Fiber Cement Roofing Rehabilitation with High Wave Sheets
Fiber Cement Roofing Rehabilitation
with High Wave Sheets
Pingo Doce in Venda Nova
Fiber Cement Roofing Rehabilitation with High Wave Sheets
Pingo Doce Venda Nova
System with lightened metallic armor reinforcement: without drilling of
the existing sheets without release of dust and with greater wind
resistance action.
Besides the environmental benefits, totals sealing, aesthetic and
convenience during the performance of works, not causing risk or
disruption to the normal operation of buildings, in the case of system
presented here for rehabilitation of roofs with high wave fiber cement
sheets profile, we still have the transformation of a complicated and
insecure roofing access into a reinforced flat roof, with the comfort of
inherent use.
Innovation and adaptability in rehabilitation.
Rua Doutor João Soares, 12, 2º D 1600-062 Lisboa t :. + 351 211 165 219
Rua Feliciano Ramos, 20 Apartado 1114 4711-908 Braga t :. + 351 253 612 829
e :. [email protected]
Photographic Record of Progress in Works
Before Repair
Rua Doutor João Soares, 12, 2º D 1600-062 Lisboa t :. + 351 211 165 219
Rua Feliciano Ramos, 20 Apartado 1114 4711-908 Braga t :. + 351 253 612 829
e :. [email protected]
Application of the Rehabilitation System
Metal foot built into the existing attachment
Placing blocks in EPS
Placing metal profiles to fix the thermal insulation sheets and strengthening the roofing
EPS blocks for leveling the cover and lightened metal structure to reinforce the fixing of the roofing and thermal
insulation and waterproofing system
Rua Doutor João Soares, 12, 2º D 1600-062 Lisboa t :. + 351 211 165 219
Rua Feliciano Ramos, 20 Apartado 1114 4711-908 Braga t :. + 351 253 612 829
e :. [email protected]
Placement of the thermal insulation sheets that are simultaneously the base of sealing
Placing the 1st waterproofing membrane
Placing the 2nd waterproofing membrane
Rua Doutor João Soares, 12, 2º D 1600-062 Lisboa t :. + 351 211 165 219
Rua Feliciano Ramos, 20 Apartado 1114 4711-908 Braga t :. + 351 253 612 829
e :. [email protected]
Complete system - Final Result
Rua Doutor João Soares, 12, 2º D 1600-062 Lisboa t :. + 351 211 165 219
Rua Feliciano Ramos, 20 Apartado 1114 4711-908 Braga t :. + 351 253 612 829
e :. [email protected]
Rua Doutor João Soares, 12, 2º D 1600-062 Lisboa t :. + 351 211 165 219
Rua Feliciano Ramos, 20 Apartado 1114 4711-908 Braga t :. + 351 253 612 829
e :. [email protected]
Singular Points * Continuous System * Total Waterproofing
Cutting of the facade panel to allow placement of thermal insulation plates and the completion of the finishes of
the waterproofing implementation
Profile metal reinforcing inside and fixation of the facade panel and effective finishes of the waterproofing
implementation
Placing the waterproofing behind the panel and its attachment to the new interior metal profile
Performance of new trop-plein and exit openings for rainwater
Rua Doutor João Soares, 12, 2º D 1600-062 Lisboa t :. + 351 211 165 219
Rua Feliciano Ramos, 20 Apartado 1114 4711-908 Braga t :. + 351 253 612 829
e :. [email protected]
Removal of damaged metal helmets and placement of new sandwiched bottom profile on the waterproofing
system
New waterproofing finishing profile on parapets
Elimination of gutter - increased safety and ease of maintenance
Cleaning and occasional repairs on the existing waterproofing in central terraces
Rua Doutor João Soares, 12, 2º D 1600-062 Lisboa t :. + 351 211 165 219
Rua Feliciano Ramos, 20 Apartado 1114 4711-908 Braga t :. + 351 253 612 829
e :. [email protected]

Documentos relacionados

Fiber Cement Roofing Rehabilitation

Fiber Cement Roofing Rehabilitation Application of the Rehabilitation System

Leia mais

SYLVAN UNION SCHOOL DISTRICT SYSTEM REPLACEMENT

SYLVAN UNION SCHOOL DISTRICT SYSTEM REPLACEMENT SYLVAN UNION SCHOOL DISTRICT SYSTEM REPLACEMENT PLAN AS OF APRIL 25, 2016 Fiscal Year

Leia mais