2014 Maintenance Schedule
January 28th 2014, Shippers meeting
Jean-Damien LENOIR
Miguel ANTUNES
Anne-Laure SAINMONT
Pascal FONROUGE
1
Shippers meeting – 28.01.2014
Agenda
1
2
3
4
5
2
Key points
News & Main works and coordinations for 2014
Focus on specific weeks
Comparison of 2014 vs 2013 maintenance program
Graphs presenting available capacities on each
contractual points
Storages filling
Shippers meeting – 28.01.2014
Key points
3
Shippers meeting – 28.01.2014
Key points
GRTgaz is doing its best to optimize its works schedule
in cooperation with all the adjacent operators
The optimized 2014 maintenance schedule and a new
methodology to calculate the available capacities have
allowed to reduce the impacts:
Mainly on the North – South link
And also on other contractual points
Maintenance works planning for 2014 is reliable even if
modifications are still possible until the end of
February.
4
Shippers meeting – 28.01.2014
News &
Main works and
coordinations
for 2014
5
Shippers meeting – 28.01.2014
New methodology to calculate available capacities
Assumptions
Assumptions used for studies (new method)
Update of consummption model
Update of limit supply scenarios taking into account the historical
flow and the 2014 Shipper Survey
 3 main assumptions taking into account the limit scenarii updated for 2014 :
Obergailbach very high
Montoir very low
6
Oltingue very low
Shippers meeting – 28.01.2014
New methodology to calculate available capacities
Principle and distribution rule
Planning principle
No important restriction before April 15th and after October
15th (because of climatic risk)
Works coordination with important impacts:
 No coordination of works with simultaneous big impacts on several entry
points.
 Coordination of works with an impact on the North – South link
simultaneously with works impacting North entry points and Midi point.
For the North – South link
 To increase the minimal capacity (CMNTt) we consider :
 On North: potential competition between Oltingue vs N>S link
 On South: potential competition between Fos vs N>S link
Distribution rule of restriction capacities
 Distribution of restrictions for each contractual points regarding to the
subscribed capacities prorata.
7
Shippers meeting – 28.01.2014
Main works for 2014 : Main pipes inspection
Instrumented pigging
(+ a period of repairs) on one
pipe used to take away gas
from Dunkerque & Taisnières H
Instrumented pigging
(+ a period of repairs) on one
pipe used to take away gas from
Taisnières H & Obergailbach
Instrumented pigging
(+ a period of repairs) on one
pipe used to transit from North
zone to South zone
8
Shippers meeting – 28.01.2014
Main works for 2014 : Main repairs
A period of repairs on one
pipe used to take away gas
from Dunkerque, Taisnières
H & Obergailbach
A period of repairs on
one pipe used to transit
from North zone to
South zone
A period of repairs on
one pipe used to
evacuate gas from Fos
terminal or to supply
South zone
9
Shippers meeting – 28.01.2014
Main works for 2014 : Development
Upgrading Taisnières H
counting system
Upgrading the Cuvilly
interconnection
Installation of a new
counting system for more
contractual reliability
10
Shippers meeting – 28.01.2014
Focus on week 27 (June 30th – July 6th)
Dunkerque
(225 GWh/j)
Taisnières H
(230 GWh/j)
Obergailbach
(500 GWh/j)
Oltingue
(0 GWh/j)
Fos
Shippers meeting – 28.01.2014
Focus on week 39 (September 22th – September 28th)
Dunkerque
(70 GWh/j)
Taisnières H
(605 GWh/j)
Obergailbach
(500 GWh/j)
Oltingue
(223 GWh/j)
Fos
12
Shippers meeting – 28.01.2014
Comparison of
2013 vs 2014
maintenance program
13
Shippers meeting – 28.01.2014
Comparison summer period 2013 vs 2014
Transport capacities for Terminal points
Available Capacities during Summer
(TWh)
14
Tendency
2013
2014
Montoir
77
76
-2%
Fos
69
76
+10%
Total
146
152
+4%
Shippers meeting – 28.01.2014
Comparison summer period 2013 vs 2014
Transport capacities for storages points
Available Capacities during Summer
(TWh)
2013
2014
South-East DEL
16
42
40
22
26
57
47
29
60%
36%
19%
34%
South-Atlantique
DEL
0
0
0%
North-Atlantique
DEL
30
33
11%
149
192
29%
North B DEL
North-East DEL
North-West DEL
Total
15
Tendency
Shippers meeting – 28.01.2014
Comparison summer period 2013 vs 2014
Entry-Exit points capacities
Available Capacities during Summer
(TWh)
16
Tendency
2013
2014
Dunkerque REC
99
107
8%
Taisnières H REC
84
109
31%
Obergailbach REC
101
91
-10%
Total
284
307
8%
Oltingue DEL
43
43
1%
Midi REC
17
54
224%
Midi DEL
60
71
19%
Taisnières B REC
48
42
-13%
Shippers meeting – 28.01.2014
Comparison summer period 2013 vs 2014
North-South link capacities
Available Capacities during Summer
(TWh)
North-South link DEL
17
2013
2014
40
52
Shippers meeting – 28.01.2014
Tendency
+31%
Graphs presenting
available capacities on
each contractual
points
18
Shippers meeting – 28.01.2014
Taisnières B
Valves maintenance
19
Shippers meeting – 28.01.2014
Dunkerque
Taisnières H counting system
(Focus W27)
Maintenance compressor
(Cuvilly + Fontenay)
+ Coordianation with Gassco
20
Shippers meeting – 28.01.2014
Taisnières H
Taisnières H counting system
(Focus W27)
21
Shippers meeting – 28.01.2014
Obergailbach
North-East pipe
instrumented pigging
22
Shippers meeting – 28.01.2014
Midi DEL (South zone -> TIGF)
Roussines
maintenance compressor
23
Rhône
pipe repairs
Shippers meeting – 28.01.2014
Etrez-St Avit
pipe repairs
Midi REC (TIGF -> South zone)
24
Shippers meeting – 28.01.2014
Oltingue
Oltingue
annual maintenance
25
Shippers meeting – 28.01.2014
North - South link
Plateau du Vexin +
Vendômois repairs
(Focus W39)
Bourgogne
new counting system
26
Shippers meeting – 28.01.2014
Injection in Sediane B storage group with works
(Gournay)
Availibility in %
Capacity GWh/d
Nord B pipe
test valves
27
Shippers meeting – 28.01.2014
Injection in North-East storages group with works
28
Capacity GWh/d
Availibility in %
(Saint-Clair, Germigny, Cerville)
Shippers meeting – 28.01.2014
Injection in North-West storages group with works
(Saint-Illiers, Beynes)
Availibility in %
Capacity GWh/d
Competition
North - South link
vs North-West storages
29
Shippers meeting – 28.01.2014
Injection in Saline storages group with works
Capacity GWh/d
Availibility in %
(Etrez, Tersanne, Manosque)
Cabriès – Manosque
pipe repairs
30
Shippers meeting – 28.01.2014
Injection in North-Atlantique storages group with works
31
Capacity GWh/d
Availibility in %
(Chémery, Céré)
Shippers meeting – 28.01.2014
Coordination between Elengy/GRTgaz in Montoir
Maine oiler
repair
Fire-fighting
system
32
Pre-cooling
unit
New public
distribution
on Maine
Shippers meeting – 28.01.2014
Cherré compressor
maintenance
Coordination between Elengy/Fosmax/GRTgaz in Fos
Cavaou high flow
rate for reloading
33
Rhône
repairs
Shippers meeting – 28.01.2014
Storages filling
34
Shippers meeting – 28.01.2014
Filling of North B storage group
35
Shippers meeting – 28.01.2014
Filling of North storages group
firm GRTgaz capacities
36
Shippers meeting – 28.01.2014
Filling of South storages group
37
Shippers meeting – 28.01.2014
38