Environment is Our Priority - Profico Ambiente e Ordenamento
Transcrição
Environment is Our Priority - Profico Ambiente e Ordenamento
Environment is Our Priority FEBRUARY 2013 PROFICO AMBIENTE E ORDENAMENTO, LDA. Morada: Rua Alfredo da Silva 11-B 1300-040 Lisboa E-mail: [email protected] Tel.: (+351) 21 361 93 60 Fax: (+351) 21 361 93 69 www.proficoambiente.pt 1 2 IS “ENVIRONMENT OUR PRIORITY ” 04. ABOUT US 04. MISSION 05. QUALITY POLICY 06. TEAM 07. SERVICES 08. CLIENTS 10. PROJECTS 3 ABOUT US PROFICO AMBIENTE is a consultancy company working in the Environmental Area whose work encompasses the preparation of studies and projects in the areas of the Environment and Regional Planning. PROFICO AMBIENTE CARRIES OUT ITS ACTIVITIES IN AN INTEGRATED MANNER, SUCH THAT IT: conceives, analyses and technically supports the selection of the most sustainable solutions for the problems raised, thus guaranteeing a suitable cost-efficiency relation; monitors the implementation of the chosen solutions, in order to ensure their correct application, during the stages of construction, exploration and the deactivation of enterprises/undertakings; technically supports its Clients in contacts with the Ministry of the Environment as well as other local authorities involved in the licensing and environmental processes; plans and carries out training and awareness activities, both of a general and specific nature, according to the interests of its Clients. MISSION The principal mission of PROFICO AMBIENTE consists in the full satisfaction of its Clients through the conception and implementation of solutions finely tuned to their interests and designs and to the necessary framing of solutions within an environmental context. To carry out this objective, PROFICO AMBIENTE encourages a close relationship with its Clients during the development of their projects, which enables the final products to be finely tuned to their true needs, whilst simultaneously respecting environmental standards of quality. 4 QUALITY POLICY Establishing and developing a quality policy allows PROFICO AMBIENTE to attain the Excellency of its services in studies and projects in the areas of the Environment and Regional Planning. PROFICO AMBIENTE obtained the ISO 9001:2008 quality management system certification in 2010. The first aim of the company is to provide services which meet the clients’ requests namely in compliance with internal quality requirements, term keeping and contractual price. A pivotal condition is also legal and regulatory fulfillment. To reach this target we carry on: • Continuous improvement of our internal structure and human resources in order to achieve efficiency and growth; • Improvement of the know-how of the various areas of the company as well as continuous training of the staff. 5 ORGANIZATIONAL STRUCTURE The organisational structure of PROFICO AMBIENTE is the following. 6 SERVICES • • • • • Environmental Studies: • Environmental Impact Assessment • Environmental Monitoring • Waste Management • Waste Water Management • Spatial Planning • Landscape Integration and Environmental Requalification Environmental Management: • Environmental Auditing • Environmental Advisory • Implementation of Environmental Management Tools • Licensing Studies of Environmental Risk Assessment • Annual Environmental Reports of Environmental PCIP • Licensing • Sustainability Reporting • Social Responsibility Advisory • Studies of Environmental Risk Assessment Environmental Monitoring of Works: • Construction and Demolition Waste Management Prevention Plans • Environmental Management Systems/ Environmental Management Plans of Works • Contract Monitoring Plans • Environmental Monitoring of Works • Environmental Supervision of Works Health and Safety • Health and Safety Plans • Internal Emergency Plans • Risk Assessment Environmental Training and Awareness 7 CLIENTS WW 8 PROJECTS ENVIRONMENTAL IMPACT STUDIES AND OTHER SIMILAR STUDIES • Environmental Study for Development of Ecological Interest Areas of the Complementary Spillway Flood of the Caniçada Dam (EDP Produção, Portugal), 2012 • Environmental Baseline Studies to support four Municipal Directors Plans at Huambo Province, Angola (CENGA), 2012 • Environmental Study to support the Upgrade of High Voltage Line of Recarei – Vermoim 3 (LRR.VM 3), from 220 kV to 400 kV (REN - Redes Energéticas Nacionais, SGPS, S.A.), 2012 • Environmental Diagnosis and Action Plan to support water level lowering in the Caniçada Dam for Power Boot Use of the Salamonde Dam – Salamonde II, 2011 • Environmental Impact Study of the New Outlet (Algarve The Style Outlets) at Estói, Faro, Algarve (NEINVER), 2011 • Environmental Impact Study of the IP3 - New Bridge over Dão River, km 75+310 (Profico – Projectos, Fiscalização e Consultadoria, Lda./Estradas de Portugal), 2011 • Environmental Impact Study of the Municipal Waste Management Centre in S. Miguel Island, Azores (AMISM), 2010 • Environmental Impact Study of the Power Boot Use of Salamonde Dam– Salamonde II (EDP – Gestão da Produção de Energia, S.A.), 2010 • Environmental Impact (ENERGIEKONTOR), 2010 • Environmental Impact Study of the Project Railway Link of Cascais and Lisbon Port to Lisbon Railway Ring (REFER, EPE – Rede Ferroviária Nacional), 2009 • Environmental Impact Study of the IKEA Retail Park in Loures, Portugal (IKEA), 2009 • Environmental Impact Study of the Infrastruture Project of the Containers Terminal at João Paulo II Airport, Azores (ANA – Aeroportos de Portugal), 2008 • Environmental Impact Study of the Hydroelectric Installation of the Foz Tua Dam (EDP – Gestão da Produção de Energia, S.A.), 2008 Study of the Wind Farm of Guardão 9 10 • Environmental Impact Study of the Infrastructure Project for the Lane 10 ILS and Platform and Paths of Circulation Expansion at the Faro Airport (ANA – Aeroportos de Portugal), 2008 • Environmental Impact Study of the Wastewater Treatment Plant of the Lis Region Pig Breeding Plants, RECILIS (2007) • Environmental Impact Study of the Cogeneration Plant at the Refinery of Porto (GALP POWER), 2007 • Environmental Impact Study of the Wastewater Treatment Plant of the Milagres Pig Breeding, RECILIS (2005) • Environmental Impact Study of the Galp Power Combined Cycle Central Station in Sines-Vale Marim, GALP POWER (in progress) • Environmental Impact Study of Lot 3A2 – Lisboa-Montemor-o-Novo Link via the Third Tagus Crossing, SENER-GLOBALVIA-CÂNCIO MARTINS Consortium for RAVE (in progress). • Environmental Impact and Noise Abatement Study concerning the Widening and Improvement to 2x3 lanes: Baltar/Paredes section, BRISA (in progress) • Environmental Impact and Noise Abatement Study concerning the Widening and Improvement to 2x3 lanes: Campo/Baltar section, BRISA (in progress) • Environmental Impact Study of the IC36 – Leiria Sul (IC2) / Leiria Nascente (COL), Estradas de Portugal, PCT – PROFICO for E.P.E. (in progress) • Environmental Impact Study of the Galp Power Combined Cycle Central Station in Sines (GALP POWER), 2006 • Proposal for Defining the Scope of the EIS of a Combined Cycle Central Station in Sines (GALP POWER), 2005 • Environmental Repercussions Study of the Integrated Centre for the Requalification, Assessment and Elimination of Hazardous Waste (CIRVER) in Chamusca (HIDURBE/ BEFESA Consortium), 2004 • Environmental Repercussions Study of the Teixo Hydroelectric Project (HDR Hidroeléctrica), 2004 • Environmental Repercussions Study of the Malhadouro Hydroelectric Project (HDR Hidroeléctrica), 2004 • Environmental Impact Study of the Sines Central Cogeneration Refinery (GALP POWER), 2004 • Environmental Impact Study of the Processing Alterations of the HERBEX Industrial Unit (HERBEX), 2004 • Environmental Repercussions Study of the Fornelo do Monte Wind Park (GENERG), 2004 • Environmental Repercussions Study of the Farves/Novais Wind Park (GENERG), 2004 • Environmental Impact Study of the Enlargement of the Waste Treatment System on São Miguel Island (AMISM), 2003 • Environmental Repercussions Study for the Alternative Proposal for the Guia ETAR (Waste Water Treatment Plant), (CME), 2003 • Environmental Repercussions Studies of the Canedo Hydroelectric Projects (HIDROCENTRAIS REUNIDAS), 2003 • Environmental Repercussions Studies of the Cabeço Alto and Serra do Gomes Wind Parks (GENERG), 2003 • Environmental Impact Study of the Zibreiro-Moeda Wind Park (GENERG), 2003 • Environmental Repercussions Study of the Santana Theme Park in the Autonomous Region of Madeira (EDICARTE), 2002 • Environmental Impact Study of the Loureiro-Monte Novo Irrigation Canal and the corresponding Irrigation Area (EDIA), 2003 • Environmental Repercussions Studies of the Casinhas, Mougueiras and Moradal Wind Parks in the area of Pinhal Interior (GENERG), 2002 • Environmental Impact Study of the Outeiro Wind Park (Parque Eólico do Outeiro, Lda), 2002 • Environmental Impact Study of the Second Phase of the Alvão Wind Park (EEA), 2002 • Environmental Impact Study of the Advanced Study of the Ericeira-MafraMalveira Link (CM Mafra, PLANVIA), 2002 • Environmental Impact Study of the S. Lourenço da Montaria Wind Park in Serra de Arga (GENERG), 2001 • Environmental Impact Study of the Regularisation Project for Vala da Salgueirinha - Palmela (INAG), 2001 • Environmental Repercussions Study of the Fornelo do Monte/Souto Bom Wind Park in Serra do Caramulo (GENERG), 2001 • Environmental Repercussions Study of the Cleaning and Clearing-up of a Section of the Águeda River (INAG), 2001 and Ermelo 11 • Environmental Repercussions Study of the Alvão Wind Park (FINERGE), 2001 • Comparative Study of the Environmental Sensitivity of the 3rd Road Crossing over the Tagus river (LUSOPONTE), 2001 • Environmental Repercussions Study of the Gevancas Wind Park (FINERGE), 2001 • Environmental Impact Study of the Outeiro dos Fiéis Wind Park (FINERGE), 2001 • Environmental Impact Study of the Carriço Central Cogeneration Refinery (GALP POWER), 2000 ENVIRONMENTAL COMPLIANCE OF THE (ENVIRONMENTAL IMPACT STATEMENT) FINAL PROJECT WITH THE EIS • Environmental Compliance Report (RECAPE) of the Foz Tua Hydroelectric Dam (EDP Produção), 2010 • Environmental Compliance Report (RECAPE) of the Expansion and Renovation of the terminal from Faro Airport (ANA - Aeroportos de Portugal), 2010 • Environmental Compliance Report (RECAPE) of the Cogeneration Plant at the Refinery of Porto (PORTCOGERAÇÃO/GALP POWER, S.A.), 2009 • Environmental Compliance Report (RECAPE) of the Wastewater Treatment Plant of the Lis Region Pig Breeding Plants, (RECILIS), 2009 • Environmental Compliance Report (RECAPE) of the Cogeneration Plant at the Refinery of Sines (PORTCOGERAÇÃO/GALP POWER, S.A.), 2006 • Environmental Compliance Report (RECAPE) of the Ribabelide Wind Farm (Empreendimentos Eólicos de Ribabelide), 2006 • Environmental Compliance Report (RECAPE) of the Lagoa de D. João e Feirão Wind Farm (Empreendimentos Eólicos de Ribabelide), 2006 • Environmental Compliance Report (RECAPE) of the A8 Highway between Malveira and Ericeira (PLANVIA/CMM), 2005 • Environmental Compliance Report (RECAPE) of the Ericeira/Mafra/Malveira – Ericeira/Mafra (PLANVIA/CMM), 2004 Road ENVIRONMENTAL MONITORING • 12 Bat Monitoring at Power Boot Use of Salamonde Dam – Salamonde II (EDP Produção), ongoing • Baixo Sabor Hydroelectric Project – Further Studies relating Compensatory Measure MC9 – Protection and Improvement Program to Rupicola Avifauna in Northeast Trás-os-Montes (EDP Produção) (ongoing) • Baixo Sabor Hydroelectric Installation Project – Further Studies relating to Compensatory Measure MC10 – Protection and Improvement Program to Reptiles, Amphibians and Invertebrates in Sabor Valley (EDP Produção) (ongoing) • Environmental Monitoring of the Wind Farm of Ribabelide (EER), 2011 • Environmental Monitoring of the Wind Farm of Lagoa de D. João e Feirão (EED), 2011 • Environmental Monitoring of the Wind Farm of Guarda II, Centrais Eólicas Reunidas (CENTEOL, S.A.), 2010 • Environmental Monitoring of the Wind Farm of Outeiro (Parque Eólico do Outeiro/FINERGE), 2008 • Environmental Monitoring of 2nd Phase of the Wind Farm of Alvão (EEA), 2007 • Environmental Monitoring of 1st Phase of the Wind Farm of Alvão (EEA), 2002 STRATEGIG ENVIRONMENTAL PLANNING • Strategic Environmental Planning of the Huambo Province, Angola (PGEGoverno Provincial do Huambo) (ongoing) • Strategic Environmental Planning of the Bacelos Local Plan (MB477 Arquitectura e Território, Lda.) (ongoing) • Strategic Environmental Planning of the Quinta da Ferraria Local Plan, Rio Maior (Poligreen – Gestão e Investimentos, S.A. to Rio Maior Municipality), 2011 LOCAL AGENDA 21 • Support of the Strategic Plan Implementation for Vila Real de Santo António Municipality - CIUMED Project (Vila Real de Santo António Municipality), 2004/2005 13 ENVIRONMENTAL LICENSING (IPPC) • Preparation of the Environmental Licensing Update Request (IPPC) for the Refinery of Porto (Project Management), (PORTCOGERAÇÃO/GALP POWER,S.A.) 2010 • Preparation of the Environmental Licensing Renovation Request (IPPC) for the Co-generation of Carriço (Project Management), Carriço Cogeração/GALP POWER,S.A. (February 2010). • Preparation of the Environmental Licensing Renovation Request (IPPC) for the West Waste Treatment Center” (Project Management), RESIOESTE (March 2008) • “Preparation of the Environmental Licensing Request (IPPC) for the Combined cycle power plant at Sines – S. Torpes (Project Management), GALP POWER (September 2007) • Preparation of the Environmental Licensing Request (IPPC) for the Cogeneration of Carriço of the Refinery of Sines (Project Management), SINECOGERAÇÃO/GALP POWER (November 2006) INDUSTRIAL LICENSING • Preparation of the Industrial Licensing Request for changes at CYC (fuels and coal treatment) installation (Project Management), CYC – Combustíveis e Carvões (April 2006) • Environmental Licensing of the Carriço Cogeneration Central (Carriço Cogeração), 2002 COMMERCIAL LICENSING • Preparation of the Commercial Licensing Request for IKEA, Matosinhos – wastewater and waste management, Profico – Projectos, Fiscalização E Consultadoria, Lda. (2006). • Qualitative and quantitative characterization of wastewater and waste for a Shopping Centre in Sintra, NEXITY PORTUGAL (2004). WASTE MANAGEMENT 14 • Technical Support for Review of the Industrial Waste Management Strategic Plan (PESGRI) 2011-2017, Environmental Portuguese Agency (APA) (ongoing) • Market Study with a Cost-Benefit analysis for Sustainability Assessment of the Emerging Waste Flow – Nappies, Portuguese Environment Agency (APA), 2009 • Municipal Solid Waste Action Plans for AMCAL, GESAMB and RESIALENTEJO in Alentejo region (GESAMB – Gestão Ambiental e de Resíduos, E.I.M.), 2008 • Participation in the Review of the Municipal Solid Waste Strategic Plan (PERSU), PERSU II (INR – Waste National Institute), 2007 • Physical characterization of the waste packaging – Non Municipal Origin (Sociedade Ponto Verde - SPV), 2006 • Physical characterization of the waste packaging – Non Municipal Origin (Sociedade Ponto Verde - SPV), 2006 ENVIRONMENTAL MONITORING/SUPERVISION OF WORKS • Environmental Monitoring of the New Cell of the Municipal Solid Waste Landfill of S. Miguel Island (Engenheiro Tavares Vieira, Lda.) (ongoing) • Environmental Coordination of the Hydroelectric Installation of the Foz Tua Dam Works (EDP Produção) (ongoing) • Environmental Supervision of the Demolition Works of Docapesca Buildings, at Pedrouços – VOR (APL – Administração do Porto de Lisboa), 2011 • Environmental Monitoring of the Wind Farm (Empreendimentos Eólicos de Ribabelide, S.A.), 2009 • Environmental Monitoring of the Wind Farm of Lagoa de D. João e Feirão (Empreendimentos Eólicos de Ribabelide, S.A.), 2009 • Environmental Monitoring of the Senhora do Socorro I Wind Farm , (ENDESA) 2006 • Environmental Monitoring of the Outeiro Wind Farm (Parque Eólico do Outeiro, Lda), 2005 • Environmental Monitoring of the Inertisation Works for a Tank of Waste Oils in a former Automobile Garage (ARCADIS GMI), 2005 • Environmental Monitoring on the Close Circuit Television (CCTV) of a sewer network; emptying and cleaning and integrity trials in subterranean tanks in a former Automobile Garage (ARCADIS GMI), 2005 • Environmental Monitoring of the Second Phase of the Alvão Wind Farm (EEA), 2004 • Environmental Monitoring of the Second Phase Contract Works of the Portal da Freita Wind Park , (FINERGE) 2003 • Environmental Monitoring of the Demolition Works of the 151 existing Plots in the POLIS Programme Intervention Area in Cacém, (AMBISIDER) 2004 of Ribabelide 15 • Environmental Monitoring of the Energy Transport Line of the Outeiro Wind Farm (Parque Eólico do Outeiro, Lda), 2002 • Environmental Monitoring of the ETRSU Works in Meia Serra - Madeira (ACE ETRSU), 2001 ENVIRONMENTAL MANAGEMENT • Environmental Cycle Assessment of the Municipal Waste Management System of AMISM (AMISM) (2012) • Environmental Performance Plan for the West Waste Treatment Center 2009-2013 (RESIOESTE), 2009 • Environmental Support on the Improvement of the General Cable Celcat’s Environmental Management System (General Cable Celcat), 2004 • Environmental Risk Management Plan for the Waste Sanitary Landfill of Évora, Associação de Municípios do Distrito de Évora (AMDE), July 2003 • Environmental Risk Management Plan for the Waste Sanitary Landfill of Évora, Associação de Municípios do Distrito de Évora (AMDE), July 2003 • Environmental Performance Plan for the Waste Sanitary Landfill of Oeste, RESIOESTE – Valorização e Tratamento de Resíduos Sólidos, S.A., May 2003. • Environmental Management Plan for the Port of the Viana do Castelo, Part 1 – Environmental Database (IPTM), 2003 ENVIRONMENTAL MANAGEMENT PLANS AND CONSTRUCTION AND DEMOLITION WASTE MANAGEMENTE PREVENTION PLANS 16 • Construction and Demolition Waste Management Prevention Plan for the rehabilitation of the IKEA Matosinhos (Profico – Projectos, Fiscalização e Consultadoria, Lda.), 2011 • Construction and Demolition Waste Management Prevention Plan for the Animal Rehabilitation Center (Felgar, Baixo Sabor Dam) (Profico – Projectos, Fiscalização e Consultadoria, Lda.), 2011 • Construction and Demolition Waste Management Prevention Plan of the Rehabilitation of Campo de Ourique Market (Profico – Projectos, Fiscalização e Consultadoria, Lda.), 2011 • Construction and Demolition Waste Management Prevention Plan of the Court Building in Ferreira do Alentejo (Profico – Projectos, Fiscalização e Consultadoria, Lda.), 2011 • Construction and Demolition Waste Management Prevention Plan of a baby nursery building Fajã de Cima, Azores (Profico – Projectos, Fiscalização e Consultadoria, Lda.), 2011 • Construction and Demolition Waste Management Prevention Plan of the Rehabilitation of the Rio Dão Bridge at IP3, Mortágua, Viseu (Profico – Projectos, Fiscalização e Consultadoria, Lda./Estradas de Portugal), 2010 • Construction and Demolition Waste Management Prevention Plan of the Instituto Politécnico de Lisboa (IPL) building, Benfica (GESBAU), 2010 • Construction and Demolition Waste Management Prevention Plan of 3 Bridges – Região Centro, Perry da Câmara e Associados, Lda. (Estradas de Portugal), 2010 • Construction and Demolition Waste Management Prevention Plan of the Library at Reguengos de Monsaraz (Profico – Projectos, Fiscalização e Consultadoria, Lda.), 2010 • Construction and Demolition Waste Management Prevention Plan of the water Museum (EPAL) (Profico – Projectos, Fiscalização e Consultadoria, Lda.), 2010 • Construction and Demolition Waste Management Prevention Plan of a new office building (Loja do Cidadão) of Cascais (Profico – Projectos, Fiscalização e Consultadoria, Lda.), 2010 • Construction and Demolition Waste Management Prevention Plan of the rehabilitation of Jorge Peixinho High School, Montijo (Profico – Projectos, Fiscalização e Consultadoria, Lda. / Parque Escolar), 2010 • Construction and Demolition Waste Management Prevention Plan of the rehabilitation of Montemor-o-Novo High School (Profico – Projectos, Fiscalização e Consultadoria, Lda. / Parque Escolar), 2010 • Construction and Demolition Waste Management Prevention Plan of the rehabilitation of Santa Isabel High School, Estremoz (Profico – Projectos, Fiscalização e Consultadoria, Lda. / Parque Escolar), 2010 • Construction and Demolition Waste Management Prevention Plan of the new Criminal Police Building Lisbon (INVESCON), 2010 • Construction and Demolition Waste Management Prevention Plan of new office building, Lisbon (Atelier Arquitecta Conceição Costa), 2009 • Construction and Demolition Waste Management Prevention Plan of the rehabilitation of 4 high schools (Profico – Projectos, Fiscalização e Consultadoria, Lda), 2009 17 18 • Construction and Demolition Waste Management Prevention Plan of the rehabilitation of Emídio Navarro High School, Almada (Profico – Projectos, Fiscalização e Consultadoria, Lda), 2009 • Construction and Demolition Waste Management Prevention Plan of the railway crossover - Linha do Norte Rails (GAPRES), 2009 • Construction and Demolition Waste Management Prevention Plan of the School Center Breijoeira (Escola Básica 1º Ciclo / JI), Azeitão – Setúbal (Profico – Projectos, Fiscalização e Consultadoria, Lda / Câmara Municipal de Setúbal), 2008 • Construction and Demolition Waste Management Prevention Plan of the railway crossover at PK 212+983 North Line Rail (Profico – Projectos, Fiscalização e Consultadoria, Lda / REFER), 2008 • Construction and Demolition Waste Management Prevention Plan of the Expansion of Sintra Retail Park (CPU), 2008 • Environmental Management Plan for the Contract Works of the Construction Shell of the 55th (Partial) Link, Odivelas Terminus of the Lisbon Metropolitan Yellow Line (Metropolitano de Lisboa E.P.) (SOMAGUE and TECNASOL), 2004 • Environmental Management Plan for the Demolition Works of the José Alvalade Stadium (AMBISIDER), 2004 • Environmental Consultant for Improving the Environmental Management System of General Cable Celcat (General Cable Celcat), 2004 • Environmental Performance Plan for the Évora Sanitary Waste Landfill (AMDE), 2003 • Environmental Risk Management Plan for the Évora Sanitary Waste Landfill (AMDE), 2003 • Environmental Performance Plan for the Oeste Sanitary Waste Landfill (RESIOESTE), 2003 • Environmental Management Plan for the Port of Viana do Castelo, Part 1 – Drawing up an Environmental Database (IPN), 2003 • Environmental Management Plan for the Dismantling Works of the Aldeia da Luz village (AMBISIDER), 2003 • Environmental Management Plan for the Demolition Works of half of the Luz Stadium (AMBISIDER), 2003 ENVIRONMENTAL/SAFETY AUDITS • H&S Audit (Legal Compliance) to BP – British Petroleums Facilities in Portugal (ARCADIS GMI), 2011 • H&S Audit (Legal Compliance) to BP – British Petroleums GPL Facilities in Portugal (ARCADIS GMI), 2010 • Environmental and H&S Audit (Legal Compliance) to TRW Facility in Ponte de Lima (ARCADIS GMI), 2009 • Environmental Assessment of the Lisbon Medical Park – Oeiras Hospital Project (Sheehan Medical Limited / Invescon), 2008 • Phase I Environmental Site Assessment to a Car Plant in Lisbon surroundings (ARCADIS GmbH Deutschland), 2006 • Environmental and H&S Audit (Legal Compliance) to Delphi – Automotive Systems Seixal Facility, in Portugal (ARCADIS GMI), 2006 • Assessment of Reliability of Five Sonae Sierra’s Shopping Centres - Vasco da Gama Shopping, CascaisShopping, MaiaShopping, LouresShopping and Rio Sul Shopping - Environmental Data Reports (SONAE SIERRA), 2005 • Phase I Environmental Site Assessment (update) to two Chemical Products Warehouses (Lisboa and Porto) (Confidential) (ARCADIS NL), 2005 • Audit to the Waste Management System for Mineral Waters Packaging – ÁGUA DO MARÃO, Lda. (INR – Waste National Institute), 2005 • Audit to the Waste Management System for Medical Waste– VALORMED, Sociedade Gestora de Resíduos de Embalagens e Medicamentos, Lda. (INR – Waste National Institute), 2005 • Audit to the Waste Management System for Waste Tyres – VALORPNEU, Sociedade de Gestão de Pneus, Lda. (INR – Waste National Institute), 2005 • Audit to the Waste Management System for Waste Batteries – ECOPILHAS, Sociedade Gestora de Resíduos de Pilhas e Acumuladores, Lda. (INR – Waste National Institute), 2005 • Audit to the Waste Management System for Waste Packaging – Sociedade Ponto Verde, S.A. (INR – Waste National Institute), 2005 • Due Diligence Environmental Audit to a Baking Facility at Cabanas – Palmela (Confidential) (ARCADIS NL), 2004 • Phase I Environmental Site Assessment to a Car Dealership (Confidential) (ARCADIS GMI), 2004 19 • Phase I Environmental Site Assessment to a Pharmaceutical Facility (Confidential) (ARCADIS GMI), 2004 RISK MANAGEMENT • Risk Assessment Study for the of the Cogeneration Plant of the Refinery of Porto (PORTCOGERAÇÃO, S.A.), 2010 CHARACTERIZATION STUDIES OF THE VALLEY DOWNSTREAM AND SURROUNDINGS OF SEVERAL DAM RESERVOIRS • Characterization Studies of the Valleys Downstream and Surroundings of the Régua, Valeira and Pocinho Dam Reservoir, EDP Produção (on going) • Characterization Studies of the Valley Downstream and Surroundings of the Baixo Sabor Dam Reservoir, EDP Produção (2012) • Characterization Studies of the Valley Downstream and Surroundings of the Carrapatelo Dam Reservoir, EDP Produção (2011) • Characterization Studies of the Valley Downstream and Surroundings of the Fridão Dam Reservoir, EDP Produção (2011) • Characterization Studies of the Valley Downstream and Surroundings of the Torrão Dam Reservoir, EDP Produção (2011) • Characterization Studies of the Valley Downstream and Surroundings of the Crestuma-Lever Dam Reservoir, EDP Produção (2010) • Characterization Studies of the Valley Downstream and Surroundings of the Foz Tua Dam Reservoir, EDP Produção (2010) HEALTH AND SAFETY PLANS (HSP) 20 • Health and Safety Plan for the Crossover km 65+372 and Underpass km 68+378, Profico – Projectos, Fiscalização e Consultadoria, Lda. (2008). • Health and Safety Plan for the Road Traffic Underpass at Castelo Branco Train Station (Profico – Projectos, Fiscalização e Consultadoria, Lda), 2007 • Health and Safety Plan for the French High School – Lisbon Remodelling (Profico – Projectos, Fiscalização e Consultadoria, Lda), 2007 • Health and Safety Plan for the Cascais Railway – 12D, S. João do Estoril (Profico – Projectos, Fiscalização e Consultadoria, Lda), 2007 • Health and Safety Plan for the Cinema Museum, Profico – Projectos, Fiscalização e Consultadoria, Lda. (2006). • Health and Safety Plan for the Vale da Asseca Bridge, Profico – Projectos, Fiscalização e Consultadoria, Lda. (2006). • Health and Safety Plan for the Vale da Asseca Bridge, Profico – Projectos, Fiscalização e Consultadoria, Lda. (2006). • Health and Safety Plan (HSP) for the Beira Baixa Covilhã / Guarda Trunk Line Ponte da Penha da Barroca (Profico – Projectos, Fiscalização e Consultadoria, Lda), 2006 • Health and Safety Plan (HSP) for the Beira Baixa Covilhã / Guarda Trunk Line – Ponte dos Gogos (Profico – Projectos, Fiscalização e Consultadoria, Lda), 2006 • Health and Safety Plan (HSP) for the Beira Baixa Covilhã / Guarda Trunk Line – Ponte de Maçaínhas (Profico – Projectos, Fiscalização e Consultadoria, Lda), 2006 • Health and Safety Plan (HSP) for the Beira Baixa Covilhã / Guarda Trunk Line – Ponte de Carpinteira (Profico – Projectos, Fiscalização e Consultadoria, Lda), 2006 • Health and Safety Plan (HSP) for the Beira Baixa Covilhã / Guarda Trunk Line – Ponte de Corges (Profico – Projectos, Fiscalização e Consultadoria, Lda), 2006 • Health and Safety Plan (HSP) for the Intermodal Interface Station of the Western Area of Campanhã – 2nd Phase (Profico – Projectos, Fiscalização e Consultadoria, Lda), 2006 • Health and Safety Plan (HSP) for the Project for the IKEA Store in Matosinhos (Profico – Projectos, Fiscalização e Consultadoria, Lda), 2005 • Health and Safety Plan (HSP) for the Construction Phase of the Contract Works for the Rain Drainage System of the Carcavelos Beach Seafront Path (Eastern Side), (TRAPSA), 2005 • Health and Safety Plan (HSP) for the Construction Phase of the Contract Works for Public Spaces, Access and Parking for the beaches of São João do Estoril and Carcavelos (JAOP/TRAPSA/TRAGSA), 2004 • Health and Safety Plan (HSP) for the Widening Project of the Peramanca Bridge (Profico – Projectos, Fiscalização e Consultadoria, Lda), 2004 HEALTH AND SAFETY MANAGEMENT OF WORKS • Health and Safety Management of the Machado de Castro High School, Profico – Projectos, Fiscalização e Consultadoria, Lda. (2008) 21 • Health and Safety Management of the Guarda Wind Farm extension, Centrais Eólicas Reunidas, S.A. (2008) • Health and Safety Management of the French High School – Lisbon Remodelling, Embaixada de França em Portugal (2007) • Health and Safety Management of the Dismantlement and Demolition of the SNESGES Deactivated Iron and Steel Plant, SNESGES – Administração e Gestão de Imóveis e Prestação de Serviços, S.A., 2007 • Health and Safety Management of the Rehabilitation and Extension Works of Rural Informática Building, RURAL INFORMÁTICA (2007) HEALTH AND SAFETY MONITORING OF WORKS • Health and Safety Monitoring of the Underwater Survey Programme of the Bridges – North Area 31 and South Area 30, Profico – Projectos, Fiscalização e Consultadoria, Lda., 2007 • Health and Safety Monitoring of the Contract Works for the Construction of Public Spaces, Access and Parking for the beaches of São João do Estoril and Carcavelos, JAOP/TRAPSA/TRAGSA (2007) • Health and Safety Monitoring of Storm Sewer Construction Works at the Sidewalk of Carcavelos Beach (East Side) (TRAPSA), 2006 • Health and Safety Monitoring in the Contract Works for the Construction of the Rain Drainage System of the Carcavelos Beach Seafront Path (Eastern Side), (TRAPSA), 2005 SOIL DECONTAMINATION 22 • Technical Specifications of Cleaning and Decontamination Works of the Technical Gallery and Foundations Area of the Canteen Building at Tabaqueira – Tobacco Industrial Company, S.A. (GESBAU – Engenharia de Gestão, S.A.), 2012 • Advising Service for Soil Contamination Evaluation in FERRO PORTUGAL Industrial Site in Castanheira do Ribatejo (FERRO - Indústrias Químicas de Portugal, Lda.), 2011 • Deactivation Plan of the FERRO PORTUGAL Plant at Castanheira do Ribatejo (FERRO - Indústrias Químicas de Portugal, Lda.), 2011 • Technical Report on Soils and Groundwater Contamination (GALP POWER, S.A.), 2009 • Technical Reports on Soil Contamination of Maia lands regarding Expert Proceeding between Urbindústria and Siderurgia Nacional – Empresa de Produtos Longos, S.A. (Iron and Steel Industry) (Urbindústria), 2007 • Evaluation of the Decontamination Solution for an Industrial Site at Santa Iria de Azóia (Confidential), 2002 23 PROFICO AMBIENTE E ORDENAMENTO, LDA. Morada: Rua Alfredo da Silva 11-B 1300-040 Lisboa E-mail: [email protected] Tel.: (+351) 21 361 93 60 Fax: (+351) 21 361 93 69 www.proficoambiente.pt