2014 Maintenance Schedule
Transcrição
2014 Maintenance Schedule
2014 Maintenance Schedule January 28th 2014, Shippers meeting Jean-Damien LENOIR Miguel ANTUNES Anne-Laure SAINMONT Pascal FONROUGE 1 Shippers meeting – 28.01.2014 Agenda 1 2 3 4 5 2 Key points News & Main works and coordinations for 2014 Focus on specific weeks Comparison of 2014 vs 2013 maintenance program Graphs presenting available capacities on each contractual points Storages filling Shippers meeting – 28.01.2014 Key points 3 Shippers meeting – 28.01.2014 Key points GRTgaz is doing its best to optimize its works schedule in cooperation with all the adjacent operators The optimized 2014 maintenance schedule and a new methodology to calculate the available capacities have allowed to reduce the impacts: Mainly on the North – South link And also on other contractual points Maintenance works planning for 2014 is reliable even if modifications are still possible until the end of February. 4 Shippers meeting – 28.01.2014 News & Main works and coordinations for 2014 5 Shippers meeting – 28.01.2014 New methodology to calculate available capacities Assumptions Assumptions used for studies (new method) Update of consummption model Update of limit supply scenarios taking into account the historical flow and the 2014 Shipper Survey 3 main assumptions taking into account the limit scenarii updated for 2014 : Obergailbach very high Montoir very low 6 Oltingue very low Shippers meeting – 28.01.2014 New methodology to calculate available capacities Principle and distribution rule Planning principle No important restriction before April 15th and after October 15th (because of climatic risk) Works coordination with important impacts: No coordination of works with simultaneous big impacts on several entry points. Coordination of works with an impact on the North – South link simultaneously with works impacting North entry points and Midi point. For the North – South link To increase the minimal capacity (CMNTt) we consider : On North: potential competition between Oltingue vs N>S link On South: potential competition between Fos vs N>S link Distribution rule of restriction capacities Distribution of restrictions for each contractual points regarding to the subscribed capacities prorata. 7 Shippers meeting – 28.01.2014 Main works for 2014 : Main pipes inspection Instrumented pigging (+ a period of repairs) on one pipe used to take away gas from Dunkerque & Taisnières H Instrumented pigging (+ a period of repairs) on one pipe used to take away gas from Taisnières H & Obergailbach Instrumented pigging (+ a period of repairs) on one pipe used to transit from North zone to South zone 8 Shippers meeting – 28.01.2014 Main works for 2014 : Main repairs A period of repairs on one pipe used to take away gas from Dunkerque, Taisnières H & Obergailbach A period of repairs on one pipe used to transit from North zone to South zone A period of repairs on one pipe used to evacuate gas from Fos terminal or to supply South zone 9 Shippers meeting – 28.01.2014 Main works for 2014 : Development Upgrading Taisnières H counting system Upgrading the Cuvilly interconnection Installation of a new counting system for more contractual reliability 10 Shippers meeting – 28.01.2014 Focus on week 27 (June 30th – July 6th) Dunkerque (225 GWh/j) Taisnières H (230 GWh/j) Obergailbach (500 GWh/j) Oltingue (0 GWh/j) Fos Shippers meeting – 28.01.2014 Focus on week 39 (September 22th – September 28th) Dunkerque (70 GWh/j) Taisnières H (605 GWh/j) Obergailbach (500 GWh/j) Oltingue (223 GWh/j) Fos 12 Shippers meeting – 28.01.2014 Comparison of 2013 vs 2014 maintenance program 13 Shippers meeting – 28.01.2014 Comparison summer period 2013 vs 2014 Transport capacities for Terminal points Available Capacities during Summer (TWh) 14 Tendency 2013 2014 Montoir 77 76 -2% Fos 69 76 +10% Total 146 152 +4% Shippers meeting – 28.01.2014 Comparison summer period 2013 vs 2014 Transport capacities for storages points Available Capacities during Summer (TWh) 2013 2014 South-East DEL 16 42 40 22 26 57 47 29 60% 36% 19% 34% South-Atlantique DEL 0 0 0% North-Atlantique DEL 30 33 11% 149 192 29% North B DEL North-East DEL North-West DEL Total 15 Tendency Shippers meeting – 28.01.2014 Comparison summer period 2013 vs 2014 Entry-Exit points capacities Available Capacities during Summer (TWh) 16 Tendency 2013 2014 Dunkerque REC 99 107 8% Taisnières H REC 84 109 31% Obergailbach REC 101 91 -10% Total 284 307 8% Oltingue DEL 43 43 1% Midi REC 17 54 224% Midi DEL 60 71 19% Taisnières B REC 48 42 -13% Shippers meeting – 28.01.2014 Comparison summer period 2013 vs 2014 North-South link capacities Available Capacities during Summer (TWh) North-South link DEL 17 2013 2014 40 52 Shippers meeting – 28.01.2014 Tendency +31% Graphs presenting available capacities on each contractual points 18 Shippers meeting – 28.01.2014 Taisnières B Valves maintenance 19 Shippers meeting – 28.01.2014 Dunkerque Taisnières H counting system (Focus W27) Maintenance compressor (Cuvilly + Fontenay) + Coordianation with Gassco 20 Shippers meeting – 28.01.2014 Taisnières H Taisnières H counting system (Focus W27) 21 Shippers meeting – 28.01.2014 Obergailbach North-East pipe instrumented pigging 22 Shippers meeting – 28.01.2014 Midi DEL (South zone -> TIGF) Roussines maintenance compressor 23 Rhône pipe repairs Shippers meeting – 28.01.2014 Etrez-St Avit pipe repairs Midi REC (TIGF -> South zone) 24 Shippers meeting – 28.01.2014 Oltingue Oltingue annual maintenance 25 Shippers meeting – 28.01.2014 North - South link Plateau du Vexin + Vendômois repairs (Focus W39) Bourgogne new counting system 26 Shippers meeting – 28.01.2014 Injection in Sediane B storage group with works (Gournay) Availibility in % Capacity GWh/d Nord B pipe test valves 27 Shippers meeting – 28.01.2014 Injection in North-East storages group with works 28 Capacity GWh/d Availibility in % (Saint-Clair, Germigny, Cerville) Shippers meeting – 28.01.2014 Injection in North-West storages group with works (Saint-Illiers, Beynes) Availibility in % Capacity GWh/d Competition North - South link vs North-West storages 29 Shippers meeting – 28.01.2014 Injection in Saline storages group with works Capacity GWh/d Availibility in % (Etrez, Tersanne, Manosque) Cabriès – Manosque pipe repairs 30 Shippers meeting – 28.01.2014 Injection in North-Atlantique storages group with works 31 Capacity GWh/d Availibility in % (Chémery, Céré) Shippers meeting – 28.01.2014 Coordination between Elengy/GRTgaz in Montoir Maine oiler repair Fire-fighting system 32 Pre-cooling unit New public distribution on Maine Shippers meeting – 28.01.2014 Cherré compressor maintenance Coordination between Elengy/Fosmax/GRTgaz in Fos Cavaou high flow rate for reloading 33 Rhône repairs Shippers meeting – 28.01.2014 Storages filling 34 Shippers meeting – 28.01.2014 Filling of North B storage group 35 Shippers meeting – 28.01.2014 Filling of North storages group firm GRTgaz capacities 36 Shippers meeting – 28.01.2014 Filling of South storages group 37 Shippers meeting – 28.01.2014 38