nuclep - LAS/ANS

Transcrição

nuclep - LAS/ANS
NUCLEP
LAS / ANS Symposium 2014
Rio de Janeiro, July 23, 2014
SUMMARY:
1. NUCLEP – THE COMPANY
2. NUCLEAR COMPONENTS ALREADY PRODUCED
3. NUCLEAR COMPONENTS IN MANUFACTURING PROCESS FOR
ANGRA 3
4. FUTURE NUCLEAR POWER PLANTS IN BRAZIL
5. COMPONENTS TO THE BRAZILIAN NAVY & INB
6. OFFSHORE MODULES
7. SUBMARINE PRESSURE HULLS
1 NUCLEP
1.
MINISTRY OF
SCIENCE,
TECHNOLOGY AND
INNOVATION
BRAZILIAN
NUCLEAR
COMMISSION
CNEN
CREATED IN 1975
START OF OPERATIONS IN
MAY 1980
MAY,
NUCLEBRÁS
EQUIPAMENTOS
PESADOS S.A. NUCLEP
Itaguaí
NUCLEP
ANGRA
DOS
REIS
MARITIME
TERMINAL
Itaguaí
Port
EBN
RIO DE
JANEIRO
MAIN ACTIVITIES
 HEAVY COMPONENTS FOR NUCLEAR POWER PLANTS
 SUBMARINE PRESSURE HULLS
 PRESSURE VESSELS & HEAT EXCHANGERS
 STRUCTURES FOR OFFSHORE PLATFORMS
QUALITY CERTIFICATIONS
2. NUCLEAR COMPONENTS ALREADY PRODUCED BY NUCLEP
PRESSURIZER – ANGRA 3
ATUCHA II
VPR
A
Argentina
i
CONDENSERS
FOR ANGRA 2
ACCUMULATORS
FOR ANGRA 2
SUPERCOMPACT
STORAGE RACKS
FOR SPENT FUEL
ELEMENTS FOR
ANGRA 2
REPLACEMENT STEAM GENERATORS
FOR ANGRA 1
DESIGN: AREVA NP SAS / MANUFACTURING: NUCLEP
3 COMPONENTS FOR ANGRA 3
3.
ACCUMULATORS ( 8 UNITS)
PROGRESS: 55% / DELIVERY SCHEDULED FOR NOVEMBER/2014
CONDENSERS ( 3 UNITS)
PROGRESS:
CONDENSER 1: 88%
CONDENSER 2: 57%
CONDENSER 3: 12%
DELIVERY SCHEDULE:
CONDENSER 1: SEPTEMBER, 2014
CONDENSER 2: APRIL
APRIL, 2015
CONDENSER 3: OCTOBER, 2015
DESIGN: SIEMENS - KWU
MANUFACTURING: NUCLEP
INDIVIDUAL WEIGHT: 500 tons
EMBEDDED STRUCTURES
4. FUTURE NUCLEAR POWER PLANTS IN BRAZIL
ACTIONS AT NUCLEP:
NUCLEP
1. STUDY OF THE MAIN REACTORS – GENERATION III
III+
2. IDENTIFICATION OF INVESTMENT NEEDS
3 PREPARATION OF TRAINING PROGRAM
3.
5. COMPONENTS TO THE BRAZILIAN NAVY & INB
5.1 BRAZILIAN NAVY
VESSELS VP1 / VP2
COMPENSATION TANKS OF THE
EMERGENCY COOLING SYSTEM
VESSEL DZ1
DELIVERY SCHEDULED FOR
MARCH, 2015
VESSEL FOR THE PRIMARY CIRCUIT
PURIFICATION SYSTEM
COMPONENTS FOR NUCLEAR PROPULSION OF SUBMARINES
REACTOR PRESSURE
VESSEL
STEAM
GENERATORS
5.2 INB
CYLINDERS FOR STORAGE AND TRANSPORTATION OF
URANIUM HEXAFLUORIDE (UF6)
CYLINDER 30B
CYLINDER 48Y
6. OFFSHORE MODULES
7. CONSTRUCTION OF SUBMARINES
FOUR SUBMARINE PRESSURE HULLS MANUFACTURED BY
NUCLEP TO THE BRAZILIAN NAVY, WITH GERMAN TECHNOLOGY
CURRENTLY – FOUR SUBMARINE PRESSURE HULLS CLASS
SCORPÈNE WITH FRENCH TECHNOLOGY
THANKS FOR
YOUR
ATTENTION
[email protected]
www.nuclep.gov.br