Object Reports INDULSNAP
Transcrição
Object Reports INDULSNAP
Wall air passage INDULSNAP MGUV Potsdam - New Ministerial Building Photo © Christian Richters New Ministerial Building for the Brandenburg State Government Features A new ministerial building with an area of 10,000 square metres for 460 employees has been constructed on the government site in the Henning-vonTreskow Straße. This new construction is the final stage of the combination of the merger of the ministries, which moves them into the centre of the city and near to the new state parliament building. With an annual primary energy consumption of only 50 kWh/m², the barrier-free building fulfils the requirements of the passive buildings standard, and with surface heating and concrete core cooling is both sustainable and energy-efficient. Constructed in a public-private partnership, the design by the company SEHW Architektur is grouped around three differently designed courtyards. The shell of the building was developed so as to have many vertical layers and variations. With the combined air diffuser INDULSNAP V45 K it was possible to implement an identical and consistent appearance for the supply air and extraction air. Due to the airflow rate of 30m³/h per person or 60m³/h for a twoperson office as specified by IDA 3, an overall installation length of only 860 mm was sufficient. For acoustic reasons, the corridor partition walls have a thickness of 150 mm. The air plenum box which is integrated into the corridor wall was adapted to this wall thickness for installation reasons. With this, the recommended installation sequence with attachment points on the cladding remained unchanged and could be quickly carried out. The plenum box was fastened by clamping it into the drywall profiles in agreement with the air conditioning and drywall construction contractors. Kiefer INDULSNAP V45 as combined air outlet supply air / extract air Maschinenfabrik Gg. Kiefer GmbH Heilbronner Straße 380-396 70469 Stuttgart, Germany Tel.: +49 (0)711 8109-0 Fax: +49 (0) 711 8109-205 E-Mail: [email protected] www.kieferklima.de Wall air passage INDULSNAP MGUV Potsdam - New Ministerial Building Function wall air passage INDULSNAP: IINDULSNAP is a linear diffuser for installation in partition walls with integral silencer offering a high degree of comfort. The supply air is fed into the room through numerous individual jets guided by aerodynamically formed fins. The ducts for supplying and extract-ing air are best installed in the ceiling hollow space of that floor. The main distribution ducts to individual rooms require a minimum of space for installation. Object: New Ministerial Building Potsdam Architects: LPH 1 - 5 ARGE SEHW – delusearchitects LPH 5 - 8 GKK (Gössler Kinz Kerber Kreienbaum, Hamburg) Proprietor: Brandenburgischer Landesbetrieb für Liegenschaften und Bauen, NL Potsdam System advantages: With integral silencer PP-Partnership For use as inlet or outlet Volume flow up to 250 m³/hm Input attenuation ≥ 34 dBA Higher thermal comfort due to draught-free air distribution Fast installation represented by: STRABAG Real Estate GmbH Direktion Public Private Partnerchip Customer: Ed. Züblin AG, Bereich Brandenburg und Sachsen-Anhalt Consultant: Ingenieurbüro Knott + Partner, Berlin Linear diffuser: system Wall air passage INDULSNAP V45 Easy to clean as specified in VDI 6022 E3013-72_05/16 ensured by removable air guide profiles Photo © Christian Richters Maschinenfabrik Gg. Kiefer GmbH Heilbronner Straße 380-396 70469 Stuttgart, Germany Tel.: +49 (0)711 8109-0 Fax: +49 (0) 711 8109-205 E-Mail: [email protected] www.kieferklima.de Wall Air Passage INDULSNAP Photo © Mercedes-Benz Bank Mercedes-Benz-Bank Stuttgart At the headquarters of the Mercedes-Benz Bank in Stuttgart, in which four sites have been combined in a single central building, about 1000 employees occupy 28,000 m². Transparency and flexibility are the company values that are successfully reflected in this new building. Function wall INDULSNAP: air passage INDULSNAP is a linear diffuser for installation in partition walls with integral silencer offering a high degree of comfort. The supply air is fed into the room through numerous individual jets guided by aerodynamically formed fins. The ducts for supplying and extracting air are best installed in the ceiling hollow space of that floor. The main distribution ducts to individual rooms require a minimum of space for installation. Building: Mercedes-Benz Bank, Stuttgart Architects: Zlitz + Partner, Stuttgart Interior architects: Hinrichsmeyer + Bertsch, Böblingen Proprietor: Häussler Gruppe, Stuttgart General contractor: Bilfinger + Berger Bau AG, Stuttgart Consultant, building services: Ingenieurbüro Scheer, Wendlingen Linear diffuser system: Wall air passage INDULSNAP Type of ceiling: Plasterboard ceilings Scope: 28,000 m² conditioned area Scope of order: 1,760 rm. of wall air passages INDULSNAP Type V20 3013-07_04/13 System advantages: With integral silencer For use as inlet or outlet Volume flow up to 250 m³/hm. Input attenuation ≥ 34 dB Greater thermal comfort due to draught-free air supply Fast installation. Easy to clean, as specified in VDI 6022, due to removable air guide profiles Maschinenfabrik Gg. Kiefer GmbH Heilbronner Straße 380-396 70469 Stuttgart, Germany Tel.: +49 (0)711 8109-0 Fax: +49 (0) 711 8109-205 E-Mail: [email protected] www.kieferklima.de Wall air passage INDULSNAP SAP Deutschland AG – Walldorf: Campus II Function wall INDULSNAP air passage INDULSNAP is a linear diffuser for installation in partition walls with integral silencer offering a high degree of comfort. The supply air is fed into the room through numerous individual jets guided by aerodynamically formed fins. The ducts for supplying and extracting air are best installed in the ceiling hollow space of that floor. The main distribution ducts to individual rooms require a minimum of space for installation. System advantages ■ With integral silencer ■ For use as inlet or outlet ■ Greater thermal comfort due to ■ E3013_24 12/08 ■ ■ ■ Photo © SAP AG / Stefan Schilling With the new Campus II building in Walldorf, the Häussler Group from Stuttgart has created an office and space concept that fulfils the most demanding requirements with respect to temperature, humidity and acoustics combined with a flexible interior layout. Future-oriented workplaces and the well-being of the employees were the guiding principles. With 2,100 new office workplaces, 24 conference rooms, and a cafeteria seating 1,500 persons, this new landmark building in Walldorf's "SAP City" has been successfully completed. draught-free air supply Absorption box can be installed in partition wall Requires no space in room. Fast installation. Easy to clean, as specified in VDI 6022, due to removable air guide profiles Building: SAP Deutschland AG Walldorf: Campus II Architects: Vorfelder Freie Architekten Walldorf Proprietor and investor: SAP AG Consultant, building services: Zimmermann + Partner GmbH Walldorf Consultant, building physics: GH Bauphysik Finkenberger + Kollegen Stuttgart Installation: INDULSNAP V45K 2,750 units Air flow: Up to 160 m³/hm Input attenuation: ≥ 34 dB Supply air temperature difference: Max. – 8K Diffuser width: 45 mm Maschinenfabrik Gg. Kiefer GmbH ● Heilbronner Straße 380-396 ● 70469 Stuttgart, Germany Tel.: +49 (0)711 8109-0 ● Fax: +49 (0) 711 8109-205 ● E-Mail: [email protected] ● www.kieferklima.de Wall air passage INDULSNAP SpOrt Stuttgart Photo © SpOrt Stuttgart Outstanding competence in sport is united beneath the roof of SpOrt Stuttgart. An effective area of 20,000 m² houses sports associations, companies with sporting links, and medical services associated with sport. For active sport, a fitness studio, a multi-purpose sports hall with a grandstand, and a range of training and event rooms are available. SpOrt Stuttgart lies in the heart of the Stuttgart's NeckarPark close to the Daimler Stadium, the Porsche Arena and the Kunst-Turn-Forum. Function wall air passage INDULSNAP INDULSNAP is a linear diffuser for installation in partition walls with integral silencer offering a high degree of comfort. The supply air is fed into the room through numerous individual jets guided by aerodynamically formed fins. The ducts for supplying and extracting air are best installed in the ceiling hollow space of that floor. The main distribution ducts to individual rooms require a minimum of space for installation. Building: SpOrt Stuttgart Architects: Hermann + Bosch Freie Architekten BDA, Stuttgart Proprietor: SpOrt Stuttgart Stuttgart General contractor: Kubus Generalplaner Stuttgart Consultant, building services: T.P.I Trippe + Partner Ingenieurgesellschaft Stuttgart Linear diffuser system: Wall air passage INDULSNAP Scope: 4,500 m² conditioned area System advantages With integral silencer For use as inlet or outlet Volume flow up to 250 m³/hm. Input attenuation ≥ 34 dB Greater thermal comfort due to draught-free air supply ■ Fast installation. ■ Easy to clean, as specified in VDI 6022, due to removable air guide profiles E3013_8 12/08 ■ ■ ■ ■ ■ Maschinenfabrik Gg. Kiefer GmbH ● Heilbronner Straße 380-396 ● 70469 Stuttgart, Germany Tel.: +49 (0)711 8109-0 ● Fax: +49 (0) 711 8109-205 ● E-Mail: [email protected] ● www.kieferklima.de