluation of all project in the Compact Project Project Objective Project Activities Implementing of Surveys Monitoring Component To make programmatic adjustments as MCA-CV/INE necessary with the view towards improving the overall impact of the Program. The GIS database phase I Detailed M&E Project Plan will be revisited annually and include targets on a twelve GIS database phase II month rolling calendar. Training M&E Evaluation Component To determine whether project activities have had the desired effects on intended direct beneficiaries; i.e., individuals, households and/or institutions, and whether those effects can be attributed to project interventions. MCA Socio Economic interim Survey Port Impact Evaluation Specialist Final studies Duration Q17 O-D Q18 J-M X 6 months Q19 A-J Q20 J-S Budget $USD Responsibility X 329.747 INE X X 200.000 6 months X X 250.000 MCA/Consul tant MCA/Consul tant 6 months X X X X X 6 months 6 months 6 months 3 months X 350.000 MCA/Consul tant 69.200 DSSA X 193.532 MCA/Consul tant X 89.460 X MCA/Consul tants 7 Millennium Challenge Account – Cabo Verde CONSELHO COORDENADOR ATTACHMENT F Insurance Estamos a construir o futuro We are building the future Nu sta construi futuru Millennium Challenge Account – Cabo Verde CONSELHO COORDENADOR Deferral Letter Estamos a construir o futuro We are building the future Nu sta construi futuru Millennium Challenge Account – Cabo Verde Unidade de Gestão Millennium Challenge Corporation Attention: Jonathan Bloom, Deputy Vice President for Compact Implementation 875 Fifteenth Street, NW Washington, DC 20005 United States of America Facsimile: 202-521-3700 June 10, 2009 Re: Millennium Challenge Compact – Request for Deferral of Certain Quarter 4, Year 4 Conditions Precedent Dear Mr. Bloom: Reference is made to that certain Millennium Challenge Compact between the United States of America, acting through the Millennium Challenge Corporation (“MCC”), and the Government of the Republic of Cape Verde (the “Government”), dated as of July 4, 2005 (the “Compact”). Reference is further made to the Disbursement Agreement by and among MCC, the Ministry of Finance and Planning, on behalf of the Government, and MCA-Cape Verde (“MCA-Cape Verde”), dated as of October 17, 2005 (the “Disbursement Agreement”). Unless otherwise stated, all capitalized terms that are used but not defined herein shall have the meaning given such terms in the Compact or Disbursement Agreement. Pursuant to Section 3.8(c) of the Disbursement Agreement, we hereby formally request a deferral of the following conditions precedent that should have been fulfilled prior to MCC Disbursement in this upcoming quarter, thus MCA-Cape Verde is hereby requesting deferral of these conditions precedent for the Project, Project Activity or sub-activity to which the condition precedent relates, as the case may be: No. Project/Project Activity/Sub‐Activity 1 Water Management and Agricultural Support / Agri‐Business Development Services The Ministry of Environment and Agriculture and the Outside Project Manager has implemented a "fee for services" policy (satisfactory to MCC), charging fees for quality inspections, and certifications. Quarter 4, year 4 MCA‐CV is requesting deferral until the quarterly disbursement period immediately preceding the inauguration of any of the packing sheds Water Management and Agricultural Support / Agri‐Business Development Services The Government has eliminated regulatory and legal obstacles to movement of inspected and certified horticultural products, including taking all necessary regulatory or other actions to lift the embargo on exports of horticultural products from Santo Antão. Quarter 4, year 4 MCA‐CV is requesting deferral until the quarterly disbursement period immediately preceding the inauguration of any of the packing sheds Estamos a construir o futuro Condition Precedent Disbursement Period by which CP should have originally have been fulfilled We are building the future Disbursement Period for which the deferral is being requested Nu sta construi futuru Millennium Challenge Account – Cabo Verde CONSELHO COORDENADOR Fiscal Agent Certificate Estamos a construir o futuro We are building the future Nu sta construi futuru Millennium Challenge Account – Cabo Verde CONSELHO COORDENADOR Account Statement Estamos a construir o futuro We are building the future Nu sta construi futuru